This tabulation indicates all changes made by amendments, additions, and repeals to Colorado Revised Statutes by the Seventy-fifth General Assembly at its First Regular Session in 2025. These changes will appear in the 2025 Colorado Revised Statutes. Final Version - last updated 6/25/2025 9:55 a.m. MDT Jump to Red Book 2025B Title 1 Title 13 Title 25 Title 35 Title 2 Title 14 Title 25.5 Title 36 Title 3* Title 15 Title 26 Title 37 Title 4* Title 16 Title 26.5 Title 38 Title 5* Title 17 Title 27 Title 39 Title 6 Title 18 Title 28 Title 40 Title 7 Title 19 Title 29 Title 41* Title 8 Title 20 Title 30 Title 42 Title 9 Title 21 Title 31 Title 43 Title 10 Title 22 Title 32 Title 44 Title 11 Title 23 Title 33 Title 12 Title 24 Title 34 * These titles were not amended Explanation of Symbols C.R.S. Colorado Revised Statutes section number A Amended IP Introductory portion of a section,subsection, paragraph, or subparagraph N New NC No change in existing law R Repealed RE Repealed and reenacted RC Recreated and reenacted Changes by C.R.S. Section Number TITLE 1 Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date 1-1-104 (7.3) N H-25-1319 272 1 05/28/2025 3, 4 1-1-104 (19.5)(a)(XIII) A S-25-001 178 1 08/06/2025 4 1-1-104 (22.6) N H-25-1315 180 1 08/06/2025 3, 4 1-1-104 (51) A H-25-1155 35 1 08/06/2025 2, 4 1-1-116 (3) A H-25-1239 232 8 08/06/2025 3, 4 1-1-117 N S-25-001 178 2 08/06/2025 4 1-2-300.3 N S-25-275 377 1 08/06/2025 4 1-2-301 (1) A S-25-275 377 2 08/06/2025 4 1-3-103 (1)(a) A H-25-1315 180 2 08/06/2025 4 1-3-103 (12) A H-25-1315 180 2 08/06/2025 4 1-3-103 (13) A H-25-1315 180 2 08/06/2025 4 1-3-103 (14) N H-25-1315 180 2 08/06/2025 4 1-3-103 (15) N H-25-1315 180 2 08/06/2025 3, 4 1-5-102.9 (5)(e) A S-25-001 178 4 08/06/2025 3, 4 1-5-105 (1) A S-25-001 178 3 08/06/2025 1-5-505.5 (1)(d) N H-25-1319 272 2 05/28/2025 4 1-5-505.5 (1)(e) N H-25-1315 180 3 08/06/2025 4, 35 1-5-600.3 N S-25-275 377 3 08/06/2025 4, 158 1-5-601 (2) R S-25-275 377 336 08/06/2025 3, 4 1-5-702 (2.7) N S-25-001 178 5 08/06/2025 3, 4 1-5-707 N S-25-001 178 6 08/06/2025 4, 36 1-6-100.3 N S-25-275 377 4 08/06/2025 4, 159 1-6-101 (1) R S-25-275 377 336 08/06/2025 4, 159 1-6-101 (7)(b) R S-25-275 377 336 08/06/2025 3, 4 1-7-110 (5) A S-25-001 178 7 08/06/2025 4, 37 1-7-1001.3 N S-25-275 377 7 08/06/2025 4, 38 1-7-1001.3 N S-25-275 377 8 03/01/2026 4, 87, 161 1-7-1002 (1) R S-25-275 377 336 08/06/2025 4, 88, 160 1-7-1002 (1) R S-25-275 377 336 08/06/2025 4 1-7.5-113.5 (3)(c)(II) A S-25-275 377 5 08/06/2025 3, 4 1-10.5-102 (2) A H-25-1155 35 2 08/06/2025 3, 4 1-10.5-102 (3)(a)(III) A S-25-001 178 9 08/06/2025 3, 4 1-10.5-103 A H-25-1155 35 3 08/06/2025 3, 4 1-10.5-107 (1) A S-25-001 178 10 08/06/2025 3, 4 1-10.5-107 (2) A S-25-001 178 10 08/06/2025 3, 4 1-10.5-107 (3) A S-25-001 178 10 08/06/2025 3, 4 1-10.5-107 (4) A S-25-001 178 10 08/06/2025 4 1-12-203 (1) A H-25-1315 180 4 08/06/2025 4 1-12-203 (1.5) N H-25-1315 180 4 08/06/2025 4 1-12-203 (1.7) N H-25-1315 180 4 08/06/2025 4 1-12-203 (3)(a) A H-25-1315 180 4 08/06/2025 1-12-206 (1) A H-25-1319 272 3 05/28/2025 1-12-206 (5) A H-25-1319 272 3 05/28/2025 1-12-206 (8) N H-25-1319 272 3 05/28/2025 1-12-206 (9) N H-25-1319 272 3 05/28/2025 3, 4 1-13-714 (1)(a) A S-25-001 178 8 08/06/2025 2 1-13-726 N H-25-1225 179 2 05/12/2025 3, 4 1-13.5-513 (3.5) N S-25-172 87 1 08/06/2025 3, 4 1-13.5-513 (4) A S-25-172 87 1 08/06/2025 3 1-40-105 (4) A H-25-1327 446 1 06/04/2025 3 1-40-105.5 (1.5)(a)(I) A H-25-1327 446 2 06/04/2025 3 1-40-106 (1) A H-25-1327 446 3 06/04/2025 3 1-40-106 (3)(c) A H-25-1327 446 3 06/04/2025 3 1-40-106 (3)(g) A H-25-1327 446 3 06/04/2025 3 1-40-107 (1)(a)(I) A H-25-1327 446 4 06/04/2025 3 1-40-107 (1)(c) A H-25-1327 446 4 06/04/2025 3 1-40-111 (1) A H-25-1327 446 5 06/04/2025 3 1-40-124.5 (1)(e) N H-25-1327 446 6 06/04/2025 3 1-40-124.5 (1.5) A H-25-1327 446 6 06/04/2025 122 1-45-103 (2) A H-25-1319 272 4 05/28/2025 4, 122 1-45-103 (2) A H-25-1315 180 5 08/06/2025 122 1-45-103 (8) A H-25-1319 272 4 05/28/2025 4, 122 1-45-103 (8) A H-25-1315 180 5 08/06/2025 4 1-45-103 (19) N H-25-1315 180 5 08/06/2025 1-45-103.7 (4.7) N H-25-1319 272 5 05/28/2025 4 1-45-103.7 (4.8) N H-25-1315 180 6 08/06/2025 4 1-45-108 IP(2)(a)(I) A H-25-1315 180 7 08/06/2025 122 1-45-108 (2)(a)(I)(C) A H-25-1319 272 6 05/28/2025 4, 122 1-45-108 (2)(a)(I)(C) A H-25-1315 180 7 08/06/2025 122 1-45-108 (2)(a)(I)(D) A H-25-1319 272 6 05/28/2025 4, 122 1-45-108 (2)(a)(I)(D) A H-25-1315 180 7 08/06/2025 4 1-45-108 (2)(a)(I)(E) A H-25-1315 180 7 08/06/2025 1-45-108 (2)(a)(I)(F) A H-25-1319 272 6 05/28/2025 4 1-45-108 (2)(a)(VI) N H-25-1315 180 7 08/06/2025 3, 4 1-47- (entire article 47) N S-25-001 178 11 08/06/2025 TITLE 2 Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date 2-2-307 (3)(d) N S-25-199 149 11 04/30/2025 3 2-2-322 (6) N H-25-1327 446 7 06/04/2025 4, 39 2-2-700.3 N S-25-275 377 9 08/06/2025 4, 162 2-2-701 (4) R S-25-275 377 336 08/06/2025 4 2-2-703 R S-25-210 112 1 08/06/2025 4 2-2-1304 (1)(e) N S-25-164 168 1 08/06/2025 4 2-2-1304 (1)(f) N S-25-164 168 1 08/06/2025 2-2-1305.5 (1) A S-25-199 149 2 04/30/2025 2-2-1305.5 (6)(a) R S-25-199 149 2 04/30/2025 2 2-2-1601 (1)(c) A S-25-317 385 2 06/03/2025 2 2-2-1601 (1)(d) N S-25-317 385 2 06/03/2025 2-2-1601 (2.7) N S-25-264 129 1 04/25/2025 2 2-2-24 (entire part 24) N H-25-1183 349 2 06/02/2025 2-2-25 (entire part 25) N S-25-155 217 1 05/20/2025 4 2-3-100.3 N S-25-275 377 10 08/06/2025 4 2-3-101 (1) A S-25-275 377 11 08/06/2025 2-3-119 A S-25-270 151 9 05/01/2025 4 2-3-131 N S-25-306 430 1 08/06/2025 4 2-3-132 N S-25-306 430 1 08/06/2025 4, 40 2-3-200.3 N S-25-275 377 12 08/06/2025 4, 163 2-3-210 (2) R S-25-275 377 336 08/06/2025 4 2-3-210 (3)(a.5)(I) A S-25-275 377 13 08/06/2025 4 2-3-300.3 N S-25-275 377 14 08/06/2025 4 2-3-301 (1) A S-25-275 377 15 08/06/2025 4 2-3-303 IP(1) A S-25-309 300 1 08/06/2025 4 2-3-303 (1)(h) N S-25-309 300 1 08/06/2025 2-3-303.3 (3)(e) N S-25-199 149 1 04/30/2025 2-3-303.3 (3)(f) N S-25-199 149 1 04/30/2025 4 2-3-313 N S-25-190 286 4 08/06/2025 4 2-3-500.3 N S-25-275 377 16 08/06/2025 4 2-3-501 A S-25-275 377 17 08/06/2025 4 2-3-511 A H-25-1333 409 1 08/06/2025 4 2-3-600.3 N S-25-275 377 19 08/06/2025 4 2-3-601 (1) A S-25-275 377 20 08/06/2025 4 2-3-700.3 N S-25-275 377 18 08/06/2025 4 2-3-900.3 N S-25-275 377 21 08/06/2025 4 2-3-901 IP(1) A S-25-275 377 22 08/06/2025 4 2-3-1203 (16)(a)(II) R S-25-277 244 3 08/06/2025 4 2-3-1203 (16)(a)(III) R S-25-171 75 1 08/06/2025 4 2-3-1203 (16)(a)(V) R S-25-181 323 1 08/06/2025 4 2-3-1203 (16)(a)(VI) R S-25-175 321 1 08/06/2025 4 2-3-1203 (16)(a)(VII) R S-25-177 170 1 08/06/2025 4 2-3-1203 (18)(a)(I) R S-25-049 198 2 08/06/2025 4 2-3-1203 (20)(a)(X) N S-25-277 244 3 08/06/2025 4, 157 2-3-1203 (21)(a)(II) N S-25-177 170 1 08/06/2025 4 2-3-1203 (21)(a)(II) N H-25-1283 225 7 08/06/2025 4 2-3-1203 (21)(a)(III) N S-25-181 323 1 08/06/2025 2-3-1203 (22)(a)(VII) N H-25-1154 230 16 05/22/2025 2 2-3-1203 (22)(a)(VIII) N S-25-290 274 3 05/28/2025 4 2-3-1203 (23.5)(a)(II) N S-25-193 371 2 08/06/2025 4 2-3-1203 (26) N S-25-175 321 1 08/06/2025 4 2-3-1302 (1.5) A H-25-1313 405 1 08/06/2025 4 2-3-1302 (2) A H-25-1313 405 1 08/06/2025 2-3-1302 (3) N S-25-199 149 12 04/30/2025 4 2-3-1304 (1)(a.5) A H-25-1313 405 2 08/06/2025 2-3-1502 (6) R H-25-1027 65 5 04/10/2025 14 2-3-1503 (1)(a) A H-25-1027 65 6 04/10/2025 14 2-3-1503 (1)(a) A S-25-199 149 3 04/30/2025 2-3-1503 (2) A H-25-1027 65 6 04/10/2025 2-3-1901 (2)(a) A S-25-199 149 4 04/30/2025 4 2-3-1901 (2)(b) R S-25-300 428 1 08/06/2025 4 2-3-1901 (2)(c) R S-25-300 428 1 08/06/2025 4 2-3-1901 (2)(d) R S-25-300 428 1 08/06/2025 2-3-1901 (2)(e)(V) N S-25-199 149 4 04/30/2025 2-3-21 (entire part 21) N H-25-1057 268 1 05/28/2025 3, 4 2-4-5 (entire part 5) N S-25-061 265 1 08/06/2025 3, 4 2-4-6 (entire part 6) N S-25-061 265 2 08/06/2025 4 2-5-100.3 N S-25-275 377 23 08/06/2025 4 2-5-101 (1) A S-25-275 377 24 08/06/2025 3, 4 2-5-102 (7) A S-25-133 57 11 08/06/2025 2-5-126 (2)(bb) N S-25-082 12 1 03/14/2025 TITLE 6 Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date 4 6-1-105 (1)(iiii) N S-25-282 412 3 08/06/2025 3, 4 6-1-105 (1)(jjjj) N H-25-1217 92 3 08/06/2025 3, 4 6-1-105 (1)(kkkk) N H-25-1161 438 2 08/06/2025 3, 4 6-1-105 (1)(llll) N H-25-1197 279 3 08/06/2025 2, 3 6-1-105 (1)(mmmm) N H-25-1117 391 4 06/03/2025 4 6-1-105 (1)(nnnn) N H-25-1329 407 2 08/06/2025 4 6-1-105 (1)(oooo) N S-25-071 313 1 08/06/2025 2, 4 6-1-105 (1)(pppp) N S-25-299 427 3 08/06/2025 4 6-1-112 (1)(a) A S-25-282 412 1 08/06/2025 4 6-1-112 (1)(b) A S-25-282 412 1 08/06/2025 4 6-1-112 (1)(c) A S-25-282 412 1 08/06/2025 4 6-1-112 (4) N S-25-282 412 1 08/06/2025 4 6-1-208 N S-25-069 196 3 08/06/2025 6-1-707 (1)(e)(I)(B) A H-25-1154 230 17 05/22/2025 2, 3, 17 6-1-720 IP(1) A H-25-1090 94 3 01/01/2026 3, 4 6-1-730 (2.5) N H-25-1010 174 2 08/06/2025 3, 4 6-1-730 (3.5) N H-25-1010 174 2 08/06/2025 3 6-1-732 (1)(d) A S-25-145 368 1 02/16/2026 3, 4 6-1-732 (1)(d.7) N S-25-145 368 1 08/06/2025 3, 4 6-1-732 (2)(d) RE S-25-145 368 1 08/06/2025 3, 4 6-1-732 (2.5) N S-25-145 368 1 08/06/2025 3, 4 6-1-732 (7) N S-25-145 368 1 08/06/2025 2, 3, 17 6-1-737 N H-25-1090 94 2 01/01/2026 3, 4 6-1-738 N H-25-1217 92 2 08/06/2025 4 6-1-739 N S-25-282 412 2 08/06/2025 1, 3 6-1-740 N S-25-072 283 2 05/29/2025 2, 210 6-1-1303 (17.4) N S-25-276 240 18 05/23/2025 2, 143 6-1-1303 (17.5) R S-25-276 240 19 05/23/2025 2 6-1-1303 (24)(c) A S-25-276 240 19 05/23/2025 2 6-1-1303 (24)(d) A S-25-276 240 19 05/23/2025 2 6-1-1303 (24)(e) N S-25-276 240 19 05/23/2025 2 6-1-1308 (7) A S-25-276 240 20 05/23/2025 4 6-1-1402 (5) A S-25-070 417 1 08/06/2025 1, 17 6-1-1503 (5)(o) N H-25-1330 408 2 01/01/2026 1, 17 6-1-1503 (5)(p) N H-25-1330 408 2 01/01/2026 2, 4 6-1-18 (entire part 18) N S-25-299 427 2 08/06/2025 4 6-4.5- (entire article 4.5) N S-25-126 419 1 08/06/2025 4 6-29- (entire article 29) N S-25-071 313 2 08/06/2025 TITLE 7 Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date 4, 41 7-80-700.3 N S-25-275 377 25 08/06/2025 4, 164 7-80-713 (2) R S-25-275 377 336 08/06/2025 4 7-90-1003 IP(1) A S-25-300 428 2 08/06/2025 4 7-90-1003 IP(1.5) A S-25-300 428 2 08/06/2025 4, 42 7-117-100.3 N S-25-275 377 26 08/06/2025 4, 165 7-117-101 (1) R S-25-275 377 336 08/06/2025 7-121-401 (33.5)(b)(V) A S-25-270 151 10 05/01/2025 4, 43 7-137-100.3 N S-25-275 377 27 08/06/2025 4, 166 7-137-101 (1)(a) R S-25-275 377 336 08/06/2025 TITLE 8 Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date 3, 4 8-2-113 (2)(a) A S-25-083 366 1 08/06/2025 3, 4 8-2-113 (2)(b) A S-25-083 366 1 08/06/2025 3, 4 8-2-113 IP(2)(c) A S-25-083 366 1 08/06/2025 3, 4 8-2-113 (2)(c)(I) A S-25-083 366 1 08/06/2025 3, 4 8-2-113 (2)(c)(I.3) N S-25-083 366 1 08/06/2025 3, 4 8-2-113 (2)(c)(I.4) N S-25-083 366 1 08/06/2025 3, 4 8-2-113 (2)(c)(I.5) N S-25-083 366 1 08/06/2025 3, 4 8-2-113 (2)(c)(I.6) N S-25-083 366 1 08/06/2025 3, 4 8-2-113 (2)(c)(I.7) N S-25-083 366 1 08/06/2025 3, 4 8-2-113 (2)(d) A S-25-083 366 1 08/06/2025 3, 4 8-2-113 (3)(b) A S-25-083 366 1 08/06/2025 3, 4 8-2-113 (3)(c) A S-25-083 366 1 08/06/2025 3, 4 8-2-113 (5) A S-25-083 366 1 08/06/2025 3, 4 8-2-113 (5.5) N S-25-083 366 1 08/06/2025 8-3.7-201 (1)(f) A H-25-1244 250 1 05/24/2025 8-3.7-202 IP(2) A H-25-1244 250 2 05/24/2025 2 8-3.8-101 (2) A S-25-276 240 21 05/23/2025 3, 4 8-4-101 (6) A H-25-1001 228 1 08/06/2025 3, 4 8-4-105 (2) A H-25-1001 228 2 08/06/2025 3, 4 8-4-109 IP(3)(b) A H-25-1001 228 3 08/06/2025 3, 4 8-4-109 (3.5) N H-25-1001 228 3 08/06/2025 3, 4 8-4-110 IP(1)(a) A H-25-1001 228 4 08/06/2025 3, 4 8-4-110 (1)(a)(II) A H-25-1001 228 4 08/06/2025 3, 4 8-4-110 (2) A H-25-1001 228 4 08/06/2025 3, 4 8-4-111 (1)(a)(II) A H-25-1001 228 5 08/06/2025 3, 4 8-4-111 (1)(a.5) N H-25-1001 228 5 08/06/2025 3, 4 8-4-111 IP(2)(a)(I) A H-25-1001 228 5 08/06/2025 3, 4 8-4-111 (2)(a)(III) R H-25-1001 228 5 08/06/2025 3, 4 8-4-111 (8) A H-25-1001 228 5 08/06/2025 3, 4 8-4-111 (9) N H-25-1001 228 5 08/06/2025 3, 4 8-4-113 (1)(a)(I.5) N H-25-1001 228 6 08/06/2025 3, 4 8-4-113 (5)(a) A H-25-1001 228 6 08/06/2025 3, 4 8-4-120 A H-25-1001 228 7 08/06/2025 3, 4 8-4-120.5 N H-25-1001 228 8 08/06/2025 4 8-4-124 (1)(a) A S-25-285 296 6 08/06/2025 8-6-101 (3)(a)(I) A H-25-1208 397 1 07/01/2025 8-6-101 (3.5) N H-25-1208 397 1 07/01/2025 4 8-7.5-102 (3)(b) A H-25-1325 255 1 08/06/2025 4 8-7.5-102 (4)(b) A H-25-1325 255 1 08/06/2025 4 8-7.5-102 (6)(b) A H-25-1325 255 1 08/06/2025 4 8-7.5-102 (7.5) N H-25-1325 255 1 08/06/2025 2, 4 8-7.5-104 (3.5) N H-25-1328 263 2 08/06/2025 4 8-7.5-104 (4)(c) A H-25-1325 255 2 08/06/2025 4 8-7.5-105 (1)(c)(II) A H-25-1325 255 3 08/06/2025 2, 4 8-7.5-108 N H-25-1328 263 3 08/06/2025 2, 4 8-7.5-109 N H-25-1328 263 3 08/06/2025 4 8-13.3-3 (entire part 3) R S-25-271 375 1 08/06/2025 3, 4 8-13.3-505 (1) A S-25-144 293 1 08/06/2025 3, 4 8-13.3-507 (3) A S-25-144 293 2 08/06/2025 2, 3 8-13.5-202 (1)(b) A S-25-128 280 2 05/29/2025 2, 3 8-13.5-202 (1)(c) A S-25-128 280 2 05/29/2025 8-15.7-305 (3.5) N S-25-264 129 2 04/25/2025 8-15.7-405 (3.5) N S-25-264 129 3 04/25/2025 4, 44 8-17-100.3 N S-25-275 377 28 08/06/2025 4, 167 8-17-101 (2) R S-25-275 377 336 08/06/2025 4 8-20-102 (5) N H-25-1267 252 1 08/06/2025 3, 4 8-20-104 (4)(c) N S-25-286 426 1 08/06/2025 4 8-20-107 N H-25-1267 252 2 08/06/2025 8-20-206.5 (7)(d) N S-25-305 429 9 06/04/2025 4 8-20.5-103 (7.5) R S-25-300 428 3 08/06/2025 8-20.5-103 (9)(f) N S-25-264 129 4 04/25/2025 2, 3, 155 8-42-101 (3)(a)(I) A H-25-1300 442 2 01/01/2028 2, 3, 155 8-42-101 (3)(c) N H-25-1300 442 2 01/01/2028 4 8-42-101 (3.5)(a)(I)(A) A S-25-186 285 1 08/06/2025 4 8-42-101 (3.5)(a)(I)(C) R S-25-186 285 1 08/06/2025 4 8-42-101 (3.5)(a)(I)(D.5) N S-25-186 285 1 08/06/2025 4 8-42-101 (3.5)(a)(I)(E) A S-25-186 285 1 08/06/2025 4 8-42-101 (3.5)(c)(I) A S-25-186 285 1 08/06/2025 4, 132 8-42-101 (3.6) A S-25-300 428 4 08/06/2025 4, 132 8-42-101 (3.6)(r)(I) A S-25-186 285 1 08/06/2025 2, 3, 155 8-42-101 (5) A H-25-1300 442 2 01/01/2028 2, 3, 155 8-43-404 (5)(a) A H-25-1300 442 3 01/01/2028 2, 3, 155 8-43-404 (10)(b) A H-25-1300 442 3 01/01/2028 2 8-44-112 (7)(a) A S-25-317 385 3 06/03/2025 2 8-44-112 (7)(a.5) N S-25-317 385 3 06/03/2025 2 8-46-101 IP(1)(b)(II) A S-25-317 385 4 06/03/2025 2 8-46-101 (1)(b)(III) N S-25-317 385 4 06/03/2025 2 8-46-102 (2)(g) A S-25-317 385 5 06/03/2025 2 8-46-202 IP(1)(b) A S-25-317 385 6 06/03/2025 2 8-46-202 (1)(b.5) N S-25-317 385 6 06/03/2025 8-46-202 (1.9) N S-25-264 129 5 04/25/2025 8-70-103 (11.5) R S-25-242 145 1 04/28/2025 4 8-70-103 (18.7) N S-25-275 377 30 08/06/2025 4 8-70-103 (23.3) N S-25-275 377 30 08/06/2025 4 8-70-103 (23.5) A S-25-275 377 30 08/06/2025 4, 45 8-70-103 (23.6) N S-25-275 377 30 08/06/2025 8-70-103 (24.5) A S-25-242 145 1 04/28/2025 8-70-103 (28.5) N S-25-242 145 1 04/28/2025 8-71-103 (2)(b)(I) A S-25-242 145 2 04/28/2025 4 8-73-102 (8)(a) A S-25-275 377 6 08/06/2025 4, 168 8-73-106 (1)(a) R S-25-275 377 336 08/06/2025 4 8-73-106 (2) A S-25-275 377 31 08/06/2025 8-73-116 (2)(e)(I) A S-25-242 145 4 04/28/2025 4 8-74-100.3 N S-25-275 377 32 08/06/2025 4 8-74-103 (1) A S-25-275 377 33 08/06/2025 8-76-102.5 IP(3)(a)(IV) A S-25-242 145 5 04/28/2025 8-77-109 (1)(b) A S-25-242 145 3 04/28/2025 8-77-109 (2)(a)(I)(B) A S-25-242 145 3 04/28/2025 8-77-109 (2)(a)(II)(A) A S-25-242 145 3 04/28/2025 8-77-109 (2)(a.9)(II)(A) A S-25-242 145 3 04/28/2025 8-77-109 IP(6)(a) A S-25-242 145 3 04/28/2025 8-77-109 (6)(b) A S-25-242 145 3 04/28/2025 8-83-107 (4)(a) A S-25-242 145 6 04/28/2025 8-83-107 (9) A S-25-242 145 6 04/28/2025 4 8-83-503 (3)(a) A S-25-181 323 2 08/06/2025 4 8-83-503 (3)(a.5) N S-25-181 323 2 08/06/2025 8-83-503 (3)(b) A S-25-037 364 1 06/03/2025 8-83-503 (3)(c) A S-25-037 364 1 06/03/2025 8-83-503 (3)(d) N S-25-037 364 1 06/03/2025 4 8-83-503 IP(4) A S-25-181 323 2 08/06/2025 4 8-83-503 (6)(a) A S-25-181 323 2 08/06/2025 4 8-83-503 (6)(b) R S-25-181 323 2 08/06/2025 4 8-83-503 IP(6)(c) A S-25-181 323 2 08/06/2025 4 8-83-503 IP(6)(d) A S-25-181 323 2 08/06/2025 4 8-83-503 (6)(e)(III)(A) A S-25-181 323 2 08/06/2025 4 8-83-503 (6)(e.5) N S-25-181 323 2 08/06/2025 4 8-83-503 (6)(i) A S-25-181 323 2 08/06/2025 2 8-83-504 (1) A S-25-317 385 7 06/03/2025 8-83-504 IP(4)(a)(II) A S-25-037 364 2 06/03/2025 8-83-504 (4)(a)(II)(C) A S-25-037 364 2 06/03/2025 8-83-504 (4)(a)(II)(D) A S-25-037 364 2 06/03/2025 8-83-504 (4)(a)(II)(E) N S-25-037 364 2 06/03/2025 8-83-504 (4)(a)(II.5) N S-25-037 364 2 06/03/2025 8-83-504.5 (1)(e) A S-25-037 364 3 06/03/2025 8-83-506 (2)(a) A S-25-037 364 4 06/03/2025 8-83-701 (4)(a) A S-25-243 120 1 04/25/2025 4 8-84-106 (3)(a) A H-25-1018 88 1 08/06/2025 4 8-84-106 (3)(b)(II) A H-25-1018 88 1 08/06/2025 4 8-84-106 (3)(b)(V) A H-25-1018 88 1 08/06/2025 4 8-84-106 (3)(b)(VII) A H-25-1018 88 1 08/06/2025 4 8-84-106 (3)(c)(I) A H-25-1018 88 1 08/06/2025 4 8-84-106 IP(3)(c)(II) A H-25-1018 88 1 08/06/2025 4 8-84-106 (3)(d) A H-25-1018 88 1 08/06/2025 4 8-84-208 A S-25-300 428 5 08/06/2025 4 8-88-102.5 N H-25-1017 231 1 08/06/2025 4 8-88-205 A H-25-1017 231 3 08/06/2025 TITLE 9 Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date 2 9-1.5-104.7 (4) N H-25-1215 312 2 05/30/2025 4 9-5.5-103 IP A S-25-275 377 34 08/06/2025 4 9-5.5-103 (15.5) N S-25-275 377 34 08/06/2025 4 9-5.5-111 (2)(b) A S-25-275 377 35 08/06/2025 4 9-5.7-101 (1)(e) A S-25-275 377 36 08/06/2025 4 9-5.7-102 (3.4) N S-25-275 377 37 08/06/2025 4 9-5.7-103 (5)(b) A S-25-300 428 6 08/06/2025 2, 4 9-5.8- (entire article 5.8) N H-25-1060 152 2 08/06/2025 TITLE 10 Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date 4 10-2-902 IP(5) A S-25-300 428 7 08/06/2025 4 10-2-902 (6) A S-25-300 428 7 08/06/2025 4 10-2-1002 IP(2)(a) A S-25-300 428 8 08/06/2025 2 10-3-209 (6)(d) N H-25-1296 202 3 05/16/2025 4, 46 10-3-601.5 N S-25-275 377 38 08/06/2025 4 10-3-602 IP(1) A S-25-275 377 39 08/06/2025 4, 169 10-3-603 R S-25-275 377 336 08/06/2025 3, 4 10-3-1104 (1)(g) A S-25-058 84 1 08/06/2025 3, 4 10-3-1104 IP(2) A S-25-058 84 1 08/06/2025 3, 4 10-3-1104 (2)(e) N S-25-058 84 1 08/06/2025 3, 4 10-3-1104 (2.1) N S-25-058 84 1 08/06/2025 3, 4 10-3-1104 (2.2) N S-25-058 84 1 08/06/2025 3, 4 10-3-1104 (2.3) N S-25-058 84 1 08/06/2025 3, 4 10-3-1104 (2.4) N S-25-058 84 1 08/06/2025 3, 4 10-3-1104 (2.5) N S-25-058 84 1 08/06/2025 3, 4 10-3-1104 (2.6) N S-25-058 84 1 08/06/2025 3, 4 10-3-1104 (2.7) N S-25-058 84 1 08/06/2025 3, 4 10-3-1104 (6) N S-25-058 84 1 08/06/2025 4 10-3.5-108 (3)(d) A H-25-1326 309 1 08/06/2025 4, 47 10-4-101.5 N S-25-275 377 40 08/06/2025 4, 170 10-4-110.6 R S-25-275 377 336 08/06/2025 3, 4 10-4-110.8 (10) A H-25-1322 406 1 08/06/2025 3, 4 10-4-110.8 (16)(a) A H-25-1207 224 1 08/06/2025 3, 4 10-4-110.8 (16)(b) A H-25-1207 224 1 08/06/2025 3, 16 10-4-124 N H-25-1182 278 1 07/01/2026 3, 92 10-4-601 (6) A H-25-1281 176 1 07/01/2027 3, 17 10-4-644 N H-25-1179 80 1 01/01/2026 10-4-1804 (1) A H-25-1205 81 1 04/17/2025 10-4-1804 (1.5) N H-25-1205 81 1 04/17/2025 10-4-1804 (2) A H-25-1205 81 1 04/17/2025 10-4-1804 (3)(b) A H-25-1205 81 1 04/17/2025 4 10-4-1807 (4)(a) A S-25-300 428 9 08/06/2025 10-4-1810.5 N H-25-1205 81 2 04/17/2025 4 10-11-102 (3.6) R S-25-277 244 4 08/06/2025 4 10-11-201 A S-25-277 244 1 08/06/2025 4 10-11-202 R S-25-277 244 2 08/06/2025 4 10-11-203 R S-25-277 244 2 08/06/2025 4 10-13-100.3 N S-25-275 377 41 08/06/2025 4 10-13-101 A S-25-275 377 42 08/06/2025 4 10-13-102 A S-25-275 377 43 08/06/2025 3, 4 10-15-102 (13)(b) A H-25-1217 92 1 08/06/2025 3, 4 10-15-102 (16.5) N H-25-1217 92 1 08/06/2025 10-15-111.7 IP(2) A H-25-1224 440 1 06/04/2025 10-15-111.7 (3) A H-25-1224 440 1 06/04/2025 4 10-16-102 (17.5) N S-25-275 377 44 08/06/2025 4 10-16-102 (29) A S-25-275 377 44 08/06/2025 4 10-16-102 (38.3) N S-25-275 377 44 08/06/2025 4 10-16-102 (48.5) N S-25-275 377 44 08/06/2025 2, 3, 4 10-16-102 (59.5) N H-25-1222 259 2 08/06/2025 3, 100 10-16-104 (3)(a)(VII) N S-25-118 284 1 01/01/2027 17 10-16-104 (5.5)(a)(I) A H-25-1002 18 1 01/01/2026 17 10-16-104 (5.5)(a)(I.5) N H-25-1002 18 1 01/01/2026 17 10-16-104 (5.5)(a)(V)(A) A H-25-1002 18 1 01/01/2026 17 10-16-104 (5.5)(a)(V)(B) A H-25-1002 18 1 01/01/2026 17 10-16-104 (5.5)(a)(V)(D) A H-25-1002 18 1 01/01/2026 17 10-16-104 (5.5)(a)(V)(F) N H-25-1002 18 1 01/01/2026 17 10-16-104 (5.5)(a)(VI) N H-25-1002 18 1 01/01/2026 17 10-16-104 (5.5)(b) A H-25-1002 18 1 01/01/2026 17 10-16-104 (5.5)(c.3) N H-25-1002 18 1 01/01/2026 17 10-16-104 (5.5)(c.5) N H-25-1002 18 1 01/01/2026 17 10-16-104 (5.5)(d) A H-25-1002 18 1 01/01/2026 17 10-16-104 (5.5)(e) N H-25-1002 18 1 01/01/2026 10-16-104 IP(18)(b) A S-25-196 182 1 05/12/2025 4 10-16-104 (18)(b.5) A S-25-296 287 1 08/06/2025 4 10-16-104 (18)(c)(III.5)(B) A S-25-296 287 1 08/06/2025 10-16-104 (18)(f) A S-25-196 182 1 05/12/2025 10-16-104 (18)(g) N S-25-196 182 1 05/12/2025 10-16-104 (26)(a) A S-25-183 97 1 01/01/2026 10-16-104 (26)(d) A S-25-183 97 1 01/01/2026 10-16-104 (26)(f) R S-25-183 97 1 01/01/2026 1, 2, 3, 100 10-16-104 (29) N S-25-048 365 3 01/01/2027 10-16-104 (30) N H-25-1309 233 1 05/23/2025 2, 3, 4 10-16-122.1 IP(3) A H-25-1222 259 3 08/06/2025 2, 3, 4 10-16-122.1 (3)(d) N H-25-1222 259 3 08/06/2025 2, 3, 4 10-16-122.3 (1.5) N H-25-1222 259 4 01/01/2026 2, 3, 4 10-16-122.3 (6)(b.3) N H-25-1222 259 4 01/01/2026 2, 3, 4 10-16-122.5 (1)(e) A H-25-1222 259 5 08/06/2025 2, 3, 4 10-16-122.5 (1)(f) A H-25-1222 259 5 08/06/2025 2, 3, 4 10-16-122.5 (1)(g) N H-25-1222 259 5 08/06/2025 3, 100 10-16-122.8 N H-25-1094 303 1 01/01/2027 4 10-16-124.5 (6.2) N S-25-301 288 1 08/06/2025 3, 8 10-16-135 IP(1)(a) A S-25-010 11 1 01/01/2026 3, 8 10-16-135 (1)(b) A S-25-010 11 1 01/01/2026 3, 8 10-16-135 (1)(c) A S-25-010 11 1 01/01/2026 3, 8 10-16-135 (1)(d) N S-25-010 11 1 01/01/2026 3, 8 10-16-135 (1)(e) N S-25-010 11 1 01/01/2026 4 10-16-150 (1)(g)(II) A S-25-193 371 1 08/06/2025 4 10-16-150 (1)(g)(III) A S-25-193 371 1 08/06/2025 4 10-16-150 (1)(g)(IV) N S-25-193 371 1 08/06/2025 4 10-16-150 (2)(a) A S-25-193 371 1 08/06/2025 4 10-16-150 (7) A S-25-193 371 1 08/06/2025 3, 8 10-16-170 N S-25-010 11 2 01/01/2026 4, 48 10-16-200.3 N S-25-275 377 45 08/06/2025 4, 171 10-16-213 (1) R S-25-275 377 336 08/06/2025 10-16-221 (3)(c) N S-25-199 149 5 04/30/2025 4 10-16-1002 (9.5) N S-25-275 377 46 08/06/2025 4 10-16-1009 (2) A S-25-275 377 47 08/06/2025 4 10-16-1203 (12)(c) A H-25-1213 276 1 08/06/2025 10-16-1205 (5)(a) A S-25-270 151 11 05/01/2025 10-16-1206 (1)(f) A H-25-1309 233 2 05/23/2025 10-16-1206 (1)(g) A H-25-1309 233 2 05/23/2025 10-16-1206 (1)(h) N H-25-1309 233 2 05/23/2025 10-16-1207 (4)(c.5)(III)(C) A H-25-1309 233 3 05/23/2025 10-16-1207 (4)(d) A H-25-1309 233 3 05/23/2025 10-16-1207 (4)(e) N H-25-1309 233 3 05/23/2025 4 10-20-113 (3) N S-25-026 362 4 08/06/2025 10-22-107 (1)(c) N S-25-199 149 6 04/30/2025 10-22-107 (5)(c) N S-25-199 149 6 04/30/2025 10-22.3-101 (3) A S-25-199 149 7 04/30/2025 TITLE 11 Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date 4 11-40-102 IP A S-25-275 377 48 08/06/2025 4 11-40-102 (3.5) N S-25-275 377 48 08/06/2025 4 11-40-102 (15.5) N S-25-275 377 48 08/06/2025 4 11-41-100.3 N S-25-275 377 49 08/06/2025 4 11-41-118 (7) A S-25-275 377 50 08/06/2025 4 11-42-111 (3) A S-25-275 377 51 08/06/2025 4 11-42-111 (4) A S-25-275 377 51 08/06/2025 4, 49 11-48-100.3 N S-25-275 377 52 08/06/2025 4 11-48-101 A S-25-275 377 53 08/06/2025 4, 172 11-48-103 R S-25-275 377 336 08/06/2025 4 11-49-101 A H-25-1184 210 1 08/06/2025 4 11-49-103 (2) A H-25-1184 210 2 08/06/2025 4 11-49-105 (4) N H-25-1184 210 3 08/06/2025 4 11-49-106 (1) A H-25-1184 210 4 08/06/2025 4 11-49-106 (2) A H-25-1184 210 4 08/06/2025 4 11-49-106 (3) A H-25-1184 210 4 08/06/2025 4 11-49-107 A H-25-1184 210 5 08/06/2025 4 11-49-109 A H-25-1184 210 6 08/06/2025 4 11-49-110 A H-25-1184 210 7 08/06/2025 4 11-49-111 (2) N H-25-1184 210 8 08/06/2025 4 11-49-111 (3) N H-25-1184 210 8 08/06/2025 4 11-49-111 (4) N H-25-1184 210 8 08/06/2025 4 11-49-112 IP(1) A H-25-1184 210 9 08/06/2025 4 11-49-112 (1)(e) R H-25-1184 210 9 08/06/2025 4 11-49-112 (1)(f) A H-25-1184 210 9 08/06/2025 4 11-49-113 A H-25-1184 210 10 08/06/2025 11-51-707 (4) N S-25-264 129 6 04/25/2025 4 11-102-305 (1)(a)(IV) A S-25-300 428 10 08/06/2025 4 11-102-306 (2)(c) A S-25-300 428 11 08/06/2025 11-102-403 A S-25-264 129 7 04/25/2025 4 11-110- (entire article 110) RE H-25-1201 91 1 08/06/2025 8 11-112- (entire article 112) N S-25-079 341 1 01/01/2026 TITLE 12 Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date 12-10-215 (3) N S-25-264 129 8 04/25/2025 2, 4 12-10-602 (9)(b)(VI) A H-25-1292 175 3 08/06/2025 12-10-801 (1) A S-25-184 242 2 05/24/2025 12-10-801 (2) A S-25-184 242 2 05/24/2025 12-10-801 (3)(b)(I) A S-25-184 242 2 05/24/2025 3, 11 12-10-801 (3)(c) A H-25-1043 433 1 10/01/2025 12-10-801 (6) A S-25-184 242 2 05/24/2025 4 12-15-101.5 N S-25-275 377 54 08/06/2025 4 12-15-102 (1) A S-25-275 377 55 08/06/2025 4 12-15-103 IP(1) A S-25-275 377 56 08/06/2025 12-20-105 (9) N S-25-264 129 9 04/25/2025 12-20-202 (5) A S-25-146 342 1 06/02/2025 4 12-20-407 (1)(a)(III) R S-25-174 310 8 08/06/2025 4 12-20-407 (2)(c) A S-25-174 310 8 08/06/2025 4 12-20-407 (2)(d) A S-25-174 310 8 08/06/2025 4 12-20-407 (2)(e) N S-25-174 310 8 08/06/2025 1, 2, 3, 4 12-30-102 (8.5) N S-25-152 167 3 08/06/2025 12-30-105 (5)(o) N S-25-196 182 2 05/12/2025 2, 4 12-30-108 (1) A H-25-1176 336 3 08/06/2025 2, 4 12-30-108 (2)(a) A H-25-1176 336 3 08/06/2025 2, 4 12-30-108 (4)(a)(I)(E) A H-25-1176 336 3 08/06/2025 2, 4 12-30-108 (4)(a)(II) R H-25-1176 336 3 08/06/2025 2, 4 12-30-108 (5) N H-25-1176 336 3 08/06/2025 2, 8 12-30-109 (2) A H-25-1285 305 14 01/01/2026 2, 8 12-30-109 (4)(e) A H-25-1285 305 14 01/01/2026 2, 8 12-30-109 (4)(f.5) N H-25-1285 305 14 01/01/2026 4 12-30-110 (1)(a) A S-25-164 168 6 08/06/2025 4 12-30-110 IP(1)(b) A S-25-164 168 6 08/06/2025 4 12-30-110 (2)(b) A S-25-164 168 6 08/06/2025 4 12-30-110 (3)(c) A S-25-164 168 6 08/06/2025 4 12-30-110 (4)(b) A S-25-164 168 6 08/06/2025 12-30-124 (16) N S-25-129 96 1 04/24/2025 4 12-30-125 N H-25-1087 332 1 08/06/2025 4 12-115-103 (2.5) A S-25-165 370 1 08/06/2025 4 12-115-103 (3) A S-25-165 370 1 08/06/2025 4 12-115-103 (7.5) N S-25-165 370 1 08/06/2025 4 12-115-103 (7.7) N S-25-165 370 1 08/06/2025 4 12-115-103 (9.3) N S-25-165 370 1 08/06/2025 4 12-115-103 (9.5) N S-25-165 370 1 08/06/2025 4 12-115-107 (2)(f) A S-25-165 370 5 08/06/2025 4 12-115-107 (2)(f.5) N S-25-165 370 5 08/06/2025 2 12-115-107 (5) N S-25-002 172 3 05/08/2025 4 12-115-110 (2)(a) A S-25-165 370 2 08/06/2025 4 12-115-110 IP(2)(b) A S-25-165 370 2 08/06/2025 4 12-115-110 (2)(b)(II) A S-25-165 370 2 08/06/2025 4 12-115-110 (3)(a) A S-25-165 370 2 08/06/2025 4 12-115-110 IP(3)(b) A S-25-165 370 2 08/06/2025 4 12-115-110 (3)(b)(II) A S-25-165 370 2 08/06/2025 4 12-115-110 (6) N S-25-165 370 2 08/06/2025 4 12-115-110 (7) N S-25-165 370 2 08/06/2025 4 12-115-111 A S-25-165 370 3 08/06/2025 100 12-115-115 (3.5) N H-25-1284 403 1 01/01/2027 4 12-115-117 (1)(l) A S-25-165 370 6 08/06/2025 4 12-115-117 (1)(m) N S-25-165 370 6 08/06/2025 3, 4 12-135-105 (1)(t) N H-25-1217 92 4 08/06/2025 4 12-135-114 (1)(a) A S-25-300 428 12 08/06/2025 4 12-135-114 IP(2) A S-25-300 428 12 08/06/2025 3, 4 12-135-501 (4)(b)(I) A H-25-1217 92 5 08/06/2025 12-135-502 (7) N S-25-146 342 3 06/02/2025 4 12-145-104 (3) N S-25-174 310 6 08/06/2025 4 12-145-106 (1) A S-25-174 310 7 08/06/2025 4 12-145-108 (1)(b.5) N S-25-174 310 4 08/06/2025 4 12-145-108 (2) A S-25-174 310 4 08/06/2025 4 12-145-109 (6)(b)(I) A S-25-174 310 3 08/06/2025 4 12-145-110 (3)(b) A S-25-174 310 5 08/06/2025 4 12-145-118 A S-25-174 310 1 08/06/2025 4, 89 12-155-103 (1.2) N H-25-1306 204 1 08/06/2025 4, 89 12-155-103 (1.4) N H-25-1306 204 1 08/06/2025 4, 90 12-155-103 (1.6) N H-25-1306 204 1 08/06/2025 4, 117 12-155-103 (5) R H-25-1306 204 2 08/06/2025 4, 118 12-155-103 (6) R H-25-1306 204 2 08/06/2025 4, 119 12-155-103 (7) R H-25-1306 204 2 08/06/2025 4 12-155-106 (1) A H-25-1306 204 3 08/06/2025 2 12-155-106 (6) N S-25-002 172 2 05/08/2025 12-155-118 (4) A H-25-1077 39 1 03/28/2025 100 12-155-124 (3.5) N H-25-1284 403 2 01/01/2027 12-155-126 N H-25-1077 39 2 03/28/2025 12-170-108 (5) N S-25-297 381 2 06/03/2025 4 12-215-103 (3.5) N S-25-275 377 57 08/06/2025 4 12-215-104 (1) A S-25-275 377 58 08/06/2025 4 12-220-104 (1) A S-25-194 171 1 08/06/2025 4 12-220-104 (4) A S-25-194 171 1 08/06/2025 4 12-220-104 (5.2) N S-25-194 171 1 08/06/2025 4, 93 12-220-104 (5.3) N S-25-194 171 1 08/06/2025 4 12-220-104 (9)(a) A S-25-194 171 1 08/06/2025 4 12-220-104 (10)(a) A S-25-194 171 1 08/06/2025 4 12-220-104 (10.5) N S-25-194 171 1 08/06/2025 4, 97 12-220-104 (11) R S-25-194 171 27 08/06/2025 4 12-220-104 (14.5) N S-25-194 171 1 08/06/2025 4 12-220-105 (1)(b)(II)(A) A S-25-194 171 2 08/06/2025 4 12-220-105 (5) A S-25-194 171 2 08/06/2025 4 12-220-106 IP(1)(a) A S-25-194 171 3 08/06/2025 4 12-220-106 (1)(a)(VI) N S-25-194 171 3 08/06/2025 4 12-220-106 (1)(a)(VII) N S-25-194 171 3 08/06/2025 4 12-220-106 (2) A S-25-194 171 3 08/06/2025 4 12-220-108 A S-25-194 171 4 08/06/2025 4 12-220-201 (1)(n) A S-25-194 171 5 08/06/2025 4 12-220-201 (1)(s) A S-25-194 171 5 08/06/2025 4 12-220-201 (1)(ii) A S-25-194 171 5 08/06/2025 4 12-220-201 (1)(oo) A S-25-194 171 5 08/06/2025 4 12-220-201 (1)(qq) N S-25-194 171 5 08/06/2025 4 12-220-201 (1)(rr) N S-25-194 171 5 08/06/2025 4 12-220-206 (4) N S-25-194 171 6 08/06/2025 4 12-220-206 (5) N S-25-194 171 6 08/06/2025 4 12-220-302 (1)(b) A S-25-194 171 7 08/06/2025 4 12-220-302 (1)(f) A S-25-194 171 7 08/06/2025 4 12-220-302 (1)(g) A S-25-194 171 7 08/06/2025 4 12-220-302 (1)(j) A S-25-194 171 7 08/06/2025 4 12-220-302 (1)(k) N S-25-194 171 7 08/06/2025 4 12-220-302 (1)(l) N S-25-194 171 7 08/06/2025 4 12-220-303 (2)(a) A S-25-194 171 8 08/06/2025 4 12-220-303 (3)(d) A S-25-194 171 8 08/06/2025 4 12-220-304 (3) A S-25-194 171 9 08/06/2025 4 12-220-305 (1)(a) A S-25-194 171 10 08/06/2025 4 12-220-305 (1)(b) A S-25-194 171 10 08/06/2025 4 12-220-305 (1)(c) A S-25-194 171 10 08/06/2025 4 12-220-305 (1)(d) A S-25-194 171 10 08/06/2025 4 12-220-305 (1)(j) A S-25-194 171 10 08/06/2025 4 12-220-305 (1)(k) A S-25-194 171 10 08/06/2025 4 12-220-305 (1)(l) A S-25-194 171 10 08/06/2025 4 12-220-305 (1)(m) A S-25-194 171 10 08/06/2025 4 12-220-305 (1)(n) A S-25-194 171 10 08/06/2025 4 12-220-305 (1)(p) A S-25-194 171 10 08/06/2025 4 12-220-305 (1)(q) A S-25-194 171 10 08/06/2025 4 12-220-305 (1)(r) A S-25-194 171 10 08/06/2025 4 12-220-305 (1)(s) N S-25-194 171 10 08/06/2025 4 12-220-305 (1)(t) N S-25-194 171 10 08/06/2025 4 12-220-305 (1)(u) N S-25-194 171 10 08/06/2025 4 12-220-305 (2) A S-25-194 171 10 08/06/2025 4 12-220-305 (3) N S-25-194 171 10 08/06/2025 4 12-220-306 (1)(a)(III) A S-25-194 171 11 08/06/2025 4 12-220-306 (1)(b) A S-25-194 171 11 08/06/2025 4 12-220-306 (3) N S-25-194 171 11 08/06/2025 4 12-220-306 (4) N S-25-194 171 11 08/06/2025 4 12-220-310 (1)(a) A S-25-194 171 12 08/06/2025 4 12-220-310 IP(1)(b) A S-25-194 171 12 08/06/2025 4 12-220-310 (1)(b)(IV) A S-25-194 171 12 08/06/2025 4 12-220-310 (2)(b) A S-25-194 171 12 08/06/2025 4 12-220-310 (2)(d) N S-25-194 171 12 08/06/2025 4 12-220-310 (5) A S-25-194 171 12 08/06/2025 4 12-220-402 (1)(a) A S-25-194 171 13 08/06/2025 4 12-220-405 IP(1)(a) A S-25-194 171 14 08/06/2025 4 12-220-407.2 IP(1)(a) A S-25-194 171 15 08/06/2025 4 12-220-407.2 (1)(b) A S-25-194 171 15 08/06/2025 4 12-220-409 (6) N S-25-194 171 16 08/06/2025 4 12-220-410 (7) N S-25-194 171 17 08/06/2025 4 12-220-411 (1) A S-25-194 171 18 08/06/2025 4 12-220-411 (5)(a) A S-25-194 171 18 08/06/2025 4 12-220-412 (1) A S-25-194 171 19 08/06/2025 4 12-220-501 (1)(a) A S-25-194 171 20 08/06/2025 4 12-220-501 (2) R S-25-194 171 20 08/06/2025 4 12-220-501 (3)(a)(VI) A S-25-194 171 20 08/06/2025 4 12-220-501 IP(3)(b) A S-25-194 171 20 08/06/2025 4 12-220-501 (3)(b)(III) A S-25-194 171 20 08/06/2025 4 12-220-502 A S-25-194 171 21 08/06/2025 4 12-220-503 IP(1) A S-25-194 171 22 08/06/2025 4 12-220-503 (1)(d)(II) A S-25-194 171 22 08/06/2025 4 12-220-503 (1)(d)(IV) A S-25-194 171 22 08/06/2025 4 12-220-503 (1)(d)(V) A S-25-194 171 22 08/06/2025 4 12-220-503 (1)(d)(VI) N S-25-194 171 22 08/06/2025 4 12-220-503 (1)(e.5) N S-25-194 171 22 08/06/2025 4 12-220-503 (1)(f) A S-25-194 171 22 08/06/2025 4 12-220-503 (1)(g)(I) A S-25-194 171 22 08/06/2025 4 12-220-503 (1)(g)(II)(A) R S-25-194 171 22 08/06/2025 4 12-220-503 (1)(g)(III)(A) A S-25-194 171 22 08/06/2025 4 12-220-503 (1)(g)(III)(B) A S-25-194 171 22 08/06/2025 4 12-220-503 (1)(g)(III)(C) A S-25-194 171 22 08/06/2025 4 12-220-503 IP(1)(g)(IV) A S-25-194 171 22 08/06/2025 4 12-220-503 (1)(g)(V) N S-25-194 171 22 08/06/2025 4 12-220-503 (1)(h) N S-25-194 171 22 08/06/2025 4 12-220-503 (2) A S-25-194 171 22 08/06/2025 4 12-220-503 (4) A S-25-194 171 22 08/06/2025 4 12-220-504 A S-25-194 171 23 08/06/2025 4 12-220-505 (1)(b) A S-25-194 171 24 08/06/2025 4 12-220-505 (6)(a) A S-25-194 171 24 08/06/2025 4 12-220-505 (6)(c) N S-25-194 171 24 08/06/2025 4 12-220-508 IP(1)(a) A S-25-194 171 25 08/06/2025 4 12-220-508 (1)(a)(VIII) A S-25-194 171 25 08/06/2025 4 12-220-508 (1)(c)(IX) N S-25-194 171 25 08/06/2025 4 12-220-508 (2)(a)(VI) A S-25-194 171 25 08/06/2025 4 12-220-508 (3)(a) A S-25-194 171 25 08/06/2025 4 12-220-508 (3)(d) N S-25-194 171 25 08/06/2025 3, 4 12-240-104 (5.8) R H-25-1024 59 1 08/06/2025 3, 4 12-240-104 (5.9) R H-25-1024 59 1 08/06/2025 3, 4 12-240-104 (6) A H-25-1024 59 1 08/06/2025 3, 4 12-240-104 (7) N H-25-1024 59 1 08/06/2025 3, 4 12-240-104 (8) N H-25-1024 59 1 08/06/2025 3, 4 12-240-104 (9) N H-25-1024 59 1 08/06/2025 3, 4 12-240-104 (10) N H-25-1024 59 1 08/06/2025 2, 4 12-240-115 A H-25-1176 336 2 08/06/2025 2, 4 12-240-121 (1)(e) A H-25-1176 336 5 08/06/2025 2, 4 12-240-121 (1)(i) A H-25-1176 336 5 08/06/2025 12-240-121 (1)(jj) N S-25-130 190 2 05/14/2025 2, 4 12-240-130 (2)(c) N H-25-1176 336 4 08/06/2025 2, 4 12-240-130 (2)(d) N H-25-1176 336 4 08/06/2025 3, 4 12-240-147 N H-25-1024 59 2 08/06/2025 12-245-217 (2)(g) A S-25-238 141 1 04/28/2025 12-245-217 (2)(h) A S-25-238 141 1 04/28/2025 12-245-217 (2)(i) R S-25-238 141 1 04/28/2025 4 12-245-217 (4) A H-25-1326 309 2 08/06/2025 4 12-245-220 IP(2) A H-25-1087 332 2 08/06/2025 4 12-245-220 (2)(d)(I) A H-25-1087 332 2 08/06/2025 4 12-245-220 (2)(d)(II) A H-25-1087 332 2 08/06/2025 3, 4 12-255-104 (5.6) A H-25-1024 59 3 08/06/2025 3, 4 12-255-104 (5.7) A H-25-1024 59 3 08/06/2025 3, 4 12-255-104 (5.8) N H-25-1024 59 3 08/06/2025 12-255-111.5 (6) N S-25-146 342 4 06/02/2025 3, 4 12-255-137 N H-25-1024 59 4 08/06/2025 4 12-270-104 IP(10) A H-25-1016 44 1 08/06/2025 4 12-270-104 (10)(d) N H-25-1016 44 1 08/06/2025 4 12-275-102.5 N S-25-275 377 59 08/06/2025 4 12-275-107 (1)(a) A S-25-275 377 60 08/06/2025 2, 3, 4 12-280-103 (46.7) N H-25-1222 259 6 08/06/2025 2, 3, 4 12-280-118 (3)(d) N H-25-1222 259 7 08/06/2025 12-280-124 (2) A S-25-129 96 2 04/24/2025 4 12-280-124 (4)(c)(II) A S-25-300 428 13 08/06/2025 4 12-280-135 (1)(e) A S-25-289 273 1 08/06/2025 4 12-280-135 (2)(a) A S-25-289 273 1 08/06/2025 4 12-280-135 IP(2)(b) A S-25-289 273 1 08/06/2025 4 12-280-135 (2)(b)(II) A S-25-289 273 1 08/06/2025 4 12-280-135 (2)(b)(III) A S-25-289 273 1 08/06/2025 4 12-280-135 (2)(b)(IV) N S-25-289 273 1 08/06/2025 4 12-280-135 IP(2)(c) A S-25-289 273 1 08/06/2025 4 12-280-135 (2)(c)(I) A S-25-289 273 1 08/06/2025 4 12-280-135 (2)(c)(III) A S-25-289 273 1 08/06/2025 4 12-280-135 (2)(c)(IV) R S-25-289 273 1 08/06/2025 4 12-280-135 (2)(c)(V) A S-25-289 273 1 08/06/2025 4 12-280-135 (2)(c)(VI) N S-25-289 273 1 08/06/2025 4 12-280-135 (2)(c)(VII) N S-25-289 273 1 08/06/2025 4 12-280-135 (2)(c)(VIII) N S-25-289 273 1 08/06/2025 4 12-280-135 (3) A S-25-289 273 1 08/06/2025 4 12-280-135 (4) A S-25-289 273 1 08/06/2025 4 12-280-135 (5) R S-25-289 273 1 08/06/2025 4 12-280-135 (6) A S-25-289 273 1 08/06/2025 4 12-280-135.5 N S-25-289 273 2 08/06/2025 4 12-280-402 (2) R H-25-1316 254 1 08/06/2025 4 12-280-402 (5) N H-25-1316 254 1 08/06/2025 12-280-403 (1.5) N H-25-1309 233 4 05/23/2025 12-280-404 (2)(c) A H-25-1309 233 5 05/23/2025 12-280-405 (4) A S-25-264 129 10 04/25/2025 4 12-305-102 IP(1) A H-25-1075 163 1 08/06/2025 4 12-305-102 (1)(c.5) N H-25-1075 163 1 08/06/2025 4 12-305-102 (2) A H-25-1075 163 1 08/06/2025 4 12-305-104 (1.3) N H-25-1075 163 2 08/06/2025 4 12-305-104 (1.4) N H-25-1075 163 2 08/06/2025 4 12-305-104 (1.5) N H-25-1075 163 2 08/06/2025 4 12-305-104 (2) A H-25-1075 163 2 08/06/2025 4 12-305-104 (2.5) N H-25-1075 163 2 08/06/2025 4 12-305-104 (3) A H-25-1075 163 2 08/06/2025 4 12-305-104 (4.5) N H-25-1075 163 2 08/06/2025 4 12-305-104 (6) N H-25-1075 163 2 08/06/2025 4 12-305-105 (1) A H-25-1075 163 3 08/06/2025 4 12-305-105 (3) N H-25-1075 163 3 08/06/2025 4 12-305-110 (1)(a) A H-25-1075 163 4 08/06/2025 4 12-305-110 (1)(c.3) N H-25-1075 163 4 08/06/2025 4 12-305-110 (1)(c.5) N H-25-1075 163 4 08/06/2025 4 12-305-110 (2)(a) A H-25-1075 163 4 08/06/2025 4 12-305-111 A H-25-1075 163 5 08/06/2025 4 12-305-111.5 N H-25-1075 163 6 08/06/2025 4 12-305-112 IP(2) A H-25-1075 163 7 08/06/2025 4 12-305-112 (2)(r) A H-25-1075 163 7 08/06/2025 4 12-305-112 (2)(s)(II) A H-25-1075 163 7 08/06/2025 4 12-305-112 (2)(t) N H-25-1075 163 7 08/06/2025 2, 8, 25 12-315-104 (21.5) A H-25-1285 305 2 01/01/2026 2, 8, 25 12-315-104 (21.7) A H-25-1285 305 2 01/01/2026 2, 8 12-315-104 (21.9) N H-25-1285 305 2 01/01/2026 2, 8, 25 12-315-105 (1)(u) A H-25-1285 305 3 01/01/2026 2, 8 12-315-105.5 (2) A H-25-1285 305 4 01/01/2026 2, 8 12-315-105.5 IP(3)(a) A H-25-1285 305 4 01/01/2026 2, 8 12-315-105.5 (3)(a)(I) A H-25-1285 305 4 01/01/2026 2, 8 12-315-105.5 (3.5) N H-25-1285 305 4 01/01/2026 2, 8 12-315-105.5 IP(5)(a) A H-25-1285 305 4 01/01/2026 2, 8 12-315-105.5 (5)(a)(I) A H-25-1285 305 4 01/01/2026 2, 8 12-315-105.5 (5)(a)(III) N H-25-1285 305 4 01/01/2026 2, 8 12-315-105.5 (5)(a)(IV) N H-25-1285 305 4 01/01/2026 2, 8 12-315-105.5 (8) N H-25-1285 305 4 01/01/2026 2, 8 12-315-105.5 (9) N H-25-1285 305 4 01/01/2026 2, 8, 25 12-315-106 (5)(j) A H-25-1285 305 5 01/01/2026 2, 8 12-315-106 (10) N H-25-1285 305 5 01/01/2026 2, 8 12-315-110 (3)(a)(II)(C) A H-25-1285 305 6 01/01/2026 2, 8 12-315-119 (1) A H-25-1285 305 7 01/01/2026 2, 8 12-315-121 (3) A H-25-1285 305 8 01/01/2026 2, 8 12-315-201 (1)(d) A H-25-1285 305 9 01/01/2026 2, 8, 25 12-315-201 (1)(e) A H-25-1285 305 9 01/01/2026 2, 8, 25 12-315-201 (1)(f) A H-25-1285 305 9 01/01/2026 2, 8 12-315-201 (1)(g) N H-25-1285 305 9 01/01/2026 2, 8 12-315-201 (1)(h) N H-25-1285 305 9 01/01/2026 2, 8 12-315-201 (1.5) A H-25-1285 305 9 01/01/2026 2, 8 12-315-201 (3) N H-25-1285 305 9 01/01/2026 2, 8 12-315-201 (4) N H-25-1285 305 9 01/01/2026 2, 8 12-315-202 A H-25-1285 305 10 01/01/2026 2, 8, 25 12-315-203.7 (2) A H-25-1285 305 11 01/01/2026 2, 8, 25 12-315-203.7 (3) A H-25-1285 305 11 01/01/2026 2, 8, 25 12-315-203.7 (4)(c) A H-25-1285 305 11 01/01/2026 2, 8 12-315-203.7 (4)(c.5) N H-25-1285 305 11 01/01/2026 2, 8 12-315-203.7 (6) N H-25-1285 305 11 01/01/2026 2, 8, 25 12-315-208 IP(1)(a)(I) A H-25-1285 305 12 01/01/2026 2, 8, 25 12-315-208 (1)(a)(I)(B) A H-25-1285 305 12 01/01/2026 2, 8, 25 12-315-209.7 (1) A H-25-1285 305 13 01/01/2026 2, 8, 25 12-315-209.7 (2) A H-25-1285 305 13 01/01/2026 2, 8, 25 12-315-209.7 IP(3) A H-25-1285 305 13 01/01/2026 2, 8, 25 12-315-209.7 IP(4) A H-25-1285 305 13 01/01/2026 2, 8 12-315-209.7 (5) N H-25-1285 305 13 01/01/2026 TITLE 13 Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date 4 13-1-119.5 IP(1) A S-25-239 142 1 08/06/2025 4 13-1-119.5 (1)(c) A S-25-239 142 1 08/06/2025 4 13-1-119.5 (1)(d) A S-25-239 142 1 08/06/2025 4 13-1-119.5 (1)(e) A S-25-239 142 1 08/06/2025 4 13-1-119.5 (1.5) N S-25-239 142 1 08/06/2025 13-1-140.1 N S-25-129 96 3 04/24/2025 2 13-1-402 (6) N S-25-276 240 22 05/23/2025 2 13-1-403 (1) A S-25-276 240 23 05/23/2025 4 13-3-101 (13.5) N H-25-1081 33 1 08/06/2025 2, 4 13-3-113 (3)(a) A S-25-197 256 8 08/06/2025 13-5-105 (2)(i) N S-25-024 23 1 03/24/2025 13-5-105 (2)(j) N S-25-024 23 1 03/24/2025 13-5-108 (2)(c) A S-25-024 23 2 03/24/2025 13-5-108 (2)(d) N S-25-024 23 2 03/24/2025 13-5-114 (2)(c) N S-25-024 23 3 03/24/2025 13-5-118 (2)(h) N S-25-024 23 4 03/24/2025 13-5-118 (2)(i) N S-25-024 23 4 03/24/2025 13-5-119 (2)(d)(VIII) N S-25-024 23 5 03/24/2025 13-5-119 (2)(d)(IX) N S-25-024 23 5 03/24/2025 13-5-119 (2)(e) A S-25-024 23 5 03/24/2025 13-5-120 (2)(i) N S-25-024 23 6 03/24/2025 13-5-123.1 (3) N S-25-024 23 7 03/24/2025 13-5.5-104 IP(3)(a) A H-25-1298 354 1 06/02/2025 13-5.5-104 (3)(b) R H-25-1298 354 1 06/02/2025 13-5.5-104 (3)(c) R H-25-1298 354 1 06/02/2025 13-5.5-104 IP(4)(a) A H-25-1298 354 1 06/02/2025 13-5.5-104 (4)(b) R H-25-1298 354 1 06/02/2025 13-5.5-104 (4)(c) R H-25-1298 354 1 06/02/2025 13-5.5-104 (4.5) N H-25-1298 354 1 06/02/2025 13-6-202 RE S-25-024 23 8 03/24/2025 23 13-10-103 A S-25-062 82 1 04/17/2025 13-10-127 N S-25-062 82 2 04/17/2025 4 13-16-126 N H-25-1329 407 1 08/06/2025 4, 50 13-17-101.5 N S-25-275 377 61 08/06/2025 4, 173 13-17-102 (9) R S-25-275 377 336 08/06/2025 13-20-403 (2) A H-25-1070 47 1 03/31/2025 13-20-403 (3) A H-25-1070 47 1 03/31/2025 1, 2, 3, 4 13-20-802.5 (4.5) N H-25-1272 183 2 08/06/2025 1, 2, 3, 4, 213 13-20-802.5 (5.5) N H-25-1272 183 2 08/06/2025 1, 2, 3, 4, 213 13-20-802.5 (6) N H-25-1272 183 2 08/06/2025 1, 2, 3, 4 13-20-803.3 N H-25-1272 183 3 08/06/2025 1, 2, 3, 4 13-20-803.5 (1) A H-25-1272 183 4 08/06/2025 1, 2, 3, 4 13-20-803.5 (3) A H-25-1272 183 4 08/06/2025 1, 2, 3, 4 13-20-803.5 (3.5) N H-25-1272 183 4 08/06/2025 1, 2, 3, 4 13-20-803.5 (3.7) N H-25-1272 183 4 08/06/2025 1, 2, 3, 4 13-20-803.5 (7) A H-25-1272 183 4 08/06/2025 1, 2, 3, 4 13-20-803.5 (12) A H-25-1272 183 4 08/06/2025 1, 2, 3, 4 13-20-803.5 (13) N H-25-1272 183 4 08/06/2025 1, 2, 3, 4 13-20-805 A H-25-1272 183 5 08/06/2025 13-21-108.1 (2) A S-25-191 164 1 05/05/2025 13-21-108.1 (3)(a)(IV) A S-25-191 164 1 05/05/2025 13-21-108.1 IP(4)(b) A S-25-191 164 1 05/05/2025 13-21-108.1 (4)(b)(I) R S-25-191 164 1 05/05/2025 4 13-21-108.7 (3)(b)(I) A S-25-164 168 7 08/06/2025 3, 4 13-21-108.9 N H-25-1053 17 1 08/06/2025 4 13-21-113 (1)(a) A H-25-1166 90 4 08/06/2025 4 13-21-113 (1)(b)(II.5) N H-25-1059 77 3 08/06/2025 4 13-21-113 (1)(b)(VI) N H-25-1059 77 3 08/06/2025 4 13-21-113 (2) A H-25-1166 90 4 08/06/2025 4 13-21-113 (3.5) A H-25-1166 90 4 08/06/2025 4 13-21-113 (5) N H-25-1059 77 3 08/06/2025 13-21-133 (1) A S-25-129 96 4 04/24/2025 4 13-21-15 (entire part 15) N S-25-288 339 1 08/06/2025 2 13-22-310 (3) N H-25-1215 312 3 05/30/2025 3 13-25-138 (1) A H-25-1138 9 1 07/01/2025 3 13-25-138 (1.5) N H-25-1138 9 1 07/01/2025 3 13-25-138 IP(2) A H-25-1138 9 1 07/01/2025 3 13-25-138 (3)(a) A H-25-1138 9 1 07/01/2025 3 13-25-138 (3)(a.5) N H-25-1138 9 1 07/01/2025 3 13-25-138 (3)(b) A H-25-1138 9 1 07/01/2025 2 13-40-104 (1)(j)(III) R H-25-1168 229 2 05/22/2025 2 13-40-104 (4) A H-25-1168 229 2 05/22/2025 2 13-40-104 (5) A H-25-1168 229 2 05/22/2025 2 13-40-104 (6) N H-25-1168 229 2 05/22/2025 2 13-40-106 (4) N H-25-1168 229 3 08/06/2025 2 13-40-107.5 (1)(e) N H-25-1168 229 4 05/22/2025 2 13-40-107.5 (5)(c) A H-25-1168 229 4 05/22/2025 2 13-40-108 A H-25-1168 229 5 08/06/2025 2 13-40-110 (3.5) N H-25-1168 229 6 08/06/2025 2 13-40-110.5 (3) A H-25-1168 229 7 08/06/2025 4 13-40-110.5 (6) N S-25-020 264 1 08/06/2025 2 13-40-111 (6)(b) A H-25-1168 229 8 08/06/2025 2 13-40-111 (6)(d) N H-25-1168 229 8 08/06/2025 2 13-40-111 (6)(e) N H-25-1168 229 8 08/06/2025 2 13-40-112 (1) A H-25-1168 229 9 05/22/2025 2 13-40-112 (2) A H-25-1168 229 9 05/22/2025 2 13-40-113 (1) A H-25-1168 229 10 05/22/2025 2 13-40-113 (2) A H-25-1168 229 10 05/22/2025 2 13-40-113 (4)(a) A H-25-1168 229 10 05/22/2025 2 13-40-113 (4)(a.5) N H-25-1168 229 10 05/22/2025 2 13-40-115 IP(4) A H-25-1168 229 11 08/06/2025 2 13-40-122 IP(1)(a) A H-25-1168 229 12 05/22/2025 2 13-40-122 (1)(a.5) N H-25-1168 229 12 05/22/2025 13-71-137 A H-25-1154 230 18 05/22/2025 4 13-73-100.3 N S-25-275 377 62 08/06/2025 4 13-73-101 (2) A S-25-275 377 63 08/06/2025 4 13-80-105.5 N S-25-035 319 1 08/06/2025 13-90-202 (4) R H-25-1154 230 19 05/22/2025 13-90-202 (6.3) N H-25-1154 230 19 05/22/2025 13-90-202 (7.3) N H-25-1154 230 19 05/22/2025 13-90-202 (8) A H-25-1154 230 19 05/22/2025 13-90-203 A H-25-1154 230 20 05/22/2025 13-90-205 A H-25-1154 230 21 05/22/2025 13-90-210 A H-25-1154 230 22 05/22/2025 4 13-91-103 (1) A S-25-275 377 64 08/06/2025 4 13-91-103 (1.5) N S-25-275 377 64 08/06/2025 4 13-91-104 (2)(a) A S-25-275 377 65 08/06/2025 4 13-95-105 (4) N S-25-041 357 2 08/06/2025 TITLE 14 Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date 14-2-104 A S-25-014 51 1 04/07/2025 1 14-2-106 (3) N H-25-1312 205 2 05/16/2025 1 14-2-107 A H-25-1312 205 3 05/16/2025 2, 4 14-10-103 (1.5) N S-25-116 212 2 08/06/2025 2, 4 14-10-107.8 (1) A S-25-116 212 3 08/06/2025 2, 4 14-10-114 (3)(c)(XII) A S-25-116 212 4 08/06/2025 2, 4 14-10-114 (3)(c)(XII.5) N S-25-116 212 4 08/06/2025 14-10-114 (8)(c)(IV) A H-25-1159 334 1 05/31/2025 14-10-115 (2)(a) A H-25-1159 334 2 05/31/2025 14-10-115 (3)(g.5) N H-25-1159 334 2 03/01/2026 14-10-115 (3)(h) A H-25-1159 334 2 03/01/2026 14-10-115 (3)(i) A H-25-1159 334 2 03/01/2026 14-10-115 IP(5)(a) A H-25-1159 334 2 05/31/2025 14-10-115 (5)(a)(III)(B) A H-25-1159 334 2 05/31/2025 14-10-115 (5)(a)(IV) A H-25-1159 334 2 05/31/2025 14-10-115 (7)(a) A H-25-1159 334 2 03/01/2026 14-10-115 (7)(b) RE H-25-1159 334 2 03/01/2026 14-10-115 (8)(a) A H-25-1159 334 2 03/01/2026 14-10-115 (8)(b) A H-25-1159 334 2 03/01/2026 14-10-115 (8)(c) A H-25-1159 334 2 03/01/2026 14-10-115 (8)(g) R H-25-1159 334 2 03/01/2026 14-10-115 (8)(h) N H-25-1159 334 2 03/01/2026 14-10-115 (10)(h) A H-25-1159 334 2 05/31/2025 14-10-115 (11)(c)(II) A H-25-1159 334 2 05/31/2025 14-10-115 (12) A H-25-1159 334 2 05/31/2025 14-10-115 (13)(a)(III) A H-25-1159 334 2 05/31/2025 4 14-10-116.5 (2)(f)(I)(B) A S-25-300 428 14 08/06/2025 14-10-122 IP(6)(d) A H-25-1159 334 3 05/31/2025 14-10-122 (6)(d)(I) A H-25-1159 334 3 05/31/2025 4 14-10-127 (4)(a.5)(I)(B) A S-25-300 428 15 08/06/2025 14-14-111.5 (4)(c)(II) A H-25-1159 334 4 05/31/2025 14-14-111.5 (4)(c)(III)(B) A H-25-1159 334 4 05/31/2025 14-14-111.5 (4)(c)(IV)(C) A H-25-1159 334 4 05/31/2025 14-14-111.5 (16.7) A H-25-1159 334 4 05/31/2025 14-14-113 (1)(b) A H-25-1159 334 5 05/31/2025 14-15-102 A S-25-014 51 2 04/07/2025 14-15-103 IP A S-25-014 51 3 04/07/2025 14-15-103 (4) A S-25-014 51 3 04/07/2025 1 14-15-110 (3) N H-25-1312 205 4 05/16/2025 1 14-15-111 A H-25-1312 205 5 05/16/2025 14-15-118 A S-25-014 51 4 04/07/2025 TITLE 15 Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date 4 15-14-310 IP(5)(a) A H-25-1325 255 4 08/06/2025 3, 4 15-14-703 (2) N H-25-1076 16 5 08/06/2025 TITLE 16 Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date 4 16-2.5-100.3 N S-25-275 377 66 08/06/2025 29 16-2.5-102 A H-25-1181 36 1 03/26/2025 29 16-2.5-102 A H-25-1136 333 7 05/31/2025 4, 29 16-2.5-102 A S-25-275 377 67 08/06/2025 29 16-2.5-102 A H-25-1314 241 1 05/23/2025 16-2.5-121.5 N H-25-1314 241 2 05/23/2025 16-2.5-122 A H-25-1314 241 3 05/23/2025 16-2.5-130 A H-25-1136 333 8 05/31/2025 16-2.5-152 A H-25-1136 333 6 05/31/2025 16-2.5-153 N H-25-1181 36 2 03/26/2025 16-2.5-502 (3)(e) R H-25-1136 333 9 05/31/2025 4 16-3-400.3 N H-25-1049 331 1 08/06/2025 4 16-3-402 (1) A H-25-1049 331 2 08/06/2025 4 16-3-402 (2) A H-25-1049 331 2 08/06/2025 4 16-3-402 (3) A H-25-1049 331 2 08/06/2025 4 16-3-403 A H-25-1049 331 3 08/06/2025 4 16-3-404 (1) A H-25-1049 331 4 08/06/2025 4 16-3-404 (1.5) N H-25-1049 331 4 08/06/2025 16-3-7 (entire part 7) N S-25-009 165 1 05/05/2025 4, 99 16-4-102 (2)(b) A H-25-1015 43 1 08/06/2025 4, 99 16-4-102 (2)(b)(I) A S-25-190 286 1 08/06/2025 4 16-4-102 (2)(c) A H-25-1015 43 1 08/06/2025 4 16-4-102 (2)(d) A H-25-1015 43 1 08/06/2025 4 16-4-102 (2)(e) A H-25-1015 43 1 08/06/2025 2 16-4-102 (2)(e.5) N S-25-276 240 4 05/23/2025 4 16-4-102 (2)(f) A H-25-1015 43 1 08/06/2025 4 16-4-102 (2)(h)(I)(A) A H-25-1015 43 1 08/06/2025 4 16-4-102 (2)(i)(I) A H-25-1015 43 1 08/06/2025 4 16-4-102 (2)(i)(II) A H-25-1015 43 1 08/06/2025 4 16-4-102 (2)(j)(I) A H-25-1015 43 1 08/06/2025 4 16-4-102 (2)(j)(II) A H-25-1015 43 1 08/06/2025 4 16-4-111 (1) A H-25-1015 43 2 08/06/2025 16-4-111 (8) N S-25-241 144 1 04/28/2025 16-4-114 (7) N S-25-241 144 2 04/28/2025 4 16-5-401 (2.5) N S-25-041 357 11 08/06/2025 4 16-8-101 (2) R H-25-1058 15 1 08/06/2025 4 16-8-101 (3) A H-25-1058 15 1 08/06/2025 4 16-8-101.5 (2) R H-25-1058 15 2 08/06/2025 4 16-8-101.5 (3) A H-25-1058 15 2 08/06/2025 4 16-8-102 A H-25-1058 15 3 08/06/2025 4 16-8-103 A H-25-1058 15 4 08/06/2025 4 16-8-103.5 A H-25-1058 15 5 08/06/2025 4 16-8-103.6 A H-25-1058 15 6 08/06/2025 4 16-8-103.7 A H-25-1058 15 7 08/06/2025 4 16-8-104 A H-25-1058 15 8 08/06/2025 4 16-8-104.5 A H-25-1058 15 9 08/06/2025 4 16-8-105 (1) A H-25-1058 15 10 08/06/2025 4 16-8-105 (4) A H-25-1058 15 10 08/06/2025 4 16-8-105 (5) A H-25-1058 15 10 08/06/2025 4 16-8-105.5 (1) A H-25-1058 15 11 08/06/2025 4 16-8-105.5 (2) A H-25-1058 15 11 08/06/2025 4 16-8-105.5 (3) A H-25-1058 15 11 08/06/2025 4 16-8-106 (1)(a) A H-25-1058 15 12 08/06/2025 4 16-8-106 (1)(b) A H-25-1058 15 12 08/06/2025 4 16-8-106 (2)(a) A H-25-1058 15 12 08/06/2025 4 16-8-106 (2)(b) A H-25-1058 15 12 08/06/2025 4 16-8-106 (3) A H-25-1058 15 12 08/06/2025 4 16-8-106 IP(7) A H-25-1058 15 12 08/06/2025 4 16-8-107 (1)(a) A H-25-1058 15 13 08/06/2025 4 16-8-107 (1)(c) A H-25-1058 15 13 08/06/2025 4 16-8-107 (1.5)(a) A H-25-1058 15 13 08/06/2025 4 16-8-107 (1.5)(c) A H-25-1058 15 13 08/06/2025 4 16-8-107 (3)(b) A H-25-1058 15 13 08/06/2025 4 16-8-107 (3)(c) A H-25-1058 15 13 08/06/2025 4 16-8-108 (1)(a) A H-25-1058 15 14 08/06/2025 4 16-8-109 A H-25-1058 15 15 08/06/2025 4 16-8-114 (3) A H-25-1058 15 16 08/06/2025 4 16-8-115 (1)(b) A H-25-1058 15 17 08/06/2025 4 16-8-115 (1)(c) A H-25-1058 15 17 08/06/2025 4 16-8-115 (1.5) A H-25-1058 15 17 08/06/2025 4 16-8-115 (2) A H-25-1058 15 17 08/06/2025 4 16-8-115 (3)(b) A H-25-1058 15 17 08/06/2025 4 16-8-115 (3)(c) A H-25-1058 15 17 08/06/2025 4 16-8-115 (4)(a.5) A H-25-1058 15 17 08/06/2025 4 16-8-115 (4)(f) A H-25-1058 15 17 08/06/2025 4 16-8-115 (4)(g)(XXI) A H-25-1058 15 17 08/06/2025 4 16-8-115 (4)(i)(I) A H-25-1058 15 17 08/06/2025 4 16-8-115.5 (3) A H-25-1058 15 18 08/06/2025 4 16-8-115.5 (4) A H-25-1058 15 18 08/06/2025 4 16-8-115.5 (5) A H-25-1058 15 18 08/06/2025 4 16-8-115.5 (6)(a) A H-25-1058 15 18 08/06/2025 4 16-8-115.5 (6)(b) A H-25-1058 15 18 08/06/2025 4 16-8-115.5 (8) A H-25-1058 15 18 08/06/2025 4 16-8-116 A H-25-1058 15 19 08/06/2025 4 16-8-117 A H-25-1058 15 20 08/06/2025 4 16-8-118 (1) A H-25-1058 15 21 08/06/2025 4 16-8-118 (1.5) A H-25-1058 15 21 08/06/2025 4 16-8-118 (2)(a.5) A H-25-1058 15 21 08/06/2025 4 16-8-118 (2)(b) A H-25-1058 15 21 08/06/2025 4 16-8-119 A H-25-1058 15 22 08/06/2025 4 16-8-120 A H-25-1058 15 23 08/06/2025 4 16-8-121 A H-25-1058 15 24 08/06/2025 4 16-8.5-103 (3) A S-25-041 357 3 08/06/2025 4 16-8.5-103 (4) A S-25-041 357 3 08/06/2025 4 16-8.5-105 (5)(f) A S-25-041 357 4 08/06/2025 4 16-8.5-106 (2) A S-25-041 357 5 08/06/2025 4 16-8.5-111 (2)(b) A S-25-041 357 6 08/06/2025 4 16-8.5-111 (3)(a)(III) A S-25-041 357 6 08/06/2025 4 16-8.5-111 (3)(b)(IV) A S-25-041 357 6 08/06/2025 4 16-8.5-111 IP(3)(b)(V) A S-25-041 357 6 08/06/2025 4 16-8.5-111 (4)(a) A S-25-041 357 6 08/06/2025 4 16-8.5-111 (4)(b) A S-25-041 357 6 08/06/2025 4 16-8.5-111 (7) A S-25-041 357 6 08/06/2025 4 16-8.5-113 (2) A S-25-041 357 7 08/06/2025 4 16-8.5-113 (3) A S-25-041 357 7 08/06/2025 4 16-8.5-116 (2)(c)(V) A S-25-041 357 8 08/06/2025 4 16-8.5-116 (2)(c)(VI) A S-25-041 357 8 08/06/2025 4 16-8.5-116 (2)(c)(VII) R S-25-041 357 8 08/06/2025 4 16-8.5-116.5 (1)(b) A S-25-041 357 9 08/06/2025 4 16-8.5-116.5 (7) A S-25-041 357 9 08/06/2025 4 16-8.6-108 (3) A S-25-300 428 16 08/06/2025 4 16-8.6-113 N S-25-041 357 10 08/06/2025 16-9-8 (entire part 8) N H-25-1114 34 1 07/01/2025 16-11-101.6 (2) A S-25-241 144 3 04/28/2025 3 16-12-3 (entire part 3) N H-25-1275 352 1 06/02/2025 16-17-102 (2) A S-25-297 381 7 06/03/2025 16-18-106 N S-25-240 143 1 04/28/2025 16-19-115 A S-25-129 96 5 04/24/2025 4 16-20.5-102 (7.3) N S-25-275 377 68 08/06/2025 4 16-20.5-102 (9.6) N S-25-275 377 68 08/06/2025 4 16-20.5-103 (1) A S-25-275 377 69 08/06/2025 TITLE 17 Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date 4 17-1-102 (1.1) N S-25-190 286 2 08/06/2025 4 17-1-102 (6.7) A S-25-190 286 2 08/06/2025 4 17-1-102 (6.8) N S-25-190 286 2 08/06/2025 4 17-1-102 (7.4) A S-25-190 286 2 08/06/2025 4 17-1-102 (7.5) A S-25-190 286 2 08/06/2025 4 17-1-102 (7.6) N S-25-190 286 2 08/06/2025 17-1-103.3 N S-25-211 113 1 04/25/2025 2 17-1-104.3 (1)(b.6) N S-25-212 327 2 05/31/2025 17-1-168 (1)(c) N S-25-213 114 1 04/25/2025 17-1-168 (3)(d) A S-25-213 114 1 04/25/2025 17-1-168 (3)(e) A S-25-213 114 1 04/25/2025 17-1-168 (3)(f) N S-25-213 114 1 04/25/2025 4 17-2-100.3 N S-25-275 377 70 08/06/2025 4 17-2-102 (1) A S-25-275 377 71 08/06/2025 4 17-2-200.3 N S-25-275 377 72 08/06/2025 4 17-2-201 (1)(a) A S-25-275 377 73 08/06/2025 17-20-130 N H-25-1013 448 1 06/04/2025 4 17-22.5-403.5 IP(1) A S-25-190 286 3 08/06/2025 4 17-22.5-403.5 (2) R S-25-190 286 3 08/06/2025 4 17-22.5-403.5 IP(3)(a) A S-25-190 286 3 08/06/2025 4 17-22.5-403.5 (3)(a)(III.5) N S-25-190 286 3 08/06/2025 4 17-22.5-403.5 IP(3)(b) A S-25-190 286 3 08/06/2025 4 17-22.5-403.5 (3)(b)(V) N S-25-190 286 3 08/06/2025 4 17-22.5-403.5 (3)(b.5) A S-25-190 286 3 08/06/2025 4 17-22.5-403.5 (4)(a) A S-25-190 286 3 08/06/2025 4 17-22.5-403.5 (4)(b) A S-25-190 286 3 08/06/2025 4 17-22.5-403.5 (4)(f) A S-25-190 286 3 08/06/2025 4 17-22.5-403.5 (9) N S-25-190 286 3 08/06/2025 4 17-22.5-403.5 (10) N S-25-190 286 3 08/06/2025 2 17-26-101 A H-25-1050 14 2 03/14/2025 17-27-108 (5) R S-25-291 379 1 07/01/2025 4 17-33-101 IP(5) A H-25-1129 22 1 08/06/2025 4 17-33-101 (5)(e) A H-25-1129 22 1 08/06/2025 4 17-33-101 (5)(f) A H-25-1129 22 1 08/06/2025 4 17-33-101 (5)(g) N H-25-1129 22 1 08/06/2025 4 17-33-101 (9) A H-25-1129 22 1 08/06/2025 4 17-33-104 N H-25-1116 153 1 08/06/2025 4 17-40-101 (3.5) N S-25-275 377 74 08/06/2025 4 17-40-102 (1) A S-25-275 377 75 08/06/2025 94 17-42-103 IP(1.5) A S-25-208 110 1 04/25/2025 94 17-42-103 IP(1.5) A H-25-1013 448 2 06/04/2025 17-42-103 (1.5)(b) A S-25-208 110 1 04/25/2025 17-42-103 (1.5)(c) A S-25-208 110 1 04/25/2025 17-42-103 (1.5)(d) N S-25-208 110 1 04/25/2025 TITLE 18 Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date 2 18-1-410.6 (2) A S-25-276 240 5 05/23/2025 2 18-1-410.6 (3)(a) A S-25-276 240 5 05/23/2025 2 18-1-410.6 IP(4) A S-25-276 240 5 05/23/2025 4 18-1-712 (2)(b)(I) A S-25-164 168 8 08/06/2025 4 18-1-803 (1) A H-25-1058 15 25 08/06/2025 3, 30 18-1-1001 (1) A H-25-1148 154 1 07/01/2025 3 18-1-1001 (2) A H-25-1148 154 1 07/01/2025 3 18-1-1001 (3) A H-25-1148 154 1 07/01/2025 3 18-1-1001 (4) R H-25-1148 154 1 07/01/2025 3 18-1-1001 (6.5) N H-25-1148 154 1 07/01/2025 4 18-1.3-301 IP(2)(b) A S-25-209 111 1 08/06/2025 4 18-1.3-301 (2)(c) A S-25-209 111 1 08/06/2025 3 18-1.3-603 IP(1) A H-25-1304 307 1 05/30/2025 3 18-1.3-603 (1)(b) A H-25-1304 307 1 05/30/2025 3 18-1.3-603 (2)(a) A H-25-1304 307 1 05/30/2025 18-1.3-701 (1)(c) A H-25-1154 230 23 05/22/2025 18-1.3-704 (3) R H-25-1294 292 1 05/29/2025 3 18-1.3-803 (1) A S-25-189 344 1 06/02/2025 3 18-1.3-803 IP(4) A S-25-189 344 1 06/02/2025 3 18-1.3-803 (4)(b) A S-25-189 344 1 06/02/2025 3 18-1.3-803 (5)(b) A S-25-189 344 1 06/02/2025 3 18-1.3-803 (6) R S-25-189 344 1 06/02/2025 18-4-401 IP(2) A H-25-1062 360 1 06/02/2025 18-4-401 (2.3) N H-25-1062 360 1 06/02/2025 3, 4 18-5-121 N H-25-1076 16 1 08/06/2025 3, 4 18-6-403 (1) A S-25-288 339 2 08/06/2025 3, 4 18-6-403 (1.5) A S-25-288 339 2 08/06/2025 3, 4 18-6-403 (2)(b.7) N S-25-288 339 2 08/06/2025 3, 4 18-6-403 (2)(e.3) N S-25-288 339 2 08/06/2025 3, 4 18-6-403 (2)(j) A S-25-288 339 2 08/06/2025 3, 4 18-6-403 (3.5) A S-25-288 339 2 08/06/2025 3, 4 18-6-403 (9) N S-25-288 339 2 08/06/2025 3, 4 18-6-403 (10) N S-25-288 339 2 08/06/2025 3 18-6-803.5 (1)(a) A H-25-1148 154 2 07/01/2025 3 18-6-803.5 (1)(c) A H-25-1148 154 2 07/01/2025 3 18-6-803.5 (2)(c) A H-25-1148 154 2 07/01/2025 3 18-6-803.5 (3)(b.5) N H-25-1148 154 2 07/01/2025 3 18-6-803.5 (7) A H-25-1148 154 2 07/01/2025 3, 4 18-7-107 (1) A S-25-288 339 3 08/06/2025 3, 4 18-7-107 (2.5) A S-25-288 339 3 08/06/2025 3, 4 18-7-107 (4)(b) A S-25-288 339 3 08/06/2025 3, 4 18-7-107 (5) A S-25-288 339 3 08/06/2025 3, 4 18-7-107 (5.5) N S-25-288 339 3 08/06/2025 3, 4 18-7-107 (6) A S-25-288 339 3 08/06/2025 3, 4 18-7-108 (1) A S-25-288 339 4 08/06/2025 3, 4 18-7-108 (2.5) A S-25-288 339 4 08/06/2025 3, 4 18-7-108 (4)(b) A S-25-288 339 4 08/06/2025 3, 4 18-7-108 (5) A S-25-288 339 4 08/06/2025 3, 4 18-7-108 (5.5) N S-25-288 339 4 08/06/2025 3, 4 18-7-108 (6) A S-25-288 339 4 08/06/2025 3, 4 18-7-109 (1) A S-25-288 339 6 08/06/2025 3, 4 18-7-109 (2) A S-25-288 339 6 08/06/2025 3, 4 18-7-109 (3) A S-25-288 339 6 08/06/2025 3, 4 18-7-109 (4) A S-25-288 339 6 08/06/2025 3, 4 18-7-109 (5)(a) A S-25-288 339 6 08/06/2025 3, 4 18-7-109 (5)(b) A S-25-288 339 6 08/06/2025 3, 4 18-7-109 (5)(c) A S-25-288 339 6 08/06/2025 3, 4 18-7-109 (8) A S-25-288 339 6 08/06/2025 18-7-501 (5) A S-25-298 298 1 05/30/2025 11 18-8-101 (2.7) N S-25-060 74 1 10/01/2025 11 18-8-101 (2.8) N S-25-060 74 1 10/01/2025 11 18-8-102 (1) A S-25-060 74 2 10/01/2025 4 18-9-101 (3) N H-25-1290 353 1 08/06/2025 4 18-9-111 IP(1) A H-25-1290 353 2 08/06/2025 4 18-9-111 (1)(h) A H-25-1290 353 2 08/06/2025 4 18-9-111 (1)(i) N H-25-1290 353 2 08/06/2025 4 18-9-111 (2)(a) A H-25-1290 353 2 08/06/2025 4 18-9-204.5 IP(6) A H-25-1034 13 1 08/06/2025 4 18-9-204.5 (6)(b) A H-25-1034 13 1 08/06/2025 4, 133 18-12-101 (1) A S-25-300 428 17 08/06/2025 16, 133 18-12-101 (1)(a.2) N H-25-1133 89 1 07/01/2026 134 18-12-101 (1)(g.2) R S-25-003 68 1 04/10/2025 134 18-12-101 (1)(g.7) N S-25-003 68 1 04/10/2025 134 18-12-101 (1)(g.8) N S-25-003 68 1 04/10/2025 18-12-102 (1) A S-25-003 68 9 04/10/2025 3 18-12-108 (3.5) N H-25-1171 208 1 05/19/2025 3 18-12-108 (7)(n.5) N H-25-1171 208 1 05/19/2025 18-12-108 (7)(hhh) A S-25-003 68 4 04/10/2025 18-12-108 (7)(iii) A S-25-003 68 4 04/10/2025 18-12-108 (7)(jjj) N S-25-003 68 4 04/10/2025 1, 2, 4, 9, 142 18-12-111 (3)(a) A S-25-034 340 4 08/06/2025 1, 2, 4, 142 18-12-111 (4) N S-25-034 340 4 18-12-116 N S-25-003 68 2 04/10/2025 16 18-12-117 N H-25-1133 89 2 07/01/2026 4 18-12-202 (4) A S-25-300 428 18 08/06/2025 18-12-302 (1)(a) A S-25-003 68 8 04/10/2025 4 18-12-401.5 IP(7)(a) A S-25-205 356 2 08/06/2025 18-12-401.5 (8)(a)(IV)(D) A S-25-003 68 6 04/10/2025 18-12-401.5 (8)(a)(IV)(E) A S-25-003 68 6 04/10/2025 18-12-401.5 (8)(a)(IV)(F) N S-25-003 68 6 04/10/2025 2, 3, 13, 17 18-12-406 (3)(a) A H-25-1238 93 3 01/01/2026 2, 3, 17 18-12-5 (entire part 5) RE H-25-1238 93 2 01/01/2026 4 18-13-111 (9) R S-25-171 75 2 08/06/2025 4 18-13-111 (12)(d) R S-25-171 75 2 08/06/2025 4 18-13-111 (13)(d) R S-25-171 75 2 08/06/2025 1, 3 18-13-132 (3) A S-25-072 283 3 05/29/2025 2, 4 18-18-203 (2)(c)(XXI) A H-25-1063 46 2 08/06/2025 4 18-18-403.5 (6) A S-25-164 168 9 08/06/2025 3 18-19-102 IP A H-25-1148 154 3 07/01/2025 3 18-19-102 (1)(a) A H-25-1148 154 3 07/01/2025 2 18-19-103 (4)(a) A S-25-317 385 8 06/03/2025 2 18-19-103 (4)(d) N S-25-317 385 8 06/03/2025 4 18-19-103.5 (4) A S-25-195 243 3 08/06/2025 2 18-22-103 (5) N H-25-1215 312 4 05/30/2025 TITLE 19 Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date 4 19-1-103 (55) A H-25-1172 155 1 08/06/2025 4 19-1-103 (83) A H-25-1204 338 4 08/06/2025 4 19-1-103 (84) A H-25-1204 338 4 08/06/2025 4 19-1-103 (85) A H-25-1204 338 4 08/06/2025 4 19-1-126 R H-25-1204 338 1 08/06/2025 4 19-1-303 (1)(a) A S-25-239 142 2 08/06/2025 4 19-1-303 (1)(b) A S-25-239 142 2 08/06/2025 4 19-1-304 (7)(c) A S-25-239 142 3 08/06/2025 4 19-1-304 (7)(d) A S-25-239 142 3 08/06/2025 4 19-1-304 (7)(e) A S-25-239 142 3 08/06/2025 4 19-1-307 IP(2.3) A S-25-239 142 4 08/06/2025 4 19-1-307 (2.3)(c) A S-25-239 142 4 08/06/2025 4 19-1-307 (2.3)(d) A S-25-239 142 4 08/06/2025 4 19-1.2- (entire article 1.2) N H-25-1204 338 2 08/06/2025 3, 4 19-2.5-103 (1)(a)(I) A S-25-288 339 5 08/06/2025 4 19-2.5-304 (4) N H-25-1172 155 2 08/06/2025 4 19-2.5-502 IP(5)(a) A H-25-1204 338 5 08/06/2025 4 19-2.5-502 (5)(b) A H-25-1204 338 5 08/06/2025 4 19-2.5-701.5 (1) A S-25-041 357 13 08/06/2025 4 19-2.5-701.5 (6) A S-25-041 357 13 08/06/2025 19-2.5-703.5 IP(1) A H-25-1146 358 6 07/01/2025 4 19-2.5-704 (2)(b) A S-25-041 357 14 08/06/2025 4 19-2.5-704 (2)(c) A S-25-041 357 14 08/06/2025 19-2.5-704 (2.3) N H-25-1146 358 7 07/01/2025 19-2.5-704 IP(2.5)(a) A H-25-1146 358 7 07/01/2025 19-2.5-704 (2.5)(a)(I) A H-25-1146 358 7 07/01/2025 19-2.5-704 (2.5)(a)(II) A H-25-1146 358 7 07/01/2025 19-2.5-704 (3)(a) A H-25-1146 358 7 07/01/2025 19-2.5-704 (3)(b) A H-25-1146 358 7 07/01/2025 19-2.5-704 (3)(b.5) N H-25-1146 358 7 07/01/2025 19-2.5-704 (3)(d) N H-25-1146 358 7 07/01/2025 4 19-2.5-1200.3 N S-25-275 377 76 08/06/2025 4 19-2.5-1201 (1) A S-25-275 377 77 08/06/2025 19-2.5-1404 (1)(b)(X) R S-25-235 139 2 04/28/2025 19-2.5-1405 A H-25-1146 358 1 07/01/2025 19-2.5-1407 (3)(f) A S-25-235 139 1 04/28/2025 19-2.5-1407.3 (4)(b) A H-25-1146 358 3 07/01/2025 19-2.5-1407.3 (4)(c) A H-25-1146 358 3 07/01/2025 19-2.5-1407.5 N H-25-1146 358 4 07/01/2025 19-2.5-1408.5 N H-25-1146 358 5 07/01/2025 19-2.5-1515 A H-25-1146 358 2 07/01/2025 4 19-3-208 (2)(h) A S-25-300 428 19 08/06/2025 19-3-213 IP(1) A H-25-1097 261 2 05/28/2025 19-3-213 (1)(a) A H-25-1097 261 2 05/28/2025 19-3-213.5 N H-25-1097 261 1 05/28/2025 2 19-3-304 (1)(a) A H-25-1188 337 2 09/01/2025 2 19-3-304 (1)(c) N H-25-1188 337 2 09/01/2025 2 19-3-304 IP(2) A H-25-1188 337 2 09/01/2025 2 19-3-304 (2)(w) R H-25-1188 337 2 05/31/2025 2 19-3-304 (3.2) N H-25-1188 337 2 09/01/2025 2 19-3-304 (3.3) N H-25-1188 337 2 09/01/2025 2 19-3-307 (1) A H-25-1188 337 3 09/01/2025 2 19-3-307 (4) A H-25-1188 337 3 09/01/2025 4 19-3-502 IP(2.7)(a) A H-25-1204 338 6 08/06/2025 4 19-3-502 (2.7)(b) A H-25-1204 338 6 08/06/2025 4 19-3-602 IP(1.5)(a) A H-25-1204 338 7 08/06/2025 4 19-3-602 (1.5)(b) A H-25-1204 338 7 08/06/2025 4 19-3-702 IP(4)(e) A H-25-1204 338 3 08/06/2025 4 19-3-702 (4)(e)(III.5) N H-25-1204 338 3 08/06/2025 4 19-3.1-101 IP(3)(a) A H-25-1200 270 7 08/06/2025 4, 23 19-3.3-101.5 N H-25-1200 270 1 08/06/2025 4, 23 19-3.3-101.5 N S-25-275 377 78 08/06/2025 4, 5 19-3.3-102 (1)(a) A H-25-1200 270 2 08/06/2025 4, 5 19-3.3-102 (1)(a) A S-25-275 377 79 08/06/2025 4, 5 19-3.3-102 (2)(a) A H-25-1200 270 2 08/06/2025 4, 5 19-3.3-102 (2)(a) A S-25-275 377 79 08/06/2025 4, 5 19-3.3-102 (3)(a)(I) A H-25-1200 270 2 08/06/2025 4, 5 19-3.3-102 (3)(a)(I) A S-25-275 377 79 08/06/2025 4 19-3.3-103 A H-25-1200 270 3 08/06/2025 4, 27 19-3.3-103.4 N H-25-1200 270 4 08/06/2025 4, 27 19-3.3-103.5 N H-25-1200 270 4 08/06/2025 4 19-3.3-108 (1)(d) N H-25-1200 270 6 08/06/2025 2 19-3.3-112 N S-25-151 70 2 04/10/2025 4 19-3.3-113 N H-25-1200 270 5 08/06/2025 19-4-107.3 IP(3) A H-25-1159 334 6 05/31/2025 19-4-107.3 (3)(a) A H-25-1159 334 6 05/31/2025 19-4-116 IP(6) A H-25-1159 334 7 02/01/2026 19-4-116 (6)(e) R H-25-1159 334 7 02/01/2026 19-4-116 (6)(g) A H-25-1159 334 7 02/01/2026 19-4-116 (6)(j) A H-25-1159 334 7 02/01/2026 19-4-116 (6)(l) N H-25-1159 334 7 02/01/2026 19-4-116 (6)(m) N H-25-1159 334 7 02/01/2026 19-4-116 (6)(n) N H-25-1159 334 7 02/01/2026 19-4-116 (6)(o) N H-25-1159 334 7 02/01/2026 19-4-116 (6)(p) N H-25-1159 334 7 02/01/2026 19-4-116 (6)(q) N H-25-1159 334 7 02/01/2026 4 19-5-101 (1) A H-25-1185 158 1 08/06/2025 4 19-5-103 IP(1.5)(a) A H-25-1204 338 8 08/06/2025 4 19-5-103 (1.5)(b) A H-25-1204 338 8 08/06/2025 4 19-5-103 (13) N H-25-1185 158 2 08/06/2025 4 19-5-104 (5) A H-25-1185 158 3 08/06/2025 4 19-5-105.5 (4.3) N H-25-1185 158 4 08/06/2025 4 19-5-105.5 (6.7) A H-25-1185 158 4 08/06/2025 4 19-5-105.5 (7.3) A H-25-1204 338 9 08/06/2025 4 19-5-105.7 (4.3) N H-25-1185 158 5 08/06/2025 4 19-5-105.7 (10) A H-25-1185 158 5 08/06/2025 4 19-5-105.7 (11)(b) A H-25-1204 338 10 08/06/2025 4 19-5-208 IP(2.5)(a) A H-25-1204 338 11 08/06/2025 4 19-5-208 (2.5)(b) A H-25-1204 338 11 08/06/2025 19-7-105 N H-25-1271 262 1 05/28/2025 19-7-305 (1)(c)(IV) A H-25-1271 262 2 05/28/2025 TITLE 20 Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date 4 20-1-306 (2) A S-25-244 121 1 08/06/2025 TITLE 21 Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date 4 21-1-104 (6) A H-25-1116 153 2 08/06/2025 4, 51 21-2-100.3 N S-25-275 377 80 08/06/2025 4 21-2-101 (2) A S-25-275 377 81 08/06/2025 4, 174 21-2-103 (1.5)(c) R S-25-275 377 336 08/06/2025 TITLE 22 Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date 22-1-104.9 N H-25-1149 394 1 06/03/2025 4, 21 22-1-119.1 (1) A S-25-164 168 3 08/06/2025 4, 114 22-1-119.1 (1)(c) A S-25-300 428 20 08/06/2025 4, 114 22-1-119.1 (1)(c) A H-25-1293 282 2 08/06/2025 4, 115 22-1-119.1 (4) A S-25-300 428 20 08/06/2025 4, 115 22-1-119.1 (4) A H-25-1293 282 2 08/06/2025 4 22-1-119.1 (5) N H-25-1293 282 2 08/06/2025 22-1-119.5 (5) A S-25-278 295 1 05/30/2025 22-1-119.5 (5.5)(a)(I) A S-25-278 295 1 05/30/2025 22-1-119.5 (5.5)(a)(II) A S-25-278 295 1 05/30/2025 22-1-119.5 (5.5)(b) A S-25-278 295 1 05/30/2025 22-1-119.5 (5.5)(c) A S-25-278 295 1 05/30/2025 22-1-119.5 (5.5)(d) A S-25-278 295 1 05/30/2025 22-1-119.5 IP(5.5)(e) A S-25-278 295 1 05/30/2025 22-1-119.5 (5.5)(f) A S-25-278 295 1 05/30/2025 22-1-119.5 (6) A S-25-278 295 1 05/30/2025 22-1-119.5 (8)(a) A S-25-278 295 1 05/30/2025 22-1-119.5 (8)(e) A S-25-278 295 1 05/30/2025 22-1-119.5 (8)(f) A S-25-278 295 1 05/30/2025 22-1-119.5 IP(8)(g) A S-25-278 295 1 05/30/2025 22-1-119.5 (8)(g)(II) A S-25-278 295 1 05/30/2025 22-1-119.5 (8)(g)(III) A S-25-278 295 1 05/30/2025 22-1-119.5 (10) N S-25-278 295 1 05/30/2025 4 22-1-119.7 (2) A S-25-300 428 21 08/06/2025 22-1-129.7 N S-25-191 164 2 05/05/2025 4 22-1-135 (1)(d) A S-25-300 428 22 08/06/2025 3, 4 22-1-135 IP(2)(d) A H-25-1152 246 1 08/06/2025 3, 4 22-1-135 (2)(d)(II)(C) N H-25-1152 246 1 08/06/2025 3, 4 22-1-135 (2)(d)(III) A H-25-1152 246 1 08/06/2025 3, 4 22-1-135 (2)(d)(IV) N H-25-1152 246 1 08/06/2025 3, 4 22-1-135 (2)(e) N H-25-1152 246 1 08/06/2025 22-1-136 A S-25-236 140 1 07/01/2025 22-1-139 (1)(b)(VII) A H-25-1248 251 2 05/24/2025 1 22-1-145.5 N H-25-1312 205 6 05/16/2025 2 22-1-148 N S-25-063 161 2 05/01/2025 2, 4 22-1-149 N H-25-1135 162 2 08/06/2025 4 22-1-150 N H-25-1250 351 3 08/06/2025 22-2-112 (1)(i) R S-25-216 98 1 07/01/2025 22-2-112 (4)(a) A S-25-222 100 2 04/24/2025 22-2-113.8 (1) A S-25-221 134 1 04/28/2025 2 22-2-117 (1)(b)(XI) A S-25-276 240 24 05/23/2025 2 22-2-117 (1)(b)(XII) A S-25-276 240 24 05/23/2025 2 22-2-117 (1)(b)(XIII) N S-25-276 240 24 05/23/2025 22-2-127.4 N H-25-1149 394 3 06/03/2025 22-2-135 IP(3)(a) A S-25-278 295 2 05/30/2025 22-2-135 (3)(a)(III) A S-25-278 295 2 05/30/2025 22-2-135 (3)(a)(IV) A S-25-278 295 2 05/30/2025 22-2-136 (2)(a)(III) A S-25-222 100 3 04/24/2025 2, 4 22-2-136 (2)(b) A H-25-1192 239 2 08/06/2025 2, 4 22-2-136 (2)(c) A H-25-1192 239 2 08/06/2025 2, 4 22-2-136 (2)(d) N H-25-1192 239 2 08/06/2025 2, 4 22-5-123 N H-25-1245 400 3 08/06/2025 2, 4 22-7-604.5 (1.2) N H-25-1167 247 2 08/06/2025 2, 4 22-7-604.5 (1.5)(j) A H-25-1167 247 2 08/06/2025 2, 4 22-7-604.5 (4) N H-25-1167 247 2 08/06/2025 2, 4 22-7-604.5 (5) N H-25-1167 247 2 08/06/2025 2, 4 22-7-604.5 (6) N H-25-1167 247 2 08/06/2025 4 22-7-1005 (2.2) N H-25-1293 282 1 08/06/2025 22-7-1005 (2.9) N H-25-1149 394 2 06/03/2025 2 22-7-1006.3 (1)(d) A H-25-1278 235 2 05/23/2025 2 22-7-1006.3 (2)(b) A H-25-1278 235 2 05/23/2025 2 22-7-1006.3 (3)(e) N H-25-1278 235 2 05/23/2025 2 22-7-1006.3 (4)(a) A H-25-1278 235 2 05/23/2025 2 22-7-1006.3 (4)(b) A H-25-1278 235 2 05/23/2025 2 22-7-1006.3 (7)(a) A H-25-1278 235 2 05/23/2025 2 22-7-1006.3 (8)(a) A H-25-1278 235 2 05/23/2025 2 22-7-1006.3 (12) N H-25-1278 235 2 05/23/2025 2, 4 22-7-1203 (1) A S-25-200 234 2 08/06/2025 2, 4 22-7-1203 (1.5) N S-25-200 234 2 08/06/2025 2, 4 22-7-1203 (3.5) N S-25-200 234 2 08/06/2025 2, 4 22-7-1203 (3.7) N S-25-200 234 2 08/06/2025 2, 4 22-7-1203 (7.6) N S-25-200 234 2 08/06/2025 2, 4 22-7-1203 (7.7) N S-25-200 234 2 08/06/2025 2, 4 22-7-1203 (9.5) N S-25-200 234 2 08/06/2025 2, 4 22-7-1203 (9.7) N S-25-200 234 2 08/06/2025 2, 4 22-7-1203 (9.9) N S-25-200 234 2 08/06/2025 2, 4 22-7-1203 (10.5) N S-25-200 234 2 08/06/2025 2, 4 22-7-1203 (10.6) N S-25-200 234 2 08/06/2025 2, 4 22-7-1203 (18) N S-25-200 234 2 08/06/2025 2, 4 22-7-1203 (19) N S-25-200 234 2 08/06/2025 2, 4 22-7-1205 (1)(b) A S-25-200 234 3 08/06/2025 2, 4 22-7-1205 (2)(b)(II) A S-25-200 234 3 08/06/2025 2, 4 22-7-1205 (2)(b)(IV) A S-25-200 234 3 08/06/2025 2, 4 22-7-1205 (2)(b)(V) A S-25-200 234 3 08/06/2025 2, 4 22-7-1208 (9) N S-25-200 234 4 08/06/2025 2, 4 22-7-1209 (1)(a) A S-25-200 234 5 08/06/2025 2, 4 22-7-1209 (2)(a)(I) A S-25-200 234 5 08/06/2025 2, 4 22-7-1209 (2.5) N S-25-200 234 5 08/06/2025 2, 4 22-7-1209 IP(3) A S-25-200 234 5 08/06/2025 2, 4 22-7-1209 (3)(b) A S-25-200 234 5 08/06/2025 2 22-7-1209 (7) A H-25-1320 236 22 05/23/2025 2, 4 22-7-1209 (8)(c)(I) A S-25-200 234 5 08/06/2025 4 22-9.7-100.3 N S-25-275 377 82 08/06/2025 4 22-9.7-101 A S-25-275 377 83 08/06/2025 22-10-108 R S-25-219 132 1 04/28/2025 2 22-11-103 (22.5) N H-25-1278 235 3 05/23/2025 2 22-11-202 (2)(c)(II) R H-25-1278 235 4 05/23/2025 2 22-11-202 (2)(c)(III) A H-25-1278 235 4 05/23/2025 2 22-11-202 (2)(c)(IV) N H-25-1278 235 4 05/23/2025 2 22-11-202 (3) N H-25-1278 235 4 05/23/2025 2 22-11-204 (1)(b) A H-25-1278 235 5 05/23/2025 2 22-11-204 (1)(e) N H-25-1278 235 5 05/23/2025 2 22-11-204 (1)(f) N H-25-1278 235 5 05/23/2025 2 22-11-204 (4) A H-25-1278 235 5 05/23/2025 2 22-11-204 (4.5) N H-25-1278 235 5 05/23/2025 2 22-11-204 (5) A H-25-1278 235 5 05/23/2025 2 22-11-207 IP(1) A H-25-1278 235 6 05/23/2025 2 22-11-207 IP(2) A H-25-1278 235 6 05/23/2025 2 22-11-207 (2)(a) A H-25-1278 235 6 05/23/2025 2 22-11-207 (2.5)(c) N H-25-1278 235 6 05/23/2025 2 22-11-207 (4)(a) A H-25-1278 235 6 05/23/2025 2 22-11-207 (5) A H-25-1278 235 6 05/23/2025 2, 4 22-11-208 (1)(a) A H-25-1210 156 2 08/06/2025 2 22-11-208 IP(2) A H-25-1278 235 7 05/23/2025 2 22-11-208 (2.3) N H-25-1278 235 7 05/23/2025 2 22-11-208 (2.5) A H-25-1278 235 7 05/23/2025 2 22-11-208 (2.7) N H-25-1278 235 7 05/23/2025 2 22-11-208 IP(3) A H-25-1278 235 7 05/23/2025 2 22-11-208 (4) N H-25-1278 235 7 05/23/2025 2 22-11-208 (5) N H-25-1278 235 7 05/23/2025 2 22-11-209 (2)(a)(I)(E) A H-25-1278 235 8 05/23/2025 2 22-11-209 (2)(a)(I)(G) N H-25-1278 235 8 05/23/2025 2 22-11-209 (2)(a)(II)(B) A H-25-1278 235 8 05/23/2025 2 22-11-209 (2)(a)(II)(C) A H-25-1278 235 8 05/23/2025 2 22-11-209 (2)(a)(II)(D) N H-25-1278 235 8 05/23/2025 2 22-11-209 (3.5)(a) A H-25-1278 235 8 05/23/2025 2 22-11-209 (5) N H-25-1278 235 8 05/23/2025 2 22-11-209 (6) N H-25-1278 235 8 05/23/2025 2 22-11-210 (1)(d)(I) A H-25-1278 235 9 05/23/2025 2 22-11-210 (1)(d.5) A H-25-1278 235 9 05/23/2025 2, 4 22-11-210 (2)(a) A H-25-1210 156 3 08/06/2025 2 22-11-210 IP(4) A H-25-1278 235 9 05/23/2025 2 22-11-210 IP(5)(a) A H-25-1278 235 9 05/23/2025 2 22-11-210 (5)(a)(V) A H-25-1278 235 9 05/23/2025 2 22-11-210 (5)(a)(VII) N H-25-1278 235 9 05/23/2025 2 22-11-210 (5)(b) A H-25-1278 235 9 05/23/2025 2 22-11-210 (5.5)(a) A H-25-1278 235 9 05/23/2025 2 22-11-210 (7) N H-25-1278 235 9 05/23/2025 2 22-11-210 (8) N H-25-1278 235 9 05/23/2025 2 22-11-210 (9) N H-25-1278 235 9 05/23/2025 2 22-11-210 (10) N H-25-1278 235 9 05/23/2025 2 22-11-212 N H-25-1278 235 10 05/23/2025 2 22-11-213 N H-25-1278 235 11 05/23/2025 2 22-11-303 IP(3) A H-25-1278 235 12 05/23/2025 2 22-11-303 (3)(b) A H-25-1278 235 12 05/23/2025 2 22-11-304 (3)(b) A H-25-1278 235 13 05/23/2025 2 22-11-305 (1)(a) A H-25-1278 235 14 05/23/2025 2 22-11-305 (1)(c) A H-25-1278 235 14 05/23/2025 2 22-11-305 (2)(a) A H-25-1278 235 14 05/23/2025 2 22-11-305 (2)(b) A H-25-1278 235 14 05/23/2025 2 22-11-305 (3)(b) A H-25-1278 235 14 05/23/2025 2 22-11-305 (3)(e) A H-25-1278 235 14 05/23/2025 2 22-11-305 (3)(e.5) N H-25-1278 235 14 05/23/2025 2 22-11-306 (1)(a) A H-25-1278 235 15 05/23/2025 2 22-11-306 (2)(a) A H-25-1278 235 15 05/23/2025 2 22-11-306 (3)(b) A H-25-1278 235 15 05/23/2025 2 22-11-306 (3)(e) A H-25-1278 235 15 05/23/2025 2 22-11-306 (3)(e.5) N H-25-1278 235 15 05/23/2025 2 22-11-405 (1)(a) A H-25-1278 235 16 05/23/2025 2 22-11-405 (2)(a) A H-25-1278 235 16 05/23/2025 2 22-11-405 (4)(b.5) N H-25-1278 235 16 05/23/2025 2 22-11-406 (1)(a) A H-25-1278 235 17 05/23/2025 2 22-11-406 (2)(a) A H-25-1278 235 17 05/23/2025 2 22-11-406 (3)(b.5) N H-25-1278 235 17 05/23/2025 2 22-11-505 N H-25-1278 235 18 05/23/2025 4 22-11-600.3 N S-25-275 377 84 08/06/2025 4 22-11-601 (1) A S-25-275 377 85 08/06/2025 2 22-13-103 (1)(b) A H-25-1278 235 19 05/23/2025 2 22-13-103 (1)(c)(V) A H-25-1278 235 19 05/23/2025 2 22-13-103 (1)(d) N H-25-1278 235 19 05/23/2025 2 22-13-103 (1)(e) N H-25-1278 235 19 05/23/2025 2 22-13-103 IP(2) A H-25-1278 235 19 05/23/2025 22-13-105 (6) N S-25-218 116 1 04/25/2025 22-15.5- (entire article 15.5) N H-25-1248 251 1 05/24/2025 22-20-114.7 (2)(h) N S-25-264 129 11 04/25/2025 2, 4 22-20.5-102 (3) A S-25-200 234 6 08/06/2025 22-27.5-105 (5) N S-25-264 129 12 04/25/2025 2 22-30.5-104 IP(6)(c) A S-25-276 240 25 05/23/2025 2 22-30.5-104 (6)(c)(X) A S-25-276 240 25 05/23/2025 2 22-30.5-104 (6)(c)(XI) A S-25-276 240 25 05/23/2025 2 22-30.5-104 (6)(c)(XII) N S-25-276 240 25 05/23/2025 2 22-30.5-112 (2)(a)(III)(A) A H-25-1320 236 3 05/23/2025 2 22-30.5-112 (2)(a.5)(II) A H-25-1320 236 3 05/23/2025 2 22-30.5-112 (2)(a.8)(I) A H-25-1320 236 3 05/23/2025 2 22-30.5-112 (2)(a.9) A H-25-1320 236 3 05/23/2025 2 22-30.5-112 (2)(c)(II) A H-25-1320 236 3 05/23/2025 2 22-30.5-112 (2)(e)(II)(B) A H-25-1320 236 3 05/23/2025 2 22-30.5-112 (3)(a)(II) A H-25-1320 236 3 05/23/2025 2 22-30.5-112 (3)(a)(III) A H-25-1320 236 3 05/23/2025 2 22-30.5-112.1 (1)(g) A H-25-1320 236 4 05/23/2025 2 22-30.5-112.1 (1)(j) A H-25-1320 236 4 05/23/2025 2 22-30.5-112.1 (3)(a) A H-25-1320 236 4 05/23/2025 22-30.5-112.2 (1)(b) R S-25-315 237 4 07/01/2026 2 22-30.5-112.2 (2)(a) A H-25-1320 236 7 05/23/2025 22-30.5-112.2 (2)(b) A S-25-315 237 4 07/01/2026 2 22-30.5-112.2 (2)(c) N H-25-1320 236 7 05/23/2025 2 22-30.5-112.2 (3) A H-25-1320 236 7 05/23/2025 2 22-30.5-112.2 (5) N H-25-1320 236 7 05/23/2025 2 22-30.5-112.4 N H-25-1320 236 2 05/23/2025 2 22-30.5-112.6 N H-25-1320 236 5 05/23/2025 2 22-30.5-112.7 N H-25-1320 236 6 05/23/2025 2, 4 22-30.5-121 N H-25-1245 400 4 08/06/2025 2 22-30.5-408 (2)(a) A H-25-1320 236 10 05/23/2025 2 22-30.5-507 IP(7)(b) A S-25-276 240 26 05/23/2025 2 22-30.5-507 (7)(b)(X) A S-25-276 240 26 05/23/2025 2 22-30.5-507 (7)(b)(XI) A S-25-276 240 26 05/23/2025 2 22-30.5-507 (7)(b)(XII) N S-25-276 240 26 05/23/2025 2 22-30.5-513 (1)(e) A H-25-1320 236 8 05/23/2025 2 22-30.5-513 (1)(j)(II) A H-25-1320 236 8 05/23/2025 2 22-30.5-513 (2)(b) A H-25-1320 236 8 05/23/2025 2 22-30.5-513 (2)(e)(II) A H-25-1320 236 8 05/23/2025 2 22-30.5-513 (4)(a)(I) A H-25-1320 236 8 05/23/2025 2 22-30.5-513 IP(4)(a)(I.5) A H-25-1320 236 8 05/23/2025 2 22-30.5-513 (4.5)(a) A H-25-1320 236 8 05/23/2025 22-30.5-513 (4.5)(b) A S-25-315 237 5 07/01/2026 2 22-30.5-513 (4.5)(b.5) N H-25-1320 236 8 05/23/2025 2 22-30.5-513 (4.5)(d) A H-25-1320 236 8 05/23/2025 2 22-30.5-513 (4.5)(e) N H-25-1320 236 8 05/23/2025 2 22-30.5-513 (9)(a) A H-25-1320 236 8 05/23/2025 2 22-30.5-513 (10)(a) A H-25-1320 236 8 05/23/2025 22-30.5-513.1 (2)(b) A S-25-223 135 1 04/28/2025 22-30.5-513.1 (2)(c) N S-25-223 135 1 04/28/2025 22-30.5-513.1 (2)(d) N S-25-223 135 1 04/28/2025 22-30.5-528 R H-25-1248 251 5 05/24/2025 22-30.5-529 (2)(a) A S-25-143 86 2 04/18/2025 22-30.5-529 (2)(c) N S-25-143 86 2 04/18/2025 22-30.5-529 (2)(d) N S-25-143 86 2 04/18/2025 22-30.5-529 (2.5) N S-25-143 86 2 04/18/2025 22-30.5-529 (4) R S-25-143 86 2 04/18/2025 2, 4 22-30.5-531 N H-25-1245 400 5 08/06/2025 5 22-32-109.1 IP(2)(a)(I) A H-25-1248 251 3 05/24/2025 1, 5 22-32-109.1 IP(2)(a)(I) A H-25-1312 205 7 05/16/2025 1 22-32-109.1 (2)(a)(I)(J) A H-25-1312 205 7 05/16/2025 22-32-109.1 (2)(a)(I)(L) A H-25-1248 251 3 05/24/2025 22-32-109.5 R S-25-222 100 1 04/24/2025 4 22-32-110 (1)(f) A H-25-1006 316 1 08/06/2025 2, 4 22-32-135 (4) A H-25-1192 239 3 08/06/2025 22-32-147 R H-25-1248 251 5 05/24/2025 22-32-150 (2)(a) A S-25-143 86 1 04/18/2025 22-32-150 (2)(c) N S-25-143 86 1 04/18/2025 22-32-150 (2)(d) N S-25-143 86 1 04/18/2025 22-32-150 (2.5) N S-25-143 86 1 04/18/2025 22-32-150 (4) R S-25-143 86 1 04/18/2025 4 22-32-152 N H-25-1059 77 1 08/06/2025 2, 4 22-32-153 N H-25-1245 400 2 08/06/2025 22-35-102 (3) R S-25-315 237 6 07/01/2026 22-35-103 (1.5) R S-25-315 237 7 07/01/2026 22-35-104 (1)(a)(III) A S-25-315 237 8 07/01/2026 22-35-104 IP(1)(d) A S-25-315 237 8 07/01/2026 22-35-104 (1)(e) A S-25-315 237 8 07/01/2026 22-35-107 (6)(a) A S-25-315 237 9 07/01/2026 22-35-107 (6)(d) R S-25-315 237 9 07/01/2026 22-35-107 (6)(e) A S-25-315 237 9 07/01/2026 22-35-107 IP(7) A S-25-315 237 9 07/01/2026 22-35-107 (7)(a) R S-25-315 237 9 07/01/2026 22-35-108 (2)(c) A S-25-315 237 2 05/23/2025 22-35-108 (8) N S-25-315 237 2 05/23/2025 22-35-108 (9) N S-25-315 237 2 05/23/2025 22-35-108.5 (2)(b)(II) R S-25-315 237 3 05/23/2025 4 22-35-108.5 (8) N S-25-154 173 2 08/06/2025 4 22-35-110 (1) A S-25-154 173 3 08/06/2025 22-35-113 (1)(a) A S-25-315 237 10 07/01/2026 22-35-114 R S-25-315 237 24 05/23/2025 22-35-115 (8) N S-25-315 237 11 05/23/2025 22-35-116 N S-25-315 237 12 05/23/2025 22-35.3-103 (4) A S-25-315 237 13 07/01/2026 4 22-36-107 (3)(f) N S-25-073 72 1 08/06/2025 4 22-36-107 (3)(g) N S-25-073 72 1 08/06/2025 4 22-40-111 N H-25-1080 317 3 08/06/2025 2 22-41-102 (3)(i)(IV) A H-25-1320 236 19 05/23/2025 22-41-102 (3)(j)(I) A S-25-167 449 1 06/04/2025 2 22-41-102 (3)(j)(IV) A H-25-1320 236 19 05/23/2025 22-41-102 (3)(k)(I) A S-25-167 449 1 06/04/2025 2 22-41-102 (3)(k)(III) A H-25-1320 236 19 05/23/2025 22-41-102.5 (1)(a)(III) A S-25-167 449 2 06/04/2025 22-41-102.5 (3) A S-25-167 449 2 06/04/2025 22-41-102.5 (4)(a)(II) A S-25-167 449 2 06/04/2025 22-41-102.5 (5) A S-25-167 449 2 06/04/2025 22-41-104 (1) A S-25-167 449 3 06/04/2025 22-41-104 (2) A S-25-167 449 3 06/04/2025 22-41-104 (4) N S-25-167 449 3 06/04/2025 22-41-104.7 N S-25-167 449 4 06/04/2025 2 22-43.7-104 (1) A H-25-1320 236 20 05/23/2025 2 22-43.7-104 (2)(d)(I) A H-25-1320 236 20 05/23/2025 2 22-43.7-104 (2)(d.5) N H-25-1320 236 20 05/23/2025 22-43.7-104 (2)(g) A S-25-268 374 4 06/03/2025 2 22-43.7-104 (7) N H-25-1320 236 20 05/23/2025 4 22-43.7-200.3 N S-25-275 377 86 08/06/2025 4 22-43.7-201 (1) A S-25-275 377 87 08/06/2025 22-43.7-201 (5) N S-25-264 129 13 04/25/2025 22-44-105 (6)(d) N S-25-264 129 14 04/25/2025 2 22-45-103 (1)(k)(III) A S-25-113 2 3 02/27/2025 22-54-103 (1.4) R S-25-315 237 14 07/01/2026 2 22-54-103 (1.5)(e) N H-25-1320 236 11 05/23/2025 22-54-103 (5.2) A S-25-315 237 14 07/01/2026 2 22-54-103.2 (2)(a) A H-25-1320 236 12 05/23/2025 2 22-54-103.2 (2)(b) A H-25-1320 236 12 05/23/2025 2 22-54-103.3 (1)(a) A H-25-1320 236 13 05/23/2025 2 22-54-103.3 (1)(c) A H-25-1320 236 13 05/23/2025 2 22-54-103.3 (2) A H-25-1320 236 13 05/23/2025 2 22-54-103.3 (3) A H-25-1320 236 13 05/23/2025 2 22-54-103.3 (4) A H-25-1320 236 13 05/23/2025 2 22-54-103.3 IP(5)(b)(I) A H-25-1320 236 13 05/23/2025 2 22-54-103.3 (5)(c)(I)(C) A H-25-1320 236 13 05/23/2025 2 22-54-103.3 (6) A H-25-1320 236 13 05/23/2025 2 22-54-103.5 (1)(a) A H-25-1320 236 14 05/23/2025 2 22-54-103.5 (1)(c)(I) A H-25-1320 236 14 05/23/2025 2 22-54-103.5 (1)(c)(III) A H-25-1320 236 14 05/23/2025 2 22-54-103.5 (3) N H-25-1320 236 14 05/23/2025 2 22-54-103.5 (4) A H-25-1320 236 14 05/23/2025 22-54-103.5 (8)(a) A S-25-315 237 15 05/23/2025 22-54-103.5 (8)(c) N S-25-315 237 15 05/23/2025 2 22-54-103.5 (12)(d) A H-25-1320 236 14 05/23/2025 2 22-54-103.5 (12)(e) A H-25-1320 236 14 05/23/2025 2 22-54-103.5 (13)(b.5) N H-25-1320 236 14 05/23/2025 2, 149 22-54-103.5 (14) N H-25-1320 236 15 2, 150 22-54-103.5 (14) N H-25-1320 236 16 05/23/2025 2 22-54-104 (1)(c)(I) A H-25-1320 236 17 05/23/2025 22-54-104 (4.7)(a) A S-25-315 237 16 05/23/2025 22-54-104 (4.7)(d) A S-25-315 237 16 05/23/2025 22-54-104 (4.7)(e) N S-25-315 237 16 05/23/2025 2 22-54-104 (5.5) A S-25-113 2 2 02/27/2025 2 22-54-104 (7)(i) N H-25-1320 236 17 05/23/2025 2 22-54-104 (7)(j) N H-25-1320 236 17 05/23/2025 2 22-54-104 (8) A H-25-1320 236 17 05/23/2025 2 22-54-104.6 IP(1)(a) A H-25-1320 236 18 05/23/2025 2 22-54-104.6 (1)(b) A H-25-1320 236 18 05/23/2025 2 22-54-104.6 (1.5) N H-25-1320 236 18 05/23/2025 2 22-54-104.6 (12) A H-25-1320 236 18 05/23/2025 22-54-114 (5) R S-25-216 98 2 07/01/2025 2 22-54-136 R H-25-1320 236 9 05/23/2025 22-54-138 (2) A S-25-315 237 17 05/23/2025 22-54-138 (3)(a) A S-25-315 237 17 05/23/2025 22-54-138 (3.5)(a) A S-25-315 237 17 05/23/2025 22-54-138 IP(4)(b) A S-25-315 237 17 05/23/2025 22-54-138 (5)(a) A S-25-315 237 17 05/23/2025 22-54-138 IP(8) A S-25-315 237 17 05/23/2025 22-54-138 (9) A S-25-315 237 17 05/23/2025 22-54-2 (entire part 2) N S-25-315 237 1 05/23/2025 2 22-55-103 (6) N H-25-1320 236 21 05/23/2025 4 22-60.3-201 (5.5) N H-25-1307 443 1 08/06/2025 4 22-60.3-204 (2)(b)(II) A H-25-1307 443 2 08/06/2025 4 22-60.5-111.5 (4)(d) A S-25-300 428 23 08/06/2025 4 22-60.5-203 IP(6) A S-25-154 173 1 08/06/2025 4 22-60.5-203 (6)(a) A S-25-154 173 1 08/06/2025 4 22-60.5-203 IP(6)(b) A S-25-154 173 1 08/06/2025 4 22-60.5-203 (7) N S-25-154 173 1 08/06/2025 4 22-60.5-209.1 (1)(a)(II) R H-25-1307 443 3 08/06/2025 4 22-60.5-209.1 (1)(a)(III) A H-25-1307 443 3 08/06/2025 2, 4 22-80-120 N H-25-1245 400 6 08/06/2025 2, 108 22-82.9-203 (5.5) N H-25-1274 402 4 2 22-82.9-204 (1)(a)(I) A S-25-214 372 2 06/03/2025 2 22-82.9-204 (1)(a)(II) A S-25-214 372 2 06/03/2025 2 22-82.9-204 (1)(b) A S-25-214 372 2 06/03/2025 2 22-82.9-204 (1)(b.3) N S-25-214 372 2 06/03/2025 2 22-82.9-204 (1)(b.5) N S-25-214 372 2 06/03/2025 2 22-82.9-204 (2) A S-25-214 372 2 06/03/2025 2, 108 22-82.9-204 (7)(a)(IV) A H-25-1274 402 5 2, 108 22-82.9-205 (1)(a) A H-25-1274 402 6 2, 108 22-82.9-205 (2)(a) A H-25-1274 402 6 2, 108 22-82.9-205 (3)(a) A H-25-1274 402 6 2, 108 22-82.9-205 (3)(c) N H-25-1274 402 6 2, 108 22-82.9-205 (3)(d) N H-25-1274 402 6 2, 108 22-82.9-205 (3)(e) N H-25-1274 402 6 2, 108 22-82.9-206 (1) A H-25-1274 402 7 2, 108 22-82.9-207 (2)(b) A H-25-1274 402 8 2, 102 22-82.9-208 (1)(a)(II) A S-25-214 372 5 06/03/2025 2, 102, 108 22-82.9-208 (1)(a)(II) A H-25-1274 402 9 2 22-82.9-209 (2) A S-25-214 372 3 06/03/2025 2, 108 22-82.9-211 (1)(a) R H-25-1274 402 10 2, 108 22-82.9-211 (1)(a.5) N H-25-1274 402 10 2, 108 22-82.9-211 (1)(b) A H-25-1274 402 10 2, 108 22-82.9-211 (1)(c) N H-25-1274 402 10 2, 108 22-82.9-211 (1)(d) N H-25-1274 402 10 2, 108 22-82.9-211 (2) A H-25-1274 402 10 2, 108 22-82.9-211 IP(3)(a) A H-25-1274 402 10 2 22-82.9-211 (3)(a)(I) A S-25-214 372 4 06/03/2025 2, 103 22-82.9-211 (3)(a)(IV) A H-25-1274 402 11 2, 103 22-82.9-211 (3)(a)(V) A H-25-1274 402 11 2, 103 22-82.9-211 (3)(a)(VI) N H-25-1274 402 11 2, 108 22-82.9-211 (3)(a.5) N H-25-1274 402 10 2, 108 22-82.9-211 (3)(b) A H-25-1274 402 10 2, 103 22-82.9-211 (3)(b) A H-25-1274 402 11 2, 108 22-82.9-211 (3)(c) N H-25-1274 402 10 2, 108 22-82.9-211 (3)(d) N H-25-1274 402 10 2, 108 22-82.9-211 (3)(e) N H-25-1274 402 10 2, 108 22-82.9-211 (3)(f) N H-25-1274 402 10 2, 108 22-82.9-211 (3)(g) N H-25-1274 402 10 2, 108 22-82.9-211 (3)(h) N H-25-1274 402 10 2, 108 22-82.9-211 (3)(i) N H-25-1274 402 10 2, 108 22-82.9-211 (4)(a) A H-25-1274 402 10 2, 108 22-82.9-211 (4)(b) A H-25-1274 402 10 2, 108 22-82.9-211 (4.5) N H-25-1274 402 10 2, 102 22-82.9-211 (5) A S-25-214 372 4 06/03/2025 2, 102, 108 22-82.9-211 (5) A H-25-1274 402 10 2, 103 22-82.9-211 (5.5) N H-25-1274 402 11 2, 108 22-82.9-211 (7) R H-25-1274 402 10 2 22-82.9-211 (8) N S-25-214 372 4 06/03/2025 2 22-82.9-212 N H-25-1274 402 2 06/03/2025 2 22-82.9-213 N H-25-1274 402 3 06/03/2025 2 22-82.9-301 (6.5) N S-25-214 372 7 06/03/2025 2, 152 22-82.9-302 (2)(b)(I) A S-25-214 372 8 06/03/2025 2, 104 22-82.9-302 (2)(b)(I) A H-25-1274 402 12 2, 105 22-82.9-302 (2)(b)(I) A H-25-1274 402 13 2, 109 22-82.9-302 (2)(b)(I) A H-25-1274 402 14 2, 110 22-82.9-302 (2)(b)(I) A H-25-1274 402 15 2, 109 22-82.9-302 (2)(b)(I.5) N H-25-1274 402 14 2, 110 22-82.9-302 (2)(b)(I.5) N H-25-1274 402 15 2, 152 22-82.9-302 (2)(b)(II)(D) A S-25-214 372 8 06/03/2025 2, 104 22-82.9-302 (2)(b)(II)(D) A H-25-1274 402 12 2, 105 22-82.9-302 (2)(b)(II)(D) A H-25-1274 402 13 2, 109 22-82.9-302 (2)(b)(II)(D) A H-25-1274 402 14 2, 110 22-82.9-302 (2)(b)(II)(D) A H-25-1274 402 15 2, 152 22-82.9-302 (2)(c) A S-25-214 372 8 06/03/2025 2, 104 22-82.9-302 (2)(c) A H-25-1274 402 12 2, 105 22-82.9-302 (2)(c) A H-25-1274 402 13 2, 109 22-82.9-302 (2)(c) A H-25-1274 402 14 2, 110 22-82.9-302 (2)(c) A H-25-1274 402 15 2 22-82.9-302 (3)(a) A S-25-214 372 8 06/03/2025 2, 109 22-82.9-302 (3.5) N H-25-1274 402 14 2, 110 22-82.9-302 (3.5) N H-25-1274 402 15 2, 214 22-82.9-304 IP(1) A S-25-214 372 9 06/03/2025 2, 107, 214 22-82.9-304 IP(1) A H-25-1274 402 16 2 22-82.9-304 (1)(b) A S-25-214 372 9 06/03/2025 2 22-82.9-306 R S-25-214 372 10 06/03/2025 2, 107, 215 22-82.9-306 R H-25-1274 402 17 22-91-104 (1) A S-25-315 237 23 05/23/2025 22-91-104 (4) A S-25-315 237 23 05/23/2025 22-91-104 (5)(a) A S-25-315 237 23 05/23/2025 22-95.5-1 (entire part 1) R S-25-220 133 1 07/01/2025 22-95.5-2 (entire part 2) R S-25-315 237 24 05/23/2025 4 22-96-102 (2.3) N S-25-275 377 88 08/06/2025 4 22-96-103 IP(1)(a) A S-25-275 377 89 08/06/2025 22-97-1 (entire part 1) R S-25-217 99 1 07/01/2025 4 22-102-104 (2)(b) A S-25-178 148 1 08/06/2025 4 22-102-104 (2)(b.5) N S-25-178 148 1 08/06/2025 2 22-105.5-104 (3)(c)(I) A H-25-1320 236 23 05/23/2025 2 22-105.5-106 IP(1) A H-25-1320 236 24 05/23/2025 2 22-105.5-106 (5) A H-25-1320 236 24 05/23/2025 22-106-103 (1) A S-25-215 115 1 04/25/2025 22-106-105 A S-25-215 115 2 04/25/2025 22-106-106 N S-25-215 115 3 04/25/2025 TITLE 23 Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date 23-1-104 (2) R S-25-233 119 1 04/25/2025 4 23-1-106 (6)(b) A H-25-1313 405 3 08/06/2025 4 23-1-106 (7)(c) A H-25-1313 405 3 08/06/2025 4 23-1-106 (9)(a) A H-25-1313 405 3 08/06/2025 4 23-1-106 (9)(b) A H-25-1313 405 3 08/06/2025 4 23-1-106 (9)(e) R H-25-1313 405 3 08/06/2025 4 23-1-106 IP(10.2)(b)(I) A H-25-1313 405 3 08/06/2025 23-1-108 (1.5)(f)(I)(A) A S-25-233 119 2 04/25/2025 23-1-113.2 (3) R S-25-233 119 3 04/25/2025 4 23-1-125.5 N H-25-1038 390 1 08/06/2025 23-1-135 (3)(b)(I) A S-25-315 237 18 07/01/2026 2, 4 23-1-2 (entire part 2) N S-25-087 85 2 08/06/2025 4 23-3-103 IP A S-25-275 377 90 08/06/2025 4 23-3-103 (1.5) N S-25-275 377 90 08/06/2025 4 23-3-104 A S-25-275 377 91 08/06/2025 23-3.3-102 (7.5) N S-25-230 137 1 04/28/2025 23-3.3-103 (23) N S-25-234 138 1 04/28/2025 2, 4 23-3.3-106 (5.5) N H-25-1192 239 4 08/06/2025 2, 4 23-3.3-401 (1) A H-25-1186 318 4 08/06/2025 2, 4 23-3.3-401 (4) N H-25-1186 318 4 08/06/2025 4, 52 23-3.3-900.3 N S-25-275 377 92 08/06/2025 4, 175 23-3.3-901 (2) R S-25-275 377 336 08/06/2025 23-3.9-302 (4)(a) A S-25-312 301 12 05/30/2025 23-3.9-302 (4)(b) A S-25-312 301 12 05/30/2025 23-3.9-303 (4)(a) A S-25-312 301 13 05/30/2025 23-3.9-303 (4)(b) A S-25-312 301 13 05/30/2025 23-3.9-402 (1)(b) A S-25-312 301 14 05/30/2025 23-5-109 (2) A S-25-236 140 2 07/01/2025 4 23-5-139 IP(1)(d)(I) A H-25-1313 405 4 08/06/2025 23-5-145.6 (3)(b) A S-25-315 237 19 07/01/2026 4 23-5-145.8 (2)(b) A S-25-300 428 24 08/06/2025 4, 211 23-5-145.8 IP(2)(c) A S-25-300 428 24 08/06/2025 211 23-5-145.8 (2)(c) A S-25-315 237 20 07/01/2026 4 23-6-100.3 N S-25-275 377 93 08/06/2025 4 23-6-101 (1) A S-25-275 377 94 08/06/2025 2 23-7-110 (2) A S-25-276 240 2 05/23/2025 2 23-7-110 (4) A S-25-276 240 2 05/23/2025 23-7.4-302 (1) A S-25-247 159 1 05/01/2025 23-7.4-302 (2) RE S-25-247 159 1 05/01/2025 23-7.4-302 (3) RE S-25-247 159 1 05/01/2025 23-7.4-302 (5) A S-25-247 159 1 05/01/2025 23-7.4-302 (6) A S-25-247 159 1 05/01/2025 23-7.4-302 (7) A S-25-247 159 1 05/01/2025 23-7.4-302 (9)(a) A S-25-247 159 1 05/01/2025 23-16-301 (1)(f) R H-25-1041 38 1 03/28/2025 23-16-301 (1)(g) A H-25-1041 38 1 03/28/2025 23-16-301 (2)(a) A H-25-1041 38 1 03/28/2025 23-16-301 (2)(c) A H-25-1041 38 1 03/28/2025 23-16-301 (2)(c.5) N H-25-1041 38 1 03/28/2025 23-16-301 (3) R H-25-1041 38 1 03/28/2025 23-16-301 (7) N H-25-1041 38 1 03/28/2025 23-18-201 (2) A S-25-230 137 2 04/28/2025 23-18-202 (2)(e) A S-25-230 137 3 04/28/2025 23-18-202 (5)(a)(I) A S-25-230 137 3 04/28/2025 23-18-202 (6) A S-25-230 137 3 04/28/2025 23-18-308 (1)(l) A S-25-232 102 2 07/01/2025 23-18-308 (1)(m) A S-25-232 102 2 07/01/2025 23-18-308 (1)(n) R S-25-232 102 2 07/01/2025 23-18-308 (1)(o) N S-25-045 191 3 05/14/2025 4 23-19.3-101 IP A S-25-067 54 1 08/06/2025 4 23-19.3-101 (4) N S-25-067 54 1 08/06/2025 4 23-19.3-102 (1)(a) A S-25-067 54 2 08/06/2025 4 23-19.3-102 (1)(b) A S-25-067 54 2 08/06/2025 4 23-19.3-102 (2)(a) A S-25-067 54 2 08/06/2025 4 23-19.3-102 (2)(b) A S-25-067 54 2 08/06/2025 4 23-19.3-102 (2)(d) A S-25-067 54 2 08/06/2025 4 23-19.3-102 (2)(e) A S-25-067 54 2 08/06/2025 4 23-19.3-102 (3) A S-25-067 54 2 08/06/2025 4 23-19.3-102 IP(4) A S-25-067 54 2 08/06/2025 4 23-19.3-102 (4)(a) A S-25-067 54 2 08/06/2025 4 23-19.7-101.5 N S-25-275 377 95 08/06/2025 4 23-19.7-102 (1) A S-25-275 377 96 08/06/2025 4 23-19.7-102 (2) A S-25-275 377 96 08/06/2025 23-20-146 N S-25-045 191 1 05/14/2025 23-20-3 (entire part 3) R S-25-232 102 1 07/01/2025 23-21-808 (1)(a) A S-25-268 374 1 06/03/2025 4 23-31-118 A H-25-1131 49 1 08/06/2025 4 23-31-200.3 N S-25-275 377 97 08/06/2025 4 23-31-201 (1) A S-25-275 377 98 08/06/2025 23-31-313 (10)(a)(V) N S-25-312 301 7 05/30/2025 23-31-319 (6) A S-25-115 4 1 02/27/2025 23-31-319 (8) A S-25-115 4 1 02/27/2025 4 23-31-701.5 N S-25-275 377 99 08/06/2025 4 23-31-703 (1) A S-25-275 377 100 08/06/2025 4 23-31-800.3 N S-25-275 377 101 08/06/2025 4 23-31-801 IP(1) A S-25-275 377 102 08/06/2025 4 23-31-803 A S-25-275 377 103 08/06/2025 4 23-31-1002 (1.5) N S-25-275 377 104 08/06/2025 4 23-31-1003 (1) A S-25-300 428 25 08/06/2025 4 23-31-1010 (1)(a) A S-25-275 377 105 08/06/2025 4 23-31-1101.5 N S-25-275 377 106 08/06/2025 4 23-31-1102 (1) A S-25-275 377 107 08/06/2025 4 23-31.3-100.3 N S-25-275 377 108 08/06/2025 4 23-31.3-101 (1)(a) A S-25-275 377 109 08/06/2025 4 23-31.3-103 A S-25-275 377 110 08/06/2025 23-41-104.6 R S-25-233 119 6 04/25/2025 23-41-104.7 R S-25-233 119 6 04/25/2025 23-41-107 A S-25-233 119 4 04/25/2025 4 23-51-100.3 N S-25-275 377 111 08/06/2025 4 23-51-102 IP(1)(a) A S-25-275 377 112 08/06/2025 4 23-52-100.3 N S-25-275 377 113 08/06/2025 4 23-52-102 IP(1)(a) A S-25-275 377 114 08/06/2025 4 23-53-100.3 N S-25-275 377 115 08/06/2025 4 23-53-102 IP(1)(a) A S-25-275 377 116 08/06/2025 4 23-54-100.3 N S-25-275 377 117 08/06/2025 4 23-54-102 IP(1)(a) A S-25-275 377 118 08/06/2025 4 23-54-102 (1)(a)(V) A S-25-275 377 128 08/06/2025 4 23-56-100.3 N S-25-275 377 119 08/06/2025 4 23-56-102 IP(1)(a) A S-25-275 377 120 08/06/2025 4 23-60-103 (1.5) N S-25-275 377 121 08/06/2025 4 23-60-104 (1)(b) A S-25-275 377 122 08/06/2025 2, 4 23-60-211 (6) N H-25-1221 71 2 08/06/2025 2, 4 23-60-804 N H-25-1221 71 3 08/06/2025 4 23-61.5-100.3 N S-25-275 377 123 08/06/2025 4 23-61.5-107 (1) A S-25-275 377 124 08/06/2025 23-64-122 (4) N S-25-264 129 15 04/25/2025 4 23-70-101 IP(1) A S-25-275 377 126 08/06/2025 4 23-70-101 (1)(a) A S-25-275 377 126 08/06/2025 4 23-70-101 (1)(b) A S-25-275 377 126 08/06/2025 4, 53 23-70-101.3 N S-25-275 377 125 08/06/2025 4 23-70-102 IP(1) A S-25-275 377 127 08/06/2025 4, 176 23-70-105.5 (1) R S-25-275 377 336 08/06/2025 23-70-118 N S-25-316 431 1 06/04/2025 23-70-119 N S-25-316 431 1 06/04/2025 23-80- (entire article 80) R S-25-231 101 1 07/01/2025 2, 4 23-82- (entire article 82) N H-25-1186 318 2 08/06/2025 2, 4 23-83- (entire article 83) N H-25-1186 318 3 08/06/2025 TITLE 24 Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date 24-1-114 (5)(b) A S-25-233 119 5 04/25/2025 4 24-1-119 (5)(a) A S-25-300 428 26 08/06/2025 24-1-120 (5)(g.5) N H-25-1154 230 24 05/22/2025 24-1-120 (5)(g.7) N H-25-1154 230 24 05/22/2025 24-1-120 (5)(h) A H-25-1154 230 24 05/22/2025 2, 4 24-1-124 (4)(d) A H-25-1165 257 29 08/06/2025 4 24-1-128.6 (6) R S-25-179 322 5 08/06/2025 4 24-1.5-101.5 N S-25-275 377 129 08/06/2025 4 24-1.5-102 (1) A S-25-275 377 130 08/06/2025 24-1.9-102 (1)(a)(VII) R H-25-1035 32 1 03/26/2025 24-1.9-102 (1)(a)(VIII) A H-25-1035 32 1 03/26/2025 24-1.9-102 (1)(a)(IX) N H-25-1035 32 1 03/26/2025 24-1.9-102.3 IP(3) A H-25-1035 32 2 03/26/2025 24-1.9-102.3 (6) N H-25-1035 32 2 03/26/2025 24-1.9-102.3 (7) N H-25-1035 32 2 03/26/2025 24-1.9-104 (1.5) R S-25-266 108 1 07/01/2025 4, 54 24-4.1-200.3 N S-25-275 377 131 08/06/2025 4, 177 24-4.1-201 (1.3) R S-25-275 377 336 08/06/2025 4, 178 24-4.1-201 (1.5)(a) R S-25-275 377 336 08/06/2025 4 24-4.1-201 (1.5)(b)(I) A S-25-275 377 132 08/06/2025 4 24-4.1-302 (1)(cc.2) N H-25-1290 353 3 08/06/2025 3 24-4.1-302 (1)(cc.5) A S-25-281 346 2 06/02/2025 4 24-4.1-302 (1)(jj.5) A S-25-300 428 27 08/06/2025 3, 4 24-4.1-302 (1)(mm) A S-25-288 339 7 08/06/2025 24-4.1-302.5 IP(1)(b.8) A S-25-304 414 2 06/03/2025 24-4.1-302.5 (1)(b.8)(II.5) N S-25-304 414 2 06/03/2025 3, 10 24-4.1-302.5 (1)(b.10) N H-25-1275 352 2 06/02/2025 4 24-4.1-502 (3) A S-25-300 428 28 08/06/2025 4 24-4.2-100.3 N S-25-275 377 133 08/06/2025 4 24-4.2-101 (1) A S-25-275 377 134 08/06/2025 4 24-4.2-103 (1) A S-25-275 377 135 08/06/2025 24-6-402 (1)(a)(II) A S-25-147 369 1 06/03/2025 24-6-402 (1)(a)(III) A S-25-147 369 1 06/03/2025 24-6-402 (1)(a)(IV) N S-25-147 369 1 06/03/2025 24-12-103 A H-25-1301 306 1 05/30/2025 3, 121 24-18.2- (entire article 18.2) N S-25-050 181 1 09/01/2026 5 24-22-117 IP(2) A H-25-1003 50 3 07/01/2025 2, 5 24-22-117 IP(2) A H-25-1288 260 2 05/27/2025 24-22-117 IP(2)(a)(II) A H-25-1003 50 3 07/01/2025 24-22-117 (2)(a)(II)(C) A H-25-1003 50 3 07/01/2025 2 24-22-117 (2)(b)(I) A H-25-1288 260 2 05/27/2025 2 24-22-117 (2)(b)(VI) N H-25-1288 260 2 05/27/2025 4 24-25-101.5 N S-25-275 377 136 08/06/2025 4 24-25-102 (1) A S-25-275 377 137 08/06/2025 4 24-25-104 (1) A S-25-275 377 138 08/06/2025 24-30-105 N H-25-1153 315 1 05/30/2025 4 24-30-202 (9)(a) A S-25-300 428 29 08/06/2025 24-30-1310 (3) R S-25-248 123 1 04/25/2025 24-30-1314 (1)(b) R S-25-248 123 2 04/25/2025 4 24-30-1404 (7)(a) A H-25-1313 405 5 08/06/2025 4 24-30-1404 (7)(b) A H-25-1313 405 5 08/06/2025 4 24-30-1404 IP(7)(c) A H-25-1313 405 5 08/06/2025 4 24-30-1404 (7)(c)(V) N H-25-1313 405 5 08/06/2025 4 24-30-1404 (7)(c)(VI) N H-25-1313 405 5 08/06/2025 4 24-30-1404 (7)(c)(VII) N H-25-1313 405 5 08/06/2025 4 24-30-1404 (7)(c)(VIII) N H-25-1313 405 5 08/06/2025 4 24-30-1404 (7)(e) A H-25-1313 405 5 08/06/2025 4 24-30-1404 (7)(f) A H-25-1313 405 5 08/06/2025 4 24-30-1404 (7)(g) R H-25-1313 405 5 08/06/2025 4 24-30-1404 (7)(h) R H-25-1313 405 5 08/06/2025 24-30-2304 (1) A S-25-249 124 1 04/25/2025 24-30-2304 (2) A S-25-249 124 1 04/25/2025 2 24-30-2304 (3) A S-25-317 385 9 06/03/2025 24-30-2304 (4) A S-25-265 130 6 07/01/2025 5 24-31-101 (1)(i)(XXII) A S-25-129 96 6 04/24/2025 3, 4, 5 24-31-101 (1)(i)(XXII) A S-25-001 178 12 08/06/2025 4, 5 24-31-101 (1)(i)(XXII) A S-25-020 264 2 08/06/2025 4, 5 24-31-101 (1)(i)(XXII) A H-25-1329 407 3 08/06/2025 3, 4, 5 24-31-101 (1)(i)(XXIII) A S-25-001 178 12 08/06/2025 4, 5 24-31-101 (1)(i)(XXIII) A H-25-1329 407 3 08/06/2025 24-31-101 (1)(i)(XXIV) N S-25-129 96 6 04/24/2025 146 24-31-101 (1)(i)(XXV) N S-25-129 96 6 04/24/2025 4 24-31-101 (1)(i)(XXV) R S-25-300 428 30 08/06/2025 24-31-101 (1)(i)(XXVI) N S-25-129 96 6 04/24/2025 3, 4 24-31-101 (1)(i)(XXVII) N S-25-001 178 12 08/06/2025 4 24-31-101 (1)(i)(XXVIII) N S-25-020 264 2 08/06/2025 4 24-31-101 (1)(i)(XXIX) N S-25-020 264 2 08/06/2025 4 24-31-101 (1)(i)(XXX) N S-25-020 264 2 08/06/2025 4 24-31-101 (1)(i)(XXXI) A H-25-1329 407 3 08/06/2025 4 24-31-101 (5) N S-25-020 264 2 08/06/2025 4 24-31-115 IP(4)(a) A S-25-020 264 3 08/06/2025 4 24-31-115 (5)(a) A S-25-020 264 3 08/06/2025 4 24-31-115 (6)(b) A S-25-020 264 3 08/06/2025 4 24-31-115 IP(8)(a) A S-25-020 264 3 08/06/2025 4 24-31-115 (8)(a)(III) A S-25-020 264 3 08/06/2025 4 24-31-115 (8)(b) A S-25-020 264 3 08/06/2025 4 24-31-115 (9) A S-25-020 264 3 08/06/2025 4 24-31-301 (5.3) N S-25-275 377 139 08/06/2025 4 24-31-302 (1) A S-25-275 377 140 08/06/2025 116 24-31-303 (1)(r) A H-25-1136 333 1 05/31/2025 4, 116 24-31-303 (1)(r)(IV) R S-25-300 428 31 08/06/2025 24-31-305 (1.7) A H-25-1136 333 5 05/31/2025 24-31-321 N H-25-1136 333 2 05/31/2025 24-31-902 (1)(a)(II)(E) N H-25-1114 34 2 07/01/2025 24-31-904 (1)(a)(II) R H-25-1136 333 3 05/31/2025 24-31-904 (1.5) N H-25-1136 333 3 05/31/2025 24-31-904 (2)(a)(II) R H-25-1136 333 3 05/31/2025 24-31-904 (2.5) N H-25-1136 333 3 05/31/2025 24-31-904 (5) N H-25-1136 333 3 05/31/2025 24-31-904 (6) N H-25-1136 333 3 05/31/2025 24-31-906 (1) A H-25-1031 389 1 06/03/2025 24-31-906 (3) A H-25-1031 389 1 06/03/2025 24-31-906 (4) N H-25-1031 389 1 06/03/2025 24-31-906 (5) N H-25-1031 389 1 06/03/2025 24-31-906 (6) N H-25-1031 389 1 06/03/2025 24-31-906 (7) N H-25-1031 389 1 06/03/2025 24-31-906 (8) N H-25-1031 389 1 06/03/2025 24-31-906 (9) N H-25-1031 389 1 06/03/2025 24-31-906 (10) N H-25-1031 389 1 06/03/2025 24-31-906 (11) N H-25-1031 389 1 06/03/2025 24-31-14 (entire part 14) N S-25-304 414 1 06/03/2025 24-32-119 (1)(a) A S-25-246 103 1 04/24/2025 24-32-119 (6) N S-25-246 103 1 04/24/2025 4 24-32-135 N H-25-1061 435 1 08/06/2025 4 24-32-201.5 N S-25-275 377 141 08/06/2025 4 24-32-202 (1) A S-25-275 377 142 08/06/2025 4 24-32-300.3 N S-25-275 377 143 08/06/2025 4 24-32-301 A S-25-275 377 144 08/06/2025 4 24-32-704 (1) A S-25-300 428 32 08/06/2025 2, 17 24-32-707 (1.5) N H-25-1030 8 5 01/01/2026 24-32-721 (1) A S-25-245 122 1 04/25/2025 2 24-32-721 (3)(a) A S-25-317 385 10 06/03/2025 24-32-721 (3)(b) A S-25-245 122 1 04/25/2025 24-32-721 (3)(b.5) N S-25-245 122 1 04/25/2025 2 24-32-721 (3)(d) N S-25-317 385 10 06/03/2025 24-32-726 (7)(c) N S-25-114 3 1 02/27/2025 24-32-726 (9) N S-25-114 3 1 02/27/2025 24-32-727 (8)(e) N S-25-312 301 11 05/30/2025 24-32-729 (4)(d) N S-25-312 301 9 05/30/2025 24-32-732 (5)(g.5) N S-25-312 301 10 05/30/2025 3, 4 24-32-735 N H-25-1207 224 2 08/06/2025 4 24-32-801.5 N S-25-275 377 145 08/06/2025 4 24-32-802 (1) A S-25-275 377 146 08/06/2025 24-32-1709.5 (4) N S-25-264 129 16 04/25/2025 2 24-32-3207 (4) A S-25-317 385 11 06/03/2025 24-32-3207 (6)(e) N S-25-312 301 8 05/30/2025 2 24-32-3302 IP(17) A S-25-002 172 5 05/08/2025 2 24-32-3304 (1)(f) A S-25-002 172 6 05/08/2025 2 24-32-3304 (1)(g) A S-25-002 172 6 05/08/2025 2 24-32-3304 (1)(h) N S-25-002 172 6 05/08/2025 2 24-32-3305 IP(3)(a) A S-25-002 172 7 05/08/2025 2 24-32-3305 (3)(a)(III) A S-25-002 172 7 05/08/2025 2 24-32-3305 (3)(a)(IV) R S-25-002 172 7 05/08/2025 2 24-32-3305 (3)(a)(V) A S-25-002 172 7 05/08/2025 2 24-32-3305 (3)(a)(VI) A S-25-002 172 7 05/08/2025 2 24-32-3305 (3)(a)(VII) R S-25-002 172 7 05/08/2025 2 24-32-3305 (3)(a)(VIII) A S-25-002 172 7 05/08/2025 2 24-32-3305 (3)(a)(IX) A S-25-002 172 7 05/08/2025 2 24-32-3305 (3)(a)(X) A S-25-002 172 7 05/08/2025 2 24-32-3305 (3)(a)(XII) N S-25-002 172 7 05/08/2025 2 24-32-3305 (3)(a)(XIII) N S-25-002 172 7 05/08/2025 2 24-32-3305 (3)(a)(XIV) N S-25-002 172 7 05/08/2025 2 24-32-3305 (3)(a)(XV) N S-25-002 172 7 05/08/2025 2 24-32-3305 (3)(a)(XVI) N S-25-002 172 7 05/08/2025 2 24-32-3305 (3)(c) N S-25-002 172 7 05/08/2025 2 24-32-3305 (3)(d) N S-25-002 172 7 05/08/2025 2 24-32-3305 (3)(e) N S-25-002 172 7 05/08/2025 2 24-32-3305 (3.3) R S-25-002 172 7 05/08/2025 2 24-32-3305 (4) N S-25-002 172 7 05/08/2025 2 24-32-3309 (1)(b)(II) A S-25-002 172 10 05/08/2025 2 24-32-3309 (1)(b)(III) A S-25-002 172 10 05/08/2025 2 24-32-3309 (1)(b)(IV) N S-25-002 172 10 05/08/2025 2 24-32-3310 A S-25-002 172 11 05/08/2025 2, 34 24-32-3311 (4) A S-25-002 172 12 2 24-32-3311 (6) A S-25-002 172 15 05/08/2025 2, 34 24-32-3311 (7) N S-25-002 172 12 2, 34 24-32-3311 (8) N S-25-002 172 12 05/08/2025 2 24-32-3315 (3) A S-25-002 172 16 05/08/2025 2 24-32-3315 (4) A S-25-002 172 16 05/08/2025 2 24-32-3315 (5) A S-25-002 172 16 05/08/2025 2 24-32-3318 (1) A S-25-002 172 13 05/08/2025 2 24-32-3318 (2)(a) A S-25-002 172 13 05/08/2025 24-32-3501 (7)(e) N S-25-264 129 17 04/25/2025 2, 101 24-32-3709.5 N H-25-1198 396 2 2, 4 24-33-104 IP(1)(e) A H-25-1165 257 30 08/06/2025 2, 4 24-33-104 (1)(e)(IV) A H-25-1165 257 30 08/06/2025 2 24-33-111 (2)(a)(I)(A) A S-25-317 385 12 06/03/2025 2 24-33-111 (2)(f) N S-25-317 385 12 06/03/2025 2 24-33-117 (2) A S-25-317 385 13 06/03/2025 4 24-33.5-102 (5) N S-25-059 69 1 08/06/2025 24-33.5-106 (6) A S-25-264 129 18 04/25/2025 24-33.5-113 (6) N S-25-304 414 3 06/03/2025 24-33.5-113.5 IP(4)(a) A S-25-304 414 4 06/03/2025 24-33.5-115 (1) A H-25-1136 333 4 05/31/2025 4 24-33.5-121 N S-25-042 28 1 08/06/2025 24-33.5-122 N S-25-310 359 4 06/02/2025 4 24-33.5-208 IP(1) A S-25-036 416 1 08/06/2025 4 24-33.5-208 (2) N S-25-036 416 1 08/06/2025 2, 3, 4 24-33.5-231 N S-25-149 266 2 08/06/2025 4 24-33.5-400.3 N S-25-275 377 147 08/06/2025 4 24-33.5-401 (1) A S-25-275 377 148 08/06/2025 4 24-33.5-402 A S-25-275 377 149 08/06/2025 1, 2, 4, 142 24-33.5-424 (3)(b)(III) N S-25-034 340 5 24-33.5-424 (3)(b.3)(XI) A S-25-003 68 5 04/10/2025 24-33.5-424 (3)(b.3)(XII) A S-25-003 68 5 04/10/2025 24-33.5-424 (3)(b.3)(XIII) N S-25-003 68 5 04/10/2025 24-33.5-424.5 N S-25-146 342 2 06/02/2025 1, 2, 4, 142 24-33.5-424.7 N S-25-034 340 3 151 24-33.5-432 N S-25-170 29 1 03/26/2025 24-33.5-432 (4)(c) A S-25-304 414 5 06/03/2025 24-33.5-432 (4)(d) A S-25-304 414 5 06/03/2025 4 24-33.5-501.5 N S-25-275 377 150 08/06/2025 4 24-33.5-502 (1) A S-25-275 377 151 08/06/2025 4 24-33.5-503 (1)(e.5) N S-25-059 69 2 08/06/2025 24-33.5-503 (1)(gg) R S-25-310 359 1 06/02/2025 2 24-33.5-527 (4)(b) A S-25-317 385 14 06/03/2025 2 24-33.5-528 (4)(b) A S-25-317 385 15 06/03/2025 2 24-33.5-528 (4)(e) N S-25-317 385 15 06/03/2025 24-33.5-529 (4)(e) N S-25-264 129 19 04/25/2025 24-33.5-537 R S-25-310 359 2 06/02/2025 24-33.5-538 R S-25-310 359 3 06/02/2025 24-33.5-539 N H-25-1098 347 1 08/06/2025 24-33.5-703 (2) R H-25-1027 65 7 04/10/2025 3, 4 24-33.5-703 (3) A H-25-1010 174 1 08/06/2025 24-33.5-704.5 (1) R H-25-1027 65 3 04/10/2025 24-33.5-704.5 (2) A H-25-1027 65 4 04/10/2025 24-33.5-711.5 (1) A H-25-1027 65 8 04/10/2025 4 24-33.5-719 N S-25-031 147 2 08/06/2025 24-33.5-802 (3.3) N H-25-1181 36 3 03/26/2025 24-33.5-802 (3.5) N H-25-1181 36 3 03/26/2025 4 24-33.5-822 (1) A S-25-300 428 33 08/06/2025 4 24-33.5-822 (5) A S-25-300 428 33 08/06/2025 24-33.5-822 (6) A H-25-1181 36 4 03/26/2025 24-33.5-822.5 N H-25-1181 36 5 03/26/2025 24-33.5-1202 (2.3) A S-25-007 281 2 05/29/2025 2, 17 24-33.5-1203 (1)(p) A H-25-1030 8 4 01/01/2026 2, 17 24-33.5-1203 (1)(p.5) A H-25-1030 8 4 01/01/2026 3, 8 24-33.5-1203 (1)(z) N H-25-1295 214 4 01/01/2026 4 24-33.5-1204 (1) A S-25-300 428 34 08/06/2025 2 24-33.5-1204.5 (3) N S-25-002 172 4 05/08/2025 4 24-33.5-1209 (2) A S-25-300 428 35 08/06/2025 24-33.5-1217 IP(2) A S-25-007 281 3 05/29/2025 24-33.5-1217 (2)(b) A S-25-007 281 3 05/29/2025 24-33.5-1217 (2)(e) A S-25-007 281 3 05/29/2025 24-33.5-1217 (2)(f) A S-25-007 281 3 05/29/2025 24-33.5-1217 (2)(g) N S-25-007 281 3 05/29/2025 24-33.5-1217 (2.5) N S-25-007 281 3 05/29/2025 24-33.5-1217 IP(5)(a) A S-25-007 281 3 05/29/2025 24-33.5-1217 (5)(a)(II)(A) A S-25-007 281 3 05/29/2025 24-33.5-1217 (10) A S-25-007 281 3 05/29/2025 2 24-33.5-1228 (3)(a) A S-25-317 385 16 06/03/2025 2 24-33.5-1228 (3)(a.5) N S-25-317 385 16 06/03/2025 4 24-33.5-1230 (5) N S-25-015 63 1 08/06/2025 24-33.5-1237 (1)(a) A S-25-142 367 1 06/03/2025 24-33.5-1237 (1)(a.3) N S-25-142 367 1 06/03/2025 24-33.5-1237 (1)(c.5) N S-25-142 367 1 06/03/2025 24-33.5-1237 (2) A S-25-142 367 1 06/03/2025 24-33.5-1237 (3) A S-25-142 367 1 06/03/2025 24-33.5-1240 N S-25-007 281 1 05/29/2025 4 24-33.5-1502 (1) A S-25-275 377 152 08/06/2025 4 24-33.5-1502 (2)(a.5) N S-25-275 377 152 08/06/2025 4 24-33.5-1502 (2)(a.7) N S-25-275 377 152 08/06/2025 4 24-33.5-1506 (1) A S-25-275 377 153 08/06/2025 24-33.5-1621 (2)(b) A H-25-1025 30 1 03/26/2025 24-33.5-1621 (3) A H-25-1025 30 1 03/26/2025 24-33.5-1621 (9) N H-25-1025 30 1 03/26/2025 4 24-33.5-1703 R S-25-179 322 5 08/06/2025 4 24-33.5-1704 (2) A S-25-179 322 2 08/06/2025 4 24-33.5-1704 (6) R S-25-179 322 2 08/06/2025 4 24-33.5-1705 R S-25-179 322 5 08/06/2025 4 24-33.5-1706 R S-25-179 322 5 08/06/2025 4 24-33.5-1707 RE S-25-179 322 4 08/06/2025 4 24-33.5-1708 A S-25-179 322 3 08/06/2025 24-33.5-1802 A H-25-1173 67 1 04/10/2025 3, 4 24-33.5-1803 (3)(m) A S-25-288 339 8 08/06/2025 18 24-33.5-1804 R H-25-1173 67 3 04/10/2025 4 24-33.5-2501 (4.2) N S-25-275 377 154 08/06/2025 24-33.5-2502 (2)(e) A S-25-265 130 5 07/01/2025 4 24-33.5-2503 (1) A S-25-275 377 155 08/06/2025 24-33.5-2510 (3)(a)(IV) N S-25-256 107 2 04/24/2025 2, 4 24-33.5-2702 (2)(g) A S-25-027 363 3 08/06/2025 2, 4 24-33.5-2702 (2)(g.5) N S-25-027 363 3 08/06/2025 12 24-33.5-2705 N H-25-1173 67 2 04/10/2025 2, 4 24-33.5-2706 N S-25-027 363 2 08/06/2025 24-33.5-28 (entire part 28) N H-25-1146 358 8 07/01/2025 4 24-34-104 (26)(a)(I) R S-25-194 171 26 08/06/2025 4 24-34-104 (26)(a)(II) R S-25-186 285 2 08/06/2025 4 24-34-104 (26)(a)(III) R S-25-174 310 2 08/06/2025 4 24-34-104 (26)(a)(IV) R S-25-195 243 1 08/06/2025 4 24-34-104 (26)(a)(V) R S-25-179 322 1 08/06/2025 4 24-34-104 (26)(a)(VI) R S-25-179 322 1 08/06/2025 4 24-34-104 (26)(a)(VII) R S-25-192 324 1 08/06/2025 4 24-34-104 (26)(a)(VIII) R S-25-193 371 3 08/06/2025 24-34-104 (26)(a)(IX) R S-25-184 242 1 05/24/2025 4 24-34-104 (26)(a)(XI) R S-25-176 218 1 08/06/2025 4 24-34-104 (26)(a)(XII) R S-25-187 343 1 08/06/2025 24-34-104 (31)(a)(XIV) N S-25-184 242 1 05/24/2025 4 24-34-104 (31)(a)(XV) N S-25-195 243 1 08/06/2025 4 24-34-104 (31)(a)(XVI) N S-25-187 343 1 08/06/2025 24-34-104 (32)(a)(XII) R H-25-1154 230 25 05/22/2025 4 24-34-104 (33)(a)(X) N S-25-176 218 1 08/06/2025 4 24-34-104 (34)(a)(III) A H-25-1075 163 8 08/06/2025 4 24-34-104 (35)(a)(VI) N S-25-174 310 2 08/06/2025 4 24-34-104 (35)(a)(VII) N S-25-192 324 1 08/06/2025 4 24-34-104 (35)(a)(VIII) N S-25-194 171 26 08/06/2025 4, 98 24-34-104 (37) N S-25-179 322 1 08/06/2025 4, 98 24-34-104 (37) N S-25-186 285 2 08/06/2025 1 24-34-300.5 N H-25-1312 205 9 05/16/2025 1 24-34-300.7 N H-25-1312 205 9 05/16/2025 1 24-34-301 (3.5) N H-25-1312 205 8 05/16/2025 1 24-34-301 (9) A H-25-1312 205 8 05/16/2025 2, 3 24-34-502 (1)(p) A H-25-1240 291 4 05/29/2025 2, 3 24-34-502 (1)(q) A H-25-1240 291 4 05/29/2025 2, 3 24-34-502 (1)(r) N H-25-1240 291 4 05/29/2025 2, 3 24-34-505.6 IP(6) A H-25-1240 291 5 05/29/2025 2, 3 24-34-505.6 (6)(a) A H-25-1240 291 5 05/29/2025 2, 3 24-34-505.6 (8) N H-25-1240 291 5 05/29/2025 2, 3 24-34-508 (1)(f) A H-25-1240 291 6 05/29/2025 4, 55 24-34-600.3 N S-25-275 377 156 08/06/2025 4, 179 24-34-601 (1) R S-25-275 377 336 08/06/2025 2, 4 24-34-601 (2)(b) R H-25-1239 232 2 08/06/2025 2, 4 24-34-601 (2.5) A H-25-1239 232 2 08/06/2025 2, 4 24-34-602 (1) A H-25-1239 232 3 08/06/2025 2, 4 24-34-602 (4) N H-25-1239 232 3 08/06/2025 2, 4 24-34-707 A H-25-1239 232 4 08/06/2025 4 24-34-802 (1)(b) A S-25-275 377 157 08/06/2025 2, 4 24-34-802 IP(2)(a) A H-25-1239 232 5 08/06/2025 2, 4 24-34-802 (2)(c) R H-25-1239 232 5 08/06/2025 2, 4 24-34-802 (2)(d) R H-25-1239 232 5 08/06/2025 2, 4 24-34-802 (4) R H-25-1239 232 5 08/06/2025 2, 4 24-34-804 (3)(a)(I) A H-25-1239 232 6 08/06/2025 2, 4 24-34-806 (3)(a)(II) A H-25-1239 232 7 08/06/2025 2, 4 24-34-806 (3)(a)(III) R H-25-1239 232 7 08/06/2025 2, 4 24-34-806 (4)(a) A H-25-1239 232 7 08/06/2025 24-35-122 N S-25-003 68 7 04/10/2025 4, 56 24-36-100.3 N S-25-275 377 158 08/06/2025 4, 180 24-36-104 (1.5) R S-25-275 377 336 08/06/2025 2 24-36-113 (8) N S-25-006 192 2 05/15/2025 4 24-36-121 (7) A S-25-081 320 1 08/06/2025 4 24-36-121.5 (4) N S-25-081 320 2 08/06/2025 24-36-306 (5) N S-25-260 127 1 04/25/2025 24-36-307 N S-25-260 127 2 04/25/2025 4 24-37-304 (1)(c.3)(III) A H-25-1313 405 6 08/06/2025 24-37.5-120 (7) N S-25-264 129 20 04/25/2025 4 24-37.5-125 IP(7)(b)(I) A H-25-1308 253 1 08/06/2025 4 24-37.5-903 (2)(b) A S-25-031 147 1 08/06/2025 2 24-38.5-102.4 (1)(a)(I) A S-25-317 385 17 06/03/2025 24-38.5-102.4 (1)(a)(IV) N S-25-264 129 21 04/25/2025 2 24-38.5-102.4 (5) N S-25-317 385 17 06/03/2025 2 24-38.5-102.5 (1)(a) A S-25-317 385 18 06/03/2025 24-38.5-102.5 (3) N S-25-264 129 22 04/25/2025 3 24-38.5-102.6 IP(1) A H-25-1269 216 7 05/20/2025 3 24-38.5-102.6 (1)(a) A H-25-1269 216 7 05/20/2025 4 24-38.5-103 (1)(a)(I)(B) A H-25-1267 252 3 08/06/2025 4 24-38.5-103 (1)(a)(I)(D) N H-25-1267 252 3 08/06/2025 4 24-38.5-103 (1)(a)(I)(E) N H-25-1267 252 3 08/06/2025 3 24-38.5-112 (1)(a)(III) A H-25-1269 216 8 05/20/2025 3 24-38.5-112 (1)(a)(IV) A H-25-1269 216 8 05/20/2025 2 24-38.5-115 (7)(b) A S-25-317 385 19 06/03/2025 2 24-38.5-116 (6)(b)(I) A S-25-317 385 20 06/03/2025 2 24-38.5-116 (6)(d) N S-25-317 385 20 06/03/2025 2 24-38.5-117 (2) A S-25-317 385 21 06/03/2025 24-38.5-117 (5) N S-25-264 129 23 04/25/2025 2 24-38.5-118 (7)(a)(II) A S-25-317 385 22 06/03/2025 4 24-38.5-119 (2)(b) A H-25-1096 269 1 08/06/2025 4 24-38.5-119 (3)(b) A H-25-1096 269 1 08/06/2025 4 24-38.5-119 (3)(c) A H-25-1096 269 1 08/06/2025 4 24-38.5-119 (4) A H-25-1096 269 1 08/06/2025 2 24-38.5-119 (7)(b) A S-25-317 385 23 06/03/2025 2 24-38.5-119 (7)(c) N S-25-317 385 23 06/03/2025 24-38.5-120 (3.5) N S-25-307 382 1 06/03/2025 24-38.5-121 (5) A S-25-037 364 7 06/03/2025 4 24-38.5-123 N S-25-055 215 2 08/06/2025 24-38.5-124 N S-25-161 186 8 05/13/2025 3 24-38.5-125 N H-25-1269 216 4 05/20/2025 4 24-38.5-303 (7)(c)(II) A H-25-1267 252 4 08/06/2025 4 24-38.5-303 (7)(c)(III) N H-25-1267 252 4 08/06/2025 3 24-38.5-403 (4) N H-25-1269 216 6 05/20/2025 2 24-38.5-406 (1) A S-25-317 385 24 06/03/2025 2 24-38.5-406 (4) N S-25-317 385 24 06/03/2025 2 24-38.5-506 (2)(a) A S-25-317 385 25 06/03/2025 24-38.5-506 (4) N S-25-264 129 24 04/25/2025 2 24-38.5-506 (5) N S-25-317 385 25 06/03/2025 4 24-38.8-101.5 N S-25-275 377 159 08/06/2025 4 24-38.8-102 IP(1) A S-25-275 377 160 08/06/2025 4 24-38.8-103 IP(1) A S-25-275 377 161 08/06/2025 4 24-44-101.5 N S-25-275 377 162 08/06/2025 4 24-44-102 A S-25-275 377 163 08/06/2025 4 24-46-101.5 N S-25-275 377 164 08/06/2025 4 24-46-102 (1) A S-25-275 377 165 08/06/2025 4 24-46-105 (1)(a) A S-25-275 377 166 08/06/2025 2 24-46-105 (2) A S-25-317 385 26 06/03/2025 4 24-46.3-100.3 N S-25-275 377 167 08/06/2025 4 24-46.3-101 (1) A S-25-275 377 168 08/06/2025 4 24-46.3-104 (2)(f) A S-25-300 428 36 08/06/2025 24-46.3-602 (4) A S-25-315 237 21 07/01/2026 24-46.3-604 (1) A S-25-312 301 15 05/30/2025 4 24-47.5-100.3 N S-25-275 377 169 08/06/2025 4 24-47.5-101 (2) A S-25-275 377 170 08/06/2025 4 24-47.5-102 (1.5) A S-25-275 377 171 08/06/2025 4 24-48.5-112 (1)(c) R H-25-1157 213 1 08/06/2025 4 24-48.5-112 IP(1)(e) A H-25-1157 213 1 08/06/2025 4 24-48.5-112 (1)(e)(I) A H-25-1157 213 1 08/06/2025 4 24-48.5-112 (1)(e)(III) R H-25-1157 213 1 08/06/2025 4 24-48.5-112 (1)(e)(IV) R H-25-1157 213 1 08/06/2025 4 24-48.5-112 (1)(f) A H-25-1157 213 1 08/06/2025 4 24-48.5-112 (1)(g)(I) A H-25-1157 213 1 08/06/2025 4 24-48.5-112 (1.5)(b) NC H-25-1157 213 1 08/06/2025 4 24-48.5-112 (2)(a) A H-25-1157 213 1 08/06/2025 4 24-48.5-112 (2)(b) A H-25-1157 213 1 08/06/2025 4 24-48.5-112 (2)(c) A H-25-1157 213 1 08/06/2025 4 24-48.5-112 (2)(d) A H-25-1157 213 1 08/06/2025 4 24-48.5-112 (3)(b) A H-25-1157 213 1 08/06/2025 4 24-48.5-116 (5)(b) A H-25-1005 62 1 08/06/2025 2 24-48.5-116 (5)(c) A S-25-317 385 27 06/03/2025 2 24-48.5-116 (5)(d) N S-25-317 385 27 06/03/2025 2 24-48.5-117 (7)(d) A S-25-317 385 28 06/03/2025 2 24-48.5-117 (7)(d.5) N S-25-317 385 28 06/03/2025 24-48.5-117 (7)(f) N S-25-264 129 25 04/25/2025 2 24-48.5-121 (8)(c) A S-25-317 385 29 06/03/2025 2 24-48.5-121 (8)(e) N S-25-317 385 29 06/03/2025 24-48.5-122 R S-25-224 117 1 04/25/2025 3 24-48.5-128 (4)(b) A H-25-1209 398 19 06/03/2025 2 24-48.5-129 (4) N H-25-1215 312 5 05/30/2025 2 24-48.5-129 (5) N H-25-1215 312 5 05/30/2025 2 24-48.5-131 (9)(b) A S-25-317 385 30 06/03/2025 2 24-48.5-132 (5)(c) A S-25-317 385 31 06/03/2025 24-48.5-132 (5)(f) N S-25-264 129 26 04/25/2025 4, 57 24-48.5-300.3 N S-25-275 377 172 08/06/2025 4 24-48.5-301 (1) A S-25-275 377 173 08/06/2025 4, 181 24-48.5-301 (3) R S-25-275 377 336 08/06/2025 4 24-48.5-303 (1) A S-25-275 377 174 08/06/2025 4 24-48.5-312 (3)(a)(III)(H) A H-25-1313 405 7 08/06/2025 2 24-48.5-317 (6)(b) A S-25-317 385 32 06/03/2025 2 24-48.5-317 (6)(c) N S-25-317 385 32 06/03/2025 24-48.5-502 (3)(b.5) N S-25-264 129 27 04/25/2025 2, 4 24-48.5-502 (3)(c) A H-25-1186 318 5 08/06/2025 2, 4 24-48.5-502 (3)(d) A H-25-1186 318 5 08/06/2025 2, 4 24-48.5-502 (3)(f) A H-25-1186 318 5 08/06/2025 2, 4 24-48.5-506 A H-25-1186 318 6 08/06/2025 2 24-48.5-608 (2) A S-25-317 385 33 06/03/2025 4 24-49.5-101.5 N S-25-275 377 175 08/06/2025 4 24-49.5-102 A S-25-275 377 176 08/06/2025 4 24-49.9-100.3 N S-25-275 377 177 08/06/2025 4 24-49.9-101 (2) A S-25-275 377 178 08/06/2025 4 24-49.9-101 (3)(a) A S-25-275 377 178 08/06/2025 4 24-50-101.5 N S-25-275 377 179 08/06/2025 4 24-50-103 (1) A S-25-275 377 180 08/06/2025 24-50-104 (1)(j)(III)(A) A S-25-264 129 28 04/25/2025 24-50-104 (1)(j)(III)(H) N S-25-264 129 28 04/25/2025 24-50-104 (1)(j)(III.5) N S-25-264 129 28 04/25/2025 24-50-104 (1)(j)(VII) N S-25-264 129 28 04/25/2025 2 24-50-122 (3) N H-25-1215 312 6 05/30/2025 131 24-50-609 (5) A S-25-264 129 29 04/25/2025 2, 131 24-50-609 (5) A S-25-317 385 34 06/03/2025 24-51-203 (2) A S-25-147 369 2 06/03/2025 24-51-203 (3) A S-25-147 369 2 06/03/2025 24-51-203 (4) A S-25-147 369 2 06/03/2025 24-51-203 (5) A S-25-147 369 2 06/03/2025 24-51-204 (2) A S-25-147 369 3 06/03/2025 24-51-204 (12) N S-25-028 27 1 03/26/2025 24-51-204 (13) N S-25-147 369 3 06/03/2025 24-51-205 IP(6)(a) A S-25-147 369 4 06/03/2025 24-51-205 (6)(b) A S-25-147 369 4 06/03/2025 24-51-208 IP(1) A H-25-1105 238 2 07/01/2025 24-51-208 (1)(f.5) A H-25-1105 238 2 07/01/2025 24-51-401 (1.7)(a)(V) N H-25-1105 238 1 07/01/2025 24-51-413 (1)(a) A H-25-1105 238 4 07/01/2025 24-51-413 (1)(b) A H-25-1105 238 4 07/01/2025 24-51-413 (3)(b) A H-25-1105 238 4 07/01/2025 24-51-413 (6)(b) A H-25-1105 238 4 07/01/2025 24-51-414 (1)(a) A S-25-310 359 5 06/02/2025 147 24-51-414 (4) A H-25-1105 238 3 07/01/2025 147 24-51-414 (4) A S-25-310 359 5 06/02/2025 24-51-414 (8.5) N S-25-310 359 5 06/02/2025 4 24-51-415 A S-25-275 377 183 08/06/2025 4 24-51-1101 (1.9)(a)(I) A H-25-1307 443 4 08/06/2025 4 24-51-1101 (1.9)(a)(II)(B) A H-25-1307 443 4 08/06/2025 4 24-51-1101 (1.9)(a)(II)(C) A H-25-1307 443 4 08/06/2025 4, 58 24-51-1500.3 N S-25-275 377 181 08/06/2025 4, 182 24-51-1501 (4) R S-25-275 377 336 08/06/2025 4 24-51-1502 (1) A S-25-275 377 182 08/06/2025 4, 183 24-51-1502 (2)(a) R S-25-275 377 336 08/06/2025 4 24-51-1600.3 N S-25-275 377 184 08/06/2025 4 24-51-1601 (2) A S-25-275 377 185 08/06/2025 24-51.1-101 IP(4)(a) A S-25-028 27 2 03/26/2025 24-51.1-101 (4)(a)(I) A S-25-028 27 2 03/26/2025 24-51.1-101 (4)(h) A S-25-028 27 2 03/26/2025 24-51.1-101 (7) N S-25-199 149 8 04/30/2025 4, 60 24-54-100.3 N S-25-275 377 186 08/06/2025 4, 123 24-54-101 (2.7) R S-25-275 377 336 08/06/2025 15 24-60-1804 A H-25-1086 60 1 04/07/2025 1, 2, 4 24-60-50 (entire part 50) N S-25-054 200 19 08/06/2025 4, 61 24-68-102 (1.3) N S-25-275 377 187 08/06/2025 4, 184 24-68-106 (1) R S-25-275 377 336 08/06/2025 3, 4 24-72-204 (2)(a)(VI) R S-25-001 178 13 08/06/2025 4 24-72-204 (3)(a)(X.5) A H-25-1333 409 2 08/06/2025 2, 4 24-72-204 (3)(a)(XXIV) N S-25-038 19 2 08/06/2025 24-72-204 (3)(a)(XXV) N H-25-1041 38 2 03/28/2025 3, 4 24-72-204 (3)(a)(XXVI) N S-25-001 178 13 08/06/2025 4 24-72-204 IP(3.5)(a) A H-25-1195 350 1 08/06/2025 4 24-72-204 (3.5)(b)(I) A H-25-1195 350 1 08/06/2025 4 24-72-204 (3.5)(b)(II) A H-25-1195 350 1 08/06/2025 4 24-72-204 (3.5)(b)(III) A H-25-1195 350 1 08/06/2025 4 24-72-204 (3.5)(b)(V) R H-25-1195 350 1 08/06/2025 4 24-72-204 IP(3.5)(c) A H-25-1195 350 1 08/06/2025 4 24-72-204 (3.5)(e) A H-25-1195 350 1 08/06/2025 4 24-72-204 (3.5)(h) N H-25-1195 350 1 08/06/2025 3 24-72-303 (4)(a.5) N H-25-1275 352 3 06/02/2025 3 24-72-303 (4)(g) A H-25-1275 352 3 06/02/2025 2 24-74-101 (1)(a) A S-25-276 240 6 05/23/2025 2 24-74-101 (1)(b) A S-25-276 240 6 05/23/2025 2 24-74-101 (1)(d) A S-25-276 240 6 05/23/2025 2 24-74-101 (1)(e) A S-25-276 240 6 05/23/2025 2 24-74-101 (2) A S-25-276 240 6 05/23/2025 2 24-74-102 (1.5) N S-25-276 240 7 05/23/2025 2 24-74-102 (1.6) N S-25-276 240 7 05/23/2025 2 24-74-102 (1.8) N S-25-276 240 7 05/23/2025 2 24-74-102 (3) A S-25-276 240 7 05/23/2025 2 24-74-102 (4) A S-25-276 240 7 05/23/2025 2 24-74-102 (5) A S-25-276 240 7 05/23/2025 2 24-74-103 A S-25-276 240 8 05/23/2025 2 24-74-104 (1) A S-25-276 240 9 05/23/2025 2 24-74-104 IP(2) A S-25-276 240 9 05/23/2025 2 24-74-104 (3) A S-25-276 240 9 05/23/2025 2 24-74-105 (2) A S-25-276 240 10 05/23/2025 2 24-74-106 R S-25-276 240 11 05/23/2025 144 24-74-107 A S-25-129 96 11 04/24/2025 2, 144 24-74-107 A S-25-276 240 12 05/23/2025 2 24-74.1- (entire article 74.1) N S-25-276 240 13 05/23/2025 24-75-105 (2) A S-25-263 128 1 04/25/2025 24-75-106 (2) A S-25-263 128 2 04/25/2025 24-75-106.5 (5) A S-25-263 128 3 04/25/2025 24-75-107 (2) A S-25-263 128 4 04/25/2025 24-75-108 (1) A S-25-263 128 5 04/25/2025 24-75-108 IP(2) A S-25-263 128 5 04/25/2025 24-75-108 (2)(h) N S-25-263 128 5 04/25/2025 24-75-108 (11) A S-25-263 128 5 04/25/2025 24-75-109 (1)(a.9) N S-25-183 97 6 01/01/2026 24-75-109 (1)(e.5) N S-25-291 379 2 07/01/2025 2 24-75-109 (1)(f) A S-25-214 372 6 06/03/2025 2 24-75-109 (5) A S-25-214 372 6 07/01/2025 24-75-109 (6) A S-25-263 128 6 04/25/2025 24-75-110 (2) A S-25-263 128 7 04/25/2025 24-75-114 R S-25-267 131 1 04/25/2025 4 24-75-201.1 (1)(d)(XXIII)(B) A S-25-300 428 37 08/06/2025 24-75-201.1 (5) N S-25-310 359 6 06/02/2025 24-75-201.5 (1)(h) N S-25-310 359 7 06/02/2025 24-75-219 (7)(c)(II) R S-25-257 423 1 06/04/2025 24-75-219 (7)(d) A S-25-257 423 1 06/04/2025 24-75-219 (7)(e) A S-25-257 423 1 06/04/2025 24-75-219 (7)(k) N S-25-312 301 6 05/30/2025 24-75-224.5 N S-25-264 129 30 04/25/2025 24-75-226 (3.6) N S-25-312 301 1 05/30/2025 24-75-226 (4.3)(a) A S-25-312 301 1 05/30/2025 24-75-226.5 (2)(c) A S-25-312 301 2 05/30/2025 24-75-227 (3.8) N S-25-312 301 3 05/30/2025 24-75-228 (3.8) N S-25-312 301 4 05/30/2025 24-75-229 (3)(e) N S-25-264 129 31 04/25/2025 24-75-230 (2)(a) A S-25-295 330 1 05/31/2025 24-75-230 (3)(b) R S-25-295 330 1 05/31/2025 24-75-230 (3.5) R S-25-295 330 1 05/31/2025 24-75-230 (3.7) R S-25-295 330 1 05/31/2025 24-75-230 (3.8) N S-25-295 330 1 05/31/2025 24-75-230 (4.3) N S-25-312 301 5 05/30/2025 24-75-230 (5) A S-25-295 330 1 05/31/2025 2, 4 24-75-232 (1)(d) A H-25-1245 400 8 08/06/2025 2, 4 24-75-232 (1)(d.5) N H-25-1245 400 8 08/06/2025 2, 4 24-75-232 (2)(d) A H-25-1245 400 8 08/06/2025 24-75-232 (4)(a)(III) N S-25-269 146 1 04/28/2025 24-75-232 (4)(d) N H-25-1321 206 1 05/16/2025 2, 4 24-75-232 IP(5)(a) A H-25-1245 400 8 08/06/2025 24-75-232 (5)(e) N H-25-1321 206 1 05/16/2025 2, 4 24-75-232 (7.5) N H-25-1245 400 8 08/06/2025 24-75-232 (8) A H-25-1321 206 1 05/16/2025 24-75-302 (1)(a) A S-25-262 373 1 06/03/2025 24-75-302 (1)(c) N S-25-262 373 1 06/03/2025 2 24-75-302 (1)(c)(III) N S-25-317 385 35 06/03/2025 24-75-302 (2)(tt) A S-25-262 373 1 06/03/2025 24-75-302 (2)(uu) A S-25-262 373 1 06/03/2025 24-75-302 (2)(vv) N S-25-262 373 1 06/03/2025 24-75-302 (2.3)(o) A S-25-262 373 1 06/03/2025 24-75-302 (2.3)(p) A S-25-262 373 1 06/03/2025 24-75-302 (2.3)(q) N S-25-262 373 1 06/03/2025 24-75-302 (2.5)(r) A S-25-262 373 1 06/03/2025 24-75-302 (2.5)(s) A S-25-262 373 1 06/03/2025 24-75-302 (2.5)(t) N S-25-262 373 1 06/03/2025 24-75-302 (3.7)(a) A S-25-262 373 1 06/03/2025 24-75-302 (3.7)(a.5) N S-25-262 373 1 06/03/2025 2 24-75-302 (3.7)(a.5)(III) N S-25-317 385 35 06/03/2025 24-75-302 (13) A S-25-262 373 1 06/03/2025 4 24-75-303 (5)(a)(II) A H-25-1313 405 8 08/06/2025 5 24-75-402 (5)(jjj) A S-25-308 299 4 05/30/2025 2 24-75-402 (5)(lll) N S-25-002 172 14 05/08/2025 24-75-402 (5)(mmm) N S-25-308 299 4 05/30/2025 24-75-402 (5)(nnn) N S-25-308 299 4 05/30/2025 24-75-404 N S-25-311 383 1 06/03/2025 24-75-601.1 (5) N S-25-037 364 5 06/03/2025 2, 4 24-75-1104.5 (1.7)(e) A S-25-197 256 9 08/06/2025 2, 4, 9 24-75-1104.5 (3) A S-25-197 256 9 08/06/2025 2 24-75-1401 (2) A S-25-317 385 36 06/03/2025 4, 62 24-76-100.3 N S-25-275 377 188 08/06/2025 4, 185 24-76-101 (2) R S-25-275 377 336 08/06/2025 2 24-76.6-101 (1) A S-25-276 240 14 05/23/2025 2 24-76.6-101 (1.5) N S-25-276 240 14 05/23/2025 2 24-76.6-101 (2.3) N S-25-276 240 14 05/23/2025 2 24-76.6-101 (2.7) N S-25-276 240 14 05/23/2025 2 24-76.6-101 (3) A S-25-276 240 14 05/23/2025 2 24-76.6-102 (1)(b) A S-25-276 240 15 05/23/2025 2 24-76.6-102 (2) A S-25-276 240 15 05/23/2025 2 24-76.6-102 (2.5) N S-25-276 240 15 05/23/2025 2 24-76.6-103 (1) A S-25-276 240 16 05/23/2025 2, 154 24-77-102 (2) A S-25-173 422 2 06/04/2025 153 24-77-102 (2)(b)(IV) A S-25-321 387 9 06/04/2025 2 24-77-102 (11) A S-25-173 422 2 06/04/2025 4 24-77-102 (15)(b)(XX) A S-25-081 320 4 08/06/2025 4 24-77-102 (15)(b)(XXI) A S-25-081 320 4 08/06/2025 4 24-77-102 (15)(b)(XXII) N S-25-081 320 4 08/06/2025 24-77-103 (2)(a)(IV) N S-25-180 41 1 03/31/2025 24-77-103 (2)(b)(I) A S-25-180 41 1 03/31/2025 24-77-103 (2)(b)(I.5) N S-25-180 41 1 03/31/2025 24-77-103 (2)(b)(II) A S-25-180 41 1 03/31/2025 24-77-103 (2)(b)(II.5)(B) A S-25-180 41 1 03/31/2025 24-77-103 (2)(b)(II.5)(C) A S-25-180 41 1 03/31/2025 2 24-77-104 (6)(a) A S-25-317 385 37 06/03/2025 2 24-77-104 (6)(a.5) N S-25-317 385 37 06/03/2025 4 24-80-200.3 N S-25-275 377 189 08/06/2025 4 24-80-201.5 (1) A S-25-275 377 190 08/06/2025 4 24-80-201.7 (1) A S-25-275 377 191 08/06/2025 4 24-80-216 (1)(b) A S-25-300 428 38 08/06/2025 4 24-80-216 (1)(c) A S-25-300 428 38 08/06/2025 4 24-80-216 (2)(b)(IV) A S-25-300 428 38 08/06/2025 4 24-80-216 (6) A S-25-300 428 38 08/06/2025 4, 63 24-80-400.3 N S-25-275 377 192 08/06/2025 4, 176 24-80-401 (2) R S-25-275 377 336 08/06/2025 4 24-80-402 A S-25-275 377 193 08/06/2025 2, 4 24-80-916 N H-25-1091 40 2 08/06/2025 4 24-82-108 (3)(h)(I) A S-25-287 378 1 08/06/2025 4 24-82-108 (3)(h)(III) A S-25-287 378 1 08/06/2025 4 24-82-108 (3.5)(c) A S-25-287 378 1 08/06/2025 4 24-82-400.3 N S-25-275 377 194 08/06/2025 4 24-82-402 A S-25-275 377 195 08/06/2025 4 24-83-101.5 N S-25-275 377 196 08/06/2025 4 24-83-102 (2) A S-25-275 377 197 08/06/2025 3, 4 24-85-104 (5) N H-25-1152 246 2 08/06/2025 24-90-105.5 (5) A H-25-1154 230 13 05/22/2025 92 24-92-115 IP(1)(a) A H-25-1130 393 2 07/01/2027 92 24-92-115.5 N H-25-1130 393 1 07/01/2027 3, 92 24-93-111 N H-25-1039 197 2 07/01/2027 2, 4 24-94-102 (4.3) N H-25-1245 400 7 08/06/2025 2, 4 24-94-102 (4.7) N H-25-1245 400 7 08/06/2025 2 24-102-202.5 (2)(a) A S-25-317 385 38 06/03/2025 2 24-102-202.5 (2)(c) N S-25-317 385 38 06/03/2025 8 24-103-906 (1)(a) A S-25-158 294 1 01/01/2026 8 24-103-907.5 N S-25-158 294 2 01/01/2026 24-116-101 A S-25-129 96 7 04/24/2025 24-116-102 (1) A S-25-129 96 8 04/24/2025 24-116-102 (2) A S-25-129 96 8 04/24/2025 24-116-103 N S-25-129 96 9 04/24/2025 4 24-117- (entire article 117) N S-25-081 320 3 08/06/2025 TITLE 25 Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date 4 25-1-100.3 N S-25-275 377 198 08/06/2025 4 25-1-102 (1) A S-25-275 377 199 08/06/2025 4 25-1-103 IP(1)(a) A S-25-275 377 200 08/06/2025 25-1-105 (4) N H-25-1027 65 1 04/10/2025 25-1-108 (1)(i) N H-25-1027 65 2 04/10/2025 4 25-1-108 (6) N S-25-164 168 2 08/06/2025 4 25-1-134 (2)(b) A S-25-055 215 1 08/06/2025 4 25-1-134 IP(2)(c) A S-25-055 215 1 08/06/2025 4 25-1-134 (2)(c)(I) A S-25-055 215 1 08/06/2025 4 25-1-134 (2)(c)(III) A S-25-055 215 1 08/06/2025 4 25-1-134 (2)(c)(III.5) N S-25-055 215 1 08/06/2025 4 25-1-134 (2)(d)(I) A S-25-055 215 1 08/06/2025 4 25-1-134 (2)(d)(III) N S-25-055 215 1 08/06/2025 4 25-1-134 (2)(d.5) N S-25-055 215 1 08/06/2025 4 25-1-502 (2.3) N S-25-275 377 202 08/06/2025 4 25-1-508 (1) A S-25-275 377 203 08/06/2025 4, 64 25-1-800.3 N S-25-275 377 204 08/06/2025 3, 4 25-1-801 (4) A H-25-1024 59 5 08/06/2025 4, 187 25-1-801 (5) R S-25-275 377 336 08/06/2025 3, 4 25-1-802 (5) A H-25-1024 59 6 08/06/2025 4 25-1-13 (entire part 13) R S-25-202 325 1 08/06/2025 4 25-1.5-100.3 N S-25-275 377 201 08/06/2025 25-1.5-102 (1)(b)(I) A H-25-1027 65 9 04/10/2025 25-1.5-102 (1)(e) R S-25-312 301 19 05/30/2025 2 25-1.5-106 (16)(a) A H-25-1296 202 2 05/16/2025 4 25-1.5-115 (5)(a) A S-25-164 168 5 08/06/2025 4 25-1.5-115.1 N S-25-164 168 4 08/06/2025 25-1.5-120.5 N S-25-297 381 1 06/03/2025 4, 65 25-1.5-201 A S-25-275 377 205 08/06/2025 4 , 188 25-1.5-202 (1) R S-25-275 377 336 08/06/2025 4 25-1.5-208 (1)(a) A S-25-275 377 206 08/06/2025 4 25-1.5-208 (1)(b) A S-25-203 326 1 08/06/2025 3 25-2-102 (1.5) N H-25-1109 73 1 04/17/2025 3 25-2-102 (2.6) N H-25-1109 73 1 04/17/2025 4 25-2-102 (4.3) N S-25-275 377 208 08/06/2025 4 25-2-103 (1) A S-25-275 377 209 08/06/2025 25-2-108.5 N S-25-129 96 10 04/24/2025 4 25-2-110 (1)(b)(I) A H-25-1082 436 1 08/06/2025 4 25-2-110 (1)(b)(III) A H-25-1082 436 1 08/06/2025 3 25-2-110 (1)(c) A H-25-1109 73 2 04/17/2025 3 25-2-110 (1)(e) N H-25-1109 73 2 04/17/2025 3 25-2-110 (1)(f) N H-25-1109 73 2 04/17/2025 4 25-2-110 (1)(g) N H-25-1082 436 1 08/06/2025 4 25-2-110 (3)(a) A H-25-1082 436 1 08/06/2025 4 25-2-110 IP(3)(a.5)(I) A H-25-1082 436 1 08/06/2025 4 25-2-110 (3)(a.5)(I)(B) A H-25-1082 436 1 08/06/2025 4 25-2-110 (3)(a.5)(I)(C) A H-25-1082 436 1 08/06/2025 4 25-2-110 (3)(a.5)(II) A H-25-1082 436 1 08/06/2025 4 25-2-110 (4) A H-25-1082 436 1 08/06/2025 4 25-2-110 (4.5) A H-25-1082 436 1 08/06/2025 4 25-2-110 (6) A H-25-1082 436 1 08/06/2025 4 25-2-110 (12) N H-25-1082 436 1 08/06/2025 4 25-2-111 (1) A H-25-1082 436 2 08/06/2025 4 25-2-112 (8) A S-25-300 428 39 08/06/2025 1 25-2-113.8 (5) R H-25-1312 205 10 05/16/2025 3 25-2-113.9 N H-25-1109 73 3 04/17/2025 3 25-2-115 (1) A H-25-1109 73 4 04/17/2025 25-2-121 (5) N S-25-264 129 32 04/25/2025 25-3-108 (7) A S-25-270 151 8 05/01/2025 4 25-3-132 N H-25-1223 439 1 08/06/2025 25-3-133 N S-25-130 190 1 05/14/2025 4 25-3-134 N S-25-071 313 3 08/06/2025 4 25-3-302 (1) A H-25-1085 78 1 08/06/2025 4 25-3-303 IP(1) A H-25-1085 78 2 08/06/2025 4 25-3-304 (2)(b) A H-25-1085 78 3 08/06/2025 4 25-3-304.5 A S-25-078 56 2 08/06/2025 25-3-603 (1) A H-25-1027 65 19 04/10/2025 4 25-3.5-103 (4.7) N S-25-275 377 210 08/06/2025 4 25-3.5-104 (1)(a) A S-25-275 377 211 08/06/2025 4 25-3.5-108 (1)(b)(II)(D) A S-25-192 324 7 08/06/2025 25-3.5-203 (4)(a) A S-25-146 342 7 06/02/2025 25-3.5-203 (4)(g) A S-25-146 342 7 06/02/2025 25-3.5-317 (3)(a)(III) N S-25-146 342 8 06/02/2025 25-3.5-317 (7) N S-25-146 342 8 06/02/2025 2 25-3.5-603 (1)(c) A S-25-317 385 39 06/03/2025 2 25-3.5-603 (1)(d) N S-25-317 385 39 06/03/2025 4 25-3.5-803 (4.5) N S-25-275 377 212 08/06/2025 2, 4 25-3.5-804 (3)(a) A S-25-197 256 10 08/06/2025 4 25-3.5-804 (5)(a) A S-25-275 377 213 08/06/2025 4 25-3.5-1301 (1) A S-25-192 324 3 08/06/2025 4 25-3.5-1301 (1.5) N S-25-192 324 3 08/06/2025 4 25-3.5-1303 IP(1) A S-25-192 324 4 08/06/2025 4 25-3.5-1305 (2)(a) A S-25-192 324 5 08/06/2025 4 25-3.5-1305 (3)(a)(I) A S-25-192 324 5 08/06/2025 25-3.5-1305 (3)(a)(III) A S-25-146 342 9 06/02/2025 25-3.5-1305 (3)(a)(IV) A S-25-146 342 9 06/02/2025 4 25-3.5-1305 (3)(b) A S-25-192 324 5 08/06/2025 4 25-3.5-1305 (3)(c) A S-25-192 324 5 08/06/2025 4 25-3.5-1306 (3) A S-25-192 324 6 08/06/2025 4 25-3.5-1307 A S-25-192 324 2 08/06/2025 25-4-901 (1) R H-25-1027 65 10 04/10/2025 25-4-901 (1.6) N H-25-1027 65 10 04/10/2025 25-4-901 (1.8) N H-25-1027 65 10 04/10/2025 25-4-902 IP(1) A H-25-1027 65 11 04/10/2025 25-4-902 (1)(a) A H-25-1027 65 11 04/10/2025 25-4-902 (1)(b) R H-25-1027 65 11 04/10/2025 25-4-902 (2) A H-25-1027 65 11 04/10/2025 25-4-902 (3) A H-25-1027 65 11 04/10/2025 25-4-902 (4)(a)(II) A H-25-1027 65 11 04/10/2025 25-4-902 (4)(b) A H-25-1027 65 11 04/10/2025 25-4-902.5 (1) A H-25-1027 65 12 04/10/2025 25-4-903 IP(2) A H-25-1027 65 13 04/10/2025 25-4-903 (2)(a) A H-25-1027 65 13 04/10/2025 25-4-903 (2)(b)(II)(B) A H-25-1027 65 13 04/10/2025 25-4-903 (2.2)(a)(III) A H-25-1027 65 13 04/10/2025 25-4-903 (2.2)(b)(II) A H-25-1027 65 13 04/10/2025 25-4-903 (2.2)(b)(III) A H-25-1027 65 13 04/10/2025 25-4-904 A H-25-1027 65 14 04/10/2025 25-4-904.5 A H-25-1027 65 15 04/10/2025 25-4-905 A H-25-1027 65 16 04/10/2025 25-4-906 (1) A H-25-1027 65 17 04/10/2025 25-4-906 (2) A H-25-1027 65 17 04/10/2025 25-4-906 (4) A H-25-1027 65 17 04/10/2025 25-4-907 (2) R H-25-1027 65 18 04/10/2025 4 25-4-1404 (1)(a)(I) A S-25-300 428 40 08/06/2025 4 25-4-1602 (1.5) N S-25-285 296 1 08/06/2025 3, 8 25-4-1602 (2.7) N H-25-1295 214 2 01/01/2026 4 25-4-1602 (5.5) N S-25-285 296 1 08/06/2025 4 25-4-1602 (5.7) N S-25-285 296 1 08/06/2025 4 25-4-1602 (9.5) N S-25-285 296 1 08/06/2025 4, 156 25-4-1602 (10.5) N S-25-285 296 1 08/06/2025 3, 8 25-4-1602 (10.5) N H-25-1295 214 2 01/01/2026 4 25-4-1602 (13.5) N S-25-285 296 1 08/06/2025 3, 8 25-4-1604 (2) A H-25-1295 214 3 01/01/2026 3, 8 25-4-1604 (3) N H-25-1295 214 3 01/01/2026 4 25-4-1607 IP(1) A S-25-285 296 2 08/06/2025 4 25-4-1607 (1)(e)(I)(B) A S-25-285 296 2 08/06/2025 4 25-4-1607 (1)(f) N S-25-285 296 2 08/06/2025 4 25-4-1607 (1.1) N S-25-285 296 2 08/06/2025 4 25-4-1607 (1.5) R S-25-285 296 2 08/06/2025 4 25-4-1607 (2) A S-25-285 296 2 08/06/2025 4 25-4-1607 (3) A S-25-285 296 2 08/06/2025 4 25-4-1607 (4) A S-25-285 296 2 08/06/2025 4 25-4-1607 (5) A S-25-285 296 2 08/06/2025 4 25-4-1607 (13) A S-25-285 296 2 08/06/2025 4 25-4-1607 (14) R S-25-285 296 2 08/06/2025 4 25-4-1607.7 A S-25-285 296 3 08/06/2025 4 25-4-1607.9 (1) A S-25-285 296 4 08/06/2025 4 25-4-1607.9 IP(2) A S-25-285 296 4 08/06/2025 4 25-4-1608 (2) A S-25-285 296 5 08/06/2025 4 25-4-1616 A H-25-1166 90 2 08/06/2025 4 25-4-1618 N H-25-1166 90 3 08/06/2025 2 25-4-1708 (5) N H-25-1215 312 7 05/30/2025 25-4-2005 (1) A H-25-1027 65 20 04/10/2025 2, 4 25-4-2208 (2) A S-25-008 207 2 08/06/2025 2, 4 25-4-2208 (3) A S-25-008 207 2 08/06/2025 2, 4 25-4-2208 (5) N S-25-008 207 2 08/06/2025 2, 3, 4 25-5-411 IP(1) A H-25-1203 83 2 08/06/2025 2, 3, 4 25-5-411 (1)(q) N H-25-1203 83 2 08/06/2025 2, 3, 4 25-5-411 (1)(r) N H-25-1203 83 2 08/06/2025 2, 3, 4 25-5-428 N H-25-1203 83 3 08/06/2025 4 25-5-1102 (2.3) N S-25-275 377 214 08/06/2025 4 25-5-1106 (2) A S-25-275 377 215 08/06/2025 3, 4 25-5-16 (entire part 16) N H-25-1161 438 1 08/06/2025 25-7-114.7 (2)(b)(VI) N S-25-254 328 1 05/31/2025 3 25-7-122 (1)(i) A H-25-1269 216 5 05/20/2025 25-7-129 IP(2)(a) A S-25-321 387 6 06/03/2025 25-7-129 (2)(a)(V) A S-25-321 387 6 06/03/2025 25-7-129 (3)(e) A S-25-265 130 2 07/01/2025 4 25-7-129 (3)(f) N H-25-1267 252 5 08/06/2025 25-7-129 (4) N S-25-264 129 33 04/25/2025 25-7-129.5 N S-25-321 387 7 06/03/2025 3 25-7-142 (1.5) N H-25-1269 216 3 05/20/2025 4 25-7-142 (2)(b.5) N S-25-039 37 1 08/06/2025 4 25-7-142 (2)(j)(II)(B) A S-25-039 37 1 08/06/2025 4 25-7-142 (2)(j)(II)(C) A S-25-039 37 1 08/06/2025 4 25-7-142 (2)(j)(II)(D) N S-25-039 37 1 08/06/2025 3 25-7-142 (2)(q.5) N H-25-1269 216 3 05/20/2025 3 25-7-142 (2)(s) A H-25-1269 216 3 05/20/2025 3 25-7-142 (3) A H-25-1269 216 3 05/20/2025 3 25-7-142 (8)(c)(III) A H-25-1269 216 3 05/20/2025 3 25-7-142 (8)(f) A H-25-1269 216 3 05/20/2025 3 25-7-142 (8.5) N H-25-1269 216 3 05/20/2025 3 25-7-142 (8.6) N H-25-1269 216 3 05/20/2025 3 25-7-142 (8.7) N H-25-1269 216 3 05/20/2025 3 25-7-142 (8.8) N H-25-1269 216 3 05/20/2025 4 25-7-142 (10) N S-25-039 37 1 08/06/2025 25-7-143 (6)(a) A S-25-254 328 2 05/31/2025 25-7-143 IP(7) A S-25-254 328 2 05/31/2025 25-7-143 (7)(a) A S-25-254 328 2 05/31/2025 25-7-1405 (4) N S-25-264 129 34 04/25/2025 4 25-7-1505 (2) A S-25-300 428 41 08/06/2025 25-8-107 N H-25-1077 39 3 03/28/2025 25-8-210 (4)(a)(I.2) N S-25-305 429 6 06/04/2025 25-8-305 (2)(f) A S-25-305 429 1 06/04/2025 25-8-305 (2)(h) N S-25-305 429 1 06/04/2025 25-8-305 (4)(b) A S-25-305 429 1 06/04/2025 25-8-305 (4)(c) N S-25-305 429 1 06/04/2025 25-8-501 (2) A S-25-305 429 2 06/04/2025 25-8-502 IP(1.1) A S-25-253 125 1 04/25/2025 25-8-502 (1.1)(a)(I) A S-25-253 125 1 04/25/2025 25-8-502 (1.1)(a)(II) A S-25-253 125 1 04/25/2025 25-8-502 (1.1)(a)(III) A S-25-253 125 1 04/25/2025 25-8-502 (1.1)(a)(IV)(A) R S-25-253 125 1 04/25/2025 25-8-502 (1.1)(a)(IV)(B) A S-25-253 125 1 04/25/2025 25-8-502 (3)(d) N S-25-305 429 3 06/04/2025 25-8-502 (7) N S-25-305 429 3 06/04/2025 25-8-503 (10) N S-25-305 429 4 06/04/2025 25-8-503.7 N S-25-305 429 5 06/04/2025 25-8-503.8 N S-25-305 429 7 06/04/2025 25-8-608 (1.8) A S-25-305 429 8 06/04/2025 25-8-608.7 (1) A S-25-264 129 35 04/25/2025 25-8-608.7 (4) N S-25-303 267 1 05/28/2025 4 25-11-105 R S-25-252 105 1 08/06/2025 2 25-11-113 (2)(a) A S-25-317 385 40 06/03/2025 2 25-11-113 (2)(c) N S-25-317 385 40 06/03/2025 4 25-15-300.3 N S-25-275 377 216 08/06/2025 4 25-15-308 (2)(a) A S-25-163 421 2 08/06/2025 4 25-15-308 (4)(a) A S-25-163 421 2 08/06/2025 4 25-15-308 (5) N S-25-163 421 2 08/06/2025 4 25-15-309 (1) A S-25-163 421 3 08/06/2025 4 25-15-309 (2) A S-25-163 421 3 08/06/2025 4 25-15-309 IP(3) A S-25-163 421 3 08/06/2025 4 25-15-309 (4) A S-25-163 421 3 08/06/2025 4 25-15-322 (5) A S-25-275 377 218 08/06/2025 4 25-15-324 (1) A S-25-275 377 217 08/06/2025 4 25-15-328 (6)(a) A S-25-289 273 3 08/06/2025 25-16-104.6 (1)(g) N S-25-255 106 1 04/24/2025 2 25-16-104.7 (1) A S-25-317 385 41 06/03/2025 2 25-16-104.7 (5) N S-25-317 385 41 06/03/2025 4 25-16.5-106 (2)(g) A H-25-1166 90 1 08/06/2025 4 25-16.5-106 (2)(h) A H-25-1166 90 1 08/06/2025 4 25-16.5-106 (2)(i) N H-25-1166 90 1 08/06/2025 4 25-16.5-109 (2)(i) N H-25-1059 77 2 08/06/2025 4 25-16.5-109 (5)(a)(VI) A H-25-1059 77 2 08/06/2025 4 25-16.5-109 (5)(a)(VII) A H-25-1059 77 2 08/06/2025 4 25-16.5-109 (5)(a)(VIII) N H-25-1059 77 2 08/06/2025 4 25-17-10 (entire part 10) N S-25-163 421 1 08/06/2025 25-20.5-21 (entire part 21) R S-25-250 104 1 04/24/2025 4 25-20.5-405 (2)(d) A H-25-1200 270 8 08/06/2025 4 25-20.5-408 (2)(c)(I) A H-25-1200 270 9 08/06/2025 4 25-20.5-502 (1) A S-25-275 377 219 08/06/2025 4 25-20.5-502 (1.5) N S-25-275 377 219 08/06/2025 4 25-20.5-503 (1) A S-25-275 377 220 08/06/2025 4 25-20.5-800.3 N S-25-275 377 221 08/06/2025 4 25-20.5-801 (1) A S-25-275 377 222 08/06/2025 4 25-20.5-1203 (2)(e) N H-25-1250 351 1 08/06/2025 4 25-20.5-1206 (4) N H-25-1250 351 2 08/06/2025 25-27-102 (10.5) A H-25-1022 1 1 02/27/2025 4 25-27-104 (3) N H-25-1213 276 2 08/06/2025 25-27-105 (2.5)(a) A S-25-146 342 10 06/02/2025 25-27-105 (2.5)(a.5) A S-25-146 342 10 06/02/2025 25-27-105 (2.5)(a.7) A S-25-146 342 10 06/02/2025 25-27-105 (5) N S-25-146 342 10 06/02/2025 25-27.5-106 (3)(a) A S-25-146 342 11 06/02/2025 25-27.5-106 (3)(a.5) A S-25-146 342 11 06/02/2025 25-45-102 IP(1) A H-25-1270 211 1 05/19/2025 25-45-102 (2) A H-25-1270 211 1 05/19/2025 25-45-103 IP A H-25-1270 211 2 05/19/2025 25-45-104 (1) A H-25-1270 211 3 05/19/2025 25-45-104 (3)(a) A H-25-1270 211 3 05/19/2025 25-45-107 A H-25-1270 211 4 05/19/2025 25-45-2 (entire part 2) N H-25-1270 211 5 05/19/2025 4 25-49-106 (1)(b) A H-25-1317 444 1 08/06/2025 1, 2 25-57-104 (1) A H-25-1259 304 4 05/30/2025 1, 2 25-57-104 (1.5) N H-25-1259 304 4 05/30/2025 1, 2 25-57-106 (1) A H-25-1259 304 5 05/30/2025 1, 2 25-57-107 (3) A H-25-1259 304 6 05/30/2025 1, 2 25-57-107 (6) A H-25-1259 304 6 05/30/2025 1, 2 25-57-107 (7)(b) A H-25-1259 304 6 05/30/2025 1, 2 25-57-108 IP(1) A H-25-1259 304 7 05/30/2025 1, 2 25-57-108 IP(2) A H-25-1259 304 7 05/30/2025 1, 2 25-57-108 (3) R H-25-1259 304 7 05/30/2025 1, 2 25-57-108 IP(4) A H-25-1259 304 7 05/30/2025 1, 2 25-57-108 (5) N H-25-1259 304 7 05/30/2025 1, 2 25-57-109 (1)(a) A H-25-1259 304 8 05/30/2025 1, 2 25-57-110 (3)(a)(I) A H-25-1259 304 9 05/30/2025 1, 2 25-57-110 (3)(a)(III) R H-25-1259 304 9 05/30/2025 1, 2 25-57-113 N H-25-1259 304 3 05/30/2025 TITLE 25.5 Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date 4 25.5-1-132 (1) A H-25-1326 309 3 08/06/2025 25.5-1-135 N S-25-045 191 2 05/14/2025 4 25.5-1-136 N H-25-1213 276 3 08/06/2025 3, 4 25.5-1-207 (1)(l) A H-25-1024 59 7 08/06/2025 2, 4 25.5-1-208 N H-25-1328 263 4 08/06/2025 4 25.5-1-601.5 N S-25-275 377 223 08/06/2025 4 25.5-1-602 IP(1) A S-25-275 377 224 08/06/2025 4 25.5-1-1001 IP(2)(e) A S-25-078 56 1 08/06/2025 4 25.5-1-1001 (2)(e)(II) A S-25-078 56 1 08/06/2025 4 25.5-1-1001 (2)(e)(III) A S-25-078 56 1 08/06/2025 4 25.5-1-1001 (2)(e)(IV) N S-25-078 56 1 08/06/2025 4 25.5-1-11 (entire part 11) N H-25-1017 231 2 08/06/2025 25.5-2-106 N S-25-183 97 2 01/01/2026 25.5-3-106 R S-25-183 97 7 01/01/2026 25.5-3-112 (1.7) N S-25-264 129 36 04/25/2025 25.5-3-112 (5) N S-25-264 129 36 04/25/2025 2 25.5-3-6 (entire part 6) N S-25-290 274 2 05/28/2025 4 25.5-4-103 (19.5) A H-25-1172 155 3 08/06/2025 4 25.5-4-205 (3)(b)(I.5)(H) N H-25-1162 335 1 08/06/2025 25.5-4-209 (2)(b)(III) A H-25-1033 6 1 03/07/2025 25.5-4-209 IP(2)(b)(IV) A H-25-1033 6 1 03/07/2025 25.5-4-209 (2)(b)(IV)(B) A H-25-1033 6 1 03/07/2025 25.5-4-209 (2)(b)(V) N H-25-1033 6 1 03/07/2025 4 25.5-4-301 (3)(a)(IX) R S-25-314 384 1 08/06/2025 4 25.5-4-301 (3.3) N S-25-314 384 1 08/06/2025 4 25.5-4-301 (3.5)(c) A S-25-314 384 1 08/06/2025 4 25.5-4-402 (3) A S-25-166 169 1 08/06/2025 5 25.5-4-402.4 IP(2) A S-25-228 150 1 05/01/2025 5 25.5-4-402.4 IP(2) A S-25-270 151 1 05/01/2025 5 25.5-4-402.4 IP(2) A S-25-270 151 2 05/01/2025 25.5-4-402.4 (2)(a) A S-25-270 151 1 05/01/2025 25.5-4-402.4 IP(2)(c) A S-25-270 151 1 05/01/2025 25.5-4-402.4 (2)(c)(V) A S-25-270 151 1 05/01/2025 25.5-4-402.4 (2)(c)(V.5) N S-25-270 151 1 05/01/2025 25.5-4-402.4 (2)(c)(V.7) N S-25-270 151 1 05/01/2025 25.5-4-402.4 (2)(c)(VI) A S-25-270 151 1 05/01/2025 5 25.5-4-402.4 IP(2)(d) A S-25-270 151 1 05/01/2025 5 25.5-4-402.4 IP(2)(d) A S-25-270 151 2 05/01/2025 22 25.5-4-402.4 (2)(d)(I) A S-25-270 151 1 05/01/2025 13 25.5-4-402.4 (2)(d)(I) A S-25-270 151 2 05/01/2025 25.5-4-402.4 (2)(d.5) N S-25-270 151 1 05/01/2025 25.5-4-402.4 (2)(d.7) N S-25-270 151 1 05/01/2025 25.5-4-402.4 (2)(e) A S-25-270 151 1 05/01/2025 26 25.5-4-402.4 (2)(f) A S-25-228 150 1 05/01/2025 26 25.5-4-402.4 (2)(f) A S-25-270 151 1 05/01/2025 4, 26 25.5-4-402.4 (2)(f) A H-25-1213 276 4 08/06/2025 4 25.5-4-402.4 (2)(f.5) N H-25-1213 276 4 08/06/2025 5 25.5-4-402.4 (2)(g) A S-25-228 150 1 05/01/2025 5 25.5-4-402.4 (2)(g) A S-25-270 151 1 05/01/2025 139 25.5-4-402.4 (3)(a) A S-25-228 150 1 05/01/2025 139 25.5-4-402.4 (3)(a) A S-25-270 151 1 05/01/2025 25.5-4-402.4 (3)(c)(I) A S-25-270 151 1 05/01/2025 25.5-4-402.4 (3)(c)(III) N S-25-228 150 1 05/01/2025 25.5-4-402.4 (3)(c)(IV) N S-25-270 151 1 05/01/2025 25.5-4-402.4 (3)(c)(V) N S-25-270 151 1 05/01/2025 139 25.5-4-402.4 (3)(d)(I) A S-25-228 150 1 05/01/2025 139 25.5-4-402.4 (3)(d)(I) A S-25-270 151 1 05/01/2025 25.5-4-402.4 (3)(d)(II) A S-25-270 151 1 05/01/2025 139 25.5-4-402.4 (3)(d)(III) A S-25-228 150 1 05/01/2025 139 25.5-4-402.4 (3)(d)(III) A S-25-270 151 1 05/01/2025 140 25.5-4-402.4 (3)(d)(V) A S-25-270 151 1 05/01/2025 4, 140 25.5-4-402.4 (3)(d)(V) A H-25-1213 276 4 08/06/2025 4 25.5-4-402.4 (3)(d)(VI) A H-25-1213 276 4 08/06/2025 4 25.5-4-402.4 (3)(d)(VII) A H-25-1213 276 4 08/06/2025 4 25.5-4-402.4 (3)(d)(VIII) N H-25-1213 276 4 08/06/2025 22 25.5-4-402.4 IP(4)(a) A S-25-270 151 1 05/01/2025 13, 141 25.5-4-402.4 IP(4)(a) A S-25-270 151 2 05/01/2025 4, 9, 141 25.5-4-402.4 IP(4)(a) A H-25-1213 276 4 08/06/2025 141 25.5-4-402.4 IP(4)(b) A S-25-270 151 1 05/01/2025 4, 141 25.5-4-402.4 IP(4)(b) A H-25-1213 276 4 08/06/2025 141 25.5-4-402.4 (4)(b)(II) A S-25-270 151 1 05/01/2025 4, 141 25.5-4-402.4 (4)(b)(II) A H-25-1213 276 4 08/06/2025 25.5-4-402.4 (4)(b)(III) A S-25-270 151 1 05/01/2025 25.5-4-402.4 IP(4)(c)(I) A S-25-270 151 1 05/01/2025 25.5-4-402.4 (4)(c)(II)(C) A S-25-270 151 1 05/01/2025 25.5-4-402.4 IP(4)(c)(III) A S-25-270 151 1 05/01/2025 25.5-4-402.4 (4)(c)(III)(E) A S-25-270 151 1 05/01/2025 25.5-4-402.4 (4)(c)(III)(F) A S-25-270 151 1 05/01/2025 25.5-4-402.4 (4)(e) A S-25-270 151 1 05/01/2025 25.5-4-402.4 (4)(f) A S-25-270 151 1 05/01/2025 22 25.5-4-402.4 (4)(g) A S-25-270 151 1 05/01/2025 13 25.5-4-402.4 (4)(g)(I) A S-25-270 151 2 05/01/2025 25.5-4-402.4 (4.5) N S-25-270 151 1 05/01/2025 25.5-4-402.4 (4.7) N S-25-270 151 1 05/01/2025 141 25.5-4-402.4 (5)(a) A S-25-270 151 1 05/01/2025 4, 141 25.5-4-402.4 (5)(a) A H-25-1213 276 4 08/06/2025 25.5-4-402.4 IP(5)(b) A S-25-270 151 1 05/01/2025 4 25.5-4-402.4 (5)(b)(I.5) N H-25-1213 276 4 08/06/2025 25.5-4-402.4 IP(5)(b)(IV) A S-25-270 151 1 05/01/2025 141 25.5-4-402.4 (5)(b)(VI)(B) A S-25-270 151 1 05/01/2025 4, 141 25.5-4-402.4 (5)(b)(VI)(B) A H-25-1213 276 4 08/06/2025 4, 9 25.5-4-402.4 (5)(b)(VI)(D) A H-25-1213 276 4 08/06/2025 25.5-4-402.4 (5)(c)(I)(A) A S-25-270 151 1 05/01/2025 25.5-4-402.4 (5)(c)(II)(C) A S-25-270 151 1 05/01/2025 25.5-4-402.4 (5)(c)(III) A S-25-270 151 1 05/01/2025 25.5-4-402.4 (5)(c)(V) A S-25-270 151 1 05/01/2025 25.5-4-402.4 (5.1) N S-25-228 150 1 05/01/2025 25.5-4-402.4 (5.5) N S-25-270 151 1 05/01/2025 25.5-4-402.4 (5.7) N S-25-270 151 1 05/01/2025 141 25.5-4-402.4 (6)(a)(I) A S-25-270 151 1 05/01/2025 4, 141 25.5-4-402.4 (6)(a)(I) A H-25-1213 276 4 08/06/2025 25.5-4-402.4 (6)(a)(IV) N S-25-270 151 1 05/01/2025 25.5-4-402.4 (6)(a)(V) N S-25-270 151 1 05/01/2025 25.5-4-402.4 IP(6)(b) A S-25-270 151 1 05/01/2025 141 25.5-4-402.4 (6)(b)(II) A S-25-270 151 1 05/01/2025 4, 141 25.5-4-402.4 (6)(b)(II) A H-25-1213 276 4 08/06/2025 25.5-4-402.4 (6)(b)(III)(A) A S-25-270 151 1 05/01/2025 25.5-4-402.4 (6)(b)(III)(B) A S-25-270 151 1 05/01/2025 25.5-4-402.4 (6)(b.5) N S-25-270 151 1 05/01/2025 141 25.5-4-402.4 (6)(c) A S-25-270 151 1 05/01/2025 4, 141 25.5-4-402.4 (6)(c) A H-25-1213 276 4 08/06/2025 25.5-4-402.4 (6)(c.5) N S-25-270 151 1 05/01/2025 25.5-4-402.4 (6)(c.7) N S-25-270 151 1 05/01/2025 25.5-4-402.4 (7)(b) A S-25-270 151 1 05/01/2025 25.5-4-402.4 (7)(d)(I) A S-25-270 151 1 05/01/2025 25.5-4-402.4 (7)(d)(II) A S-25-270 151 1 05/01/2025 25.5-4-402.4 (7)(d)(III) A S-25-270 151 1 05/01/2025 25.5-4-402.4 (7)(d)(IX) A S-25-270 151 1 05/01/2025 25.5-4-402.4 (7)(d)(X) A S-25-270 151 1 05/01/2025 25.5-4-402.4 IP(7)(e) A S-25-270 151 1 05/01/2025 25.5-4-402.4 (7)(e)(II) A S-25-270 151 1 05/01/2025 25.5-4-402.4 (7)(e)(II.5) N S-25-270 151 1 05/01/2025 25.5-4-402.4 (7)(e)(II.7) N S-25-270 151 1 05/01/2025 25.5-4-402.4 IP(7)(e)(III) A S-25-270 151 1 05/01/2025 25.5-4-402.4 (7)(e)(III.5) N S-25-270 151 1 05/01/2025 25.5-4-402.4 (7)(e)(III.7) N S-25-270 151 1 05/01/2025 25.5-4-402.4 (7)(e)(IV) A S-25-270 151 1 05/01/2025 25.5-4-402.4 (7)(g) N S-25-228 150 1 05/01/2025 25.5-4-402.4 (7)(h) N S-25-270 151 1 05/01/2025 25.5-4-402.4 (7.5) N S-25-270 151 1 05/01/2025 25.5-4-402.4 (9) N S-25-270 151 1 05/01/2025 4 25.5-4-402.4 (10) N H-25-1213 276 4 08/06/2025 25.5-4-402.8 (2)(g)(I) A S-25-270 151 12 05/01/2025 4 25.5-4-403.1 (1)(a) A H-25-1326 309 4 08/06/2025 25.5-4-412 (1) A S-25-183 97 3 01/01/2026 25.5-4-412 (2)(a)(IV) A S-25-183 97 3 01/01/2026 25.5-4-415 R S-25-183 97 7 01/01/2026 4 25.5-4-434 N S-25-166 169 2 08/06/2025 4 25.5-4-435 N S-25-042 28 3 08/06/2025 25.5-4-505.7 N S-25-308 299 3 05/30/2025 25.5-5-103 (1)(b) A S-25-270 151 3 05/01/2025 25.5-5-103 (2) R S-25-183 97 7 01/01/2026 25.5-5-201 (1)(o)(II) A S-25-270 151 13 05/01/2025 25.5-5-201 (1)(r)(II) A S-25-270 151 13 05/01/2025 25.5-5-202 (5) N S-25-294 329 2 05/31/2025 25.5-5-203 (1)(i) R H-25-1003 50 4 07/01/2025 25.5-5-203 (1)(p) N H-25-1003 50 4 07/01/2025 25.5-5-204.5 (2) A S-25-270 151 14 05/01/2025 25.5-5-206 (3) N S-25-228 150 2 05/01/2025 4 25.5-5-301 (2)(a) A H-25-1326 309 5 08/06/2025 25.5-5-304 (3)(d) N H-25-1003 50 2 07/01/2025 25.5-5-305 R H-25-1003 50 6 07/01/2026 25.5-5-305 (6) A S-25-264 129 38 07/01/2025 25.5-5-305 (7) N S-25-264 129 37 04/25/2025 25.5-5-329 (1)(b)(IV) A S-25-183 97 4 01/01/2026 2 25.5-5-331 A H-25-1288 260 3 05/27/2025 25.5-5-334 (10) A S-25-229 220 1 05/20/2025 25.5-5-334 (11) N S-25-229 220 1 05/20/2025 25.5-5-339 (12) N S-25-308 299 2 05/30/2025 25.5-5-340 N S-25-308 299 1 05/30/2025 25.5-5-402 (2)(a) A S-25-294 329 1 05/31/2025 25.5-5-402 (2)(c) N S-25-294 329 1 05/31/2025 4 25.5-5-402 (7.3) N H-25-1213 276 5 08/06/2025 25.5-5-418 A S-25-264 129 39 04/25/2025 4 25.5-5-427 N H-25-1213 276 6 08/06/2025 2, 4 25.5-5-519 N S-25-084 275 2 08/06/2025 4 25.5-6-113 (3)(b) A H-25-1326 309 6 08/06/2025 4 25.5-6-117 N H-25-1162 335 2 08/06/2025 4 25.5-6-118 N H-25-1213 276 7 08/06/2025 4 25.5-6-119 N H-25-1213 276 8 08/06/2025 25.5-6-202 (5) R S-25-270 151 4 05/01/2025 25.5-6-202 (6) R S-25-270 151 4 05/01/2025 25.5-6-202 (7) R S-25-270 151 4 05/01/2025 25.5-6-202 IP(9)(b)(I) A S-25-270 151 4 05/01/2025 25.5-6-202 (9)(b)(II) A S-25-270 151 4 05/01/2025 25.5-6-202 (9)(b)(VI) A S-25-270 151 4 05/01/2025 25.5-6-202 (9)(b.3) R S-25-270 151 4 05/01/2025 25.5-6-202 (9)(d) R S-25-270 151 4 05/01/2025 25.5-6-203 (1) R S-25-270 151 5 05/01/2025 25.5-6-203 (2)(a.5) N S-25-270 151 5 05/01/2025 25.5-6-203 (3) N S-25-270 151 5 05/01/2025 25.5-6-204 (1)(c) A S-25-270 151 6 05/01/2025 2 25.5-6-205 (3)(c) A S-25-317 385 42 06/03/2025 25.5-6-210 (4)(b) A S-25-270 151 7 05/01/2025 25.5-6-901 R H-25-1003 50 6 07/01/2026 25.5-6-904 N H-25-1003 50 1 07/01/2025 4 25.5-6-1201 (1) A S-25-226 219 1 08/06/2025 4 25.5-6-1301 A S-25-226 219 2 08/06/2025 4 25.5-6-1302 (1) A S-25-226 219 3 08/06/2025 4 25.5-6-1302 (3) A S-25-226 219 3 08/06/2025 4 25.5-6-1303 (1)(a) A S-25-226 219 4 08/06/2025 4 25.5-6-1303 (2)(a) A S-25-226 219 4 08/06/2025 4 25.5-6-1303 IP(2)(b) A S-25-226 219 4 08/06/2025 4 25.5-6-1303 (2)(b)(II) A S-25-226 219 4 08/06/2025 4 25.5-6-1303 (2)(b)(III) A S-25-226 219 4 08/06/2025 4 25.5-6-1303 (2)(c) R S-25-226 219 4 08/06/2025 4 25.5-6-1303 (2)(d) A S-25-226 219 4 08/06/2025 4 25.5-6-1303 (3) A S-25-226 219 4 08/06/2025 4 25.5-6-1303 (4) A S-25-226 219 4 08/06/2025 4 25.5-6-1303 (5) R S-25-226 219 4 08/06/2025 4 25.5-6-1303 (7) R S-25-226 219 4 08/06/2025 4 25.5-6-1304 A S-25-226 219 5 08/06/2025 4 25.5-6-1403 (4) A S-25-226 219 6 08/06/2025 25.5-6-1403 (5)(b) A S-25-270 151 15 05/01/2025 25.5-6-1404 (3)(a) A S-25-228 150 3 05/01/2025 25.5-6-1404 (3)(b) A S-25-228 150 3 05/01/2025 25.5-6-1405 (1) A S-25-228 150 4 05/01/2025 2, 4 25.5-6-1603 (2) A H-25-1328 263 5 08/06/2025 4 25.5-6-2001 (2)(a) A H-25-1213 276 9 08/06/2025 4 25.5-6-2001 (2)(c)(II) A H-25-1213 276 9 08/06/2025 4 25.5-6-2001 (2)(c)(III) A H-25-1213 276 9 08/06/2025 4 25.5-6-2001 (3)(a) A H-25-1213 276 9 08/06/2025 4 25.5-6-2001 (7)(b) A H-25-1213 276 9 08/06/2025 25.5-6-2001 (7.5) N S-25-292 297 1 05/30/2025 25.5-8-103 (4)(a)(II) A S-25-270 151 16 05/01/2025 25.5-8-103 (4)(b)(II) A S-25-270 151 16 05/01/2025 25.5-8-107 (1)(a)(VI) N S-25-183 97 5 01/01/2026 1, 2, 3, 100 25.5-8-107 (1)(a)(VII) N S-25-048 365 4 01/01/2027 4 25.5-10-100.3 N S-25-275 377 225 08/06/2025 4 25.5-10-101 (1) A S-25-275 377 226 08/06/2025 4 25.5-10-237 (1) A H-25-1058 15 26 08/06/2025 2 25.5-10-305.5 (4) N H-25-1215 312 8 05/30/2025 TITLE 26 Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date 2 26-1-109 (10) N H-25-1234 441 2 06/04/2025 4 26-1-139 (5)(e) A H-25-1200 270 10 08/06/2025 26-2-310 N S-25-169 189 1 05/13/2025 4 26-2-709 (1)(f) N H-25-1279 271 2 08/06/2025 4 26-2-727 N H-25-1279 271 1 08/06/2025 4 26-3.1-111 (7)(c) A S-25-192 324 8 08/06/2025 4 26-5-103.5 (4.5)(c) R S-25-300 428 43 08/06/2025 4 26-5-103.7 (4)(f) A S-25-300 428 44 08/06/2025 4 26-5-104 (1)(c) R S-25-300 428 45 08/06/2025 4 26-5-104 (1)(d) R S-25-300 428 45 08/06/2025 4 26-5-104 (1)(e) R S-25-300 428 45 08/06/2025 26-5.7-110 (1)(b.5) N S-25-146 342 12 06/02/2025 26-5.7-110 (3)(f)(III) A S-25-146 342 12 06/02/2025 26-6-705 (2)(a)(I) A S-25-146 342 5 06/02/2025 4 26-6-903 (32) A H-25-1172 155 4 08/06/2025 4 26-6-903 (34.5) N H-25-1172 155 4 08/06/2025 4 26-6-909 (9) N H-25-1172 155 5 08/06/2025 26-6-921 (4)(b) A S-25-265 130 1 07/01/2025 2 26-6-924 N S-25-151 70 3 04/10/2025 2, 4 26-6.8-101 A S-25-197 256 2 08/06/2025 2, 4, 91 26-6.8-102 A S-25-197 256 3 08/06/2025 2, 4 26-6.8-103 A S-25-197 256 4 08/06/2025 2, 4 26-6.8-104 R S-25-197 256 5 08/06/2025 2, 4 26-6.8-105 R S-25-197 256 6 08/06/2025 2, 4 26-6.8-106 R S-25-197 256 7 08/06/2025 4 26-11-100.3 N S-25-275 377 227 08/06/2025 4 26-11-101 IP(1)(a) A S-25-275 377 228 08/06/2025 26-11-209 (6)(c) N S-25-264 129 40 04/25/2025 26-13-122.7 (1)(c)(I)(D) A H-25-1159 334 8 05/31/2025 26-13-125 (1)(a) A H-25-1159 334 9 05/31/2025 26-13-125 (1)(e) N H-25-1159 334 9 05/31/2025 26-13-125 (1)(f) N H-25-1159 334 9 05/31/2025 26-13-125 (3) A H-25-1159 334 9 05/31/2025 26-13-125 (9) N H-25-1159 334 9 05/31/2025 26-13.5-103 (1)(h) A H-25-1159 334 10 05/31/2025 26-13.5-103 (1)(i.5) A H-25-1159 334 10 05/31/2025 26-13.5-105 (5) A H-25-1159 334 11 05/31/2025 26-20-102 (1)(a)(III) A H-25-1248 251 4 05/24/2025 26-20-102 (1)(a)(VI) R H-25-1248 251 4 05/24/2025 26-20-102 (1)(b)(V) N H-25-1248 251 4 05/24/2025 26-20-102 IP(6) A H-25-1248 251 4 05/24/2025 26-20-102 (6)(c) A H-25-1248 251 4 05/24/2025 4 26-20-102 (6)(f) N H-25-1172 155 6 08/06/2025 4 26-20-110 (1)(i) A H-25-1200 270 11 08/06/2025 26-20-111 R H-25-1248 251 5 05/24/2025 26-21-101 A H-25-1154 230 1 05/22/2025 26-21-102 RE H-25-1154 230 2 05/22/2025 26-21-103 (1) R H-25-1154 230 3 05/22/2025 26-21-103 (2.3) N H-25-1154 230 3 05/22/2025 26-21-103 (3) A H-25-1154 230 3 05/22/2025 26-21-103 (3.5) N H-25-1154 230 3 05/22/2025 26-21-103 (4.4) N H-25-1154 230 3 05/22/2025 26-21-103 (4.5) N H-25-1154 230 3 05/22/2025 26-21-103 (4.6) N H-25-1154 230 3 05/22/2025 26-21-103 (4.7)(b) A H-25-1154 230 3 05/22/2025 26-21-103 IP(4.8) A H-25-1154 230 3 05/22/2025 26-21-103 (8.5) N H-25-1154 230 3 05/22/2025 26-21-103 (11) N H-25-1154 230 3 05/22/2025 26-21-103 (12) N H-25-1154 230 3 05/22/2025 26-21-103.5 N H-25-1154 230 4 05/22/2025 26-21-104 (1) A H-25-1154 230 5 05/22/2025 26-21-104 (5) N H-25-1154 230 5 05/22/2025 26-21-105 (1) A H-25-1154 230 6 05/22/2025 26-21-105 (2)(f) R H-25-1154 230 6 05/22/2025 26-21-105 (2)(g) N H-25-1154 230 6 05/22/2025 26-21-105 (5) N H-25-1154 230 6 05/22/2025 26-21-106 IP(1) A H-25-1154 230 7 05/22/2025 26-21-106 (1)(d) A H-25-1154 230 7 05/22/2025 26-21-106 IP(1)(e) A H-25-1154 230 7 05/22/2025 26-21-106 (1)(e)(I) A H-25-1154 230 7 05/22/2025 26-21-106 (1)(e)(II) A H-25-1154 230 7 05/22/2025 26-21-106 (1)(f) A H-25-1154 230 7 05/22/2025 26-21-106 (1)(g) N H-25-1154 230 7 05/22/2025 26-21-106 (1.5) N H-25-1154 230 7 05/22/2025 26-21-106 (1.7) N H-25-1154 230 7 05/22/2025 26-21-106 (2) A H-25-1154 230 7 05/22/2025 26-21-106 (3) A H-25-1154 230 7 05/22/2025 26-21-106 IP(4) A H-25-1154 230 7 05/22/2025 26-21-106 IP(4)(g)(II) A H-25-1154 230 7 05/22/2025 26-21-106 (4)(g)(II)(B) A H-25-1154 230 7 05/22/2025 26-21-106 (6) A H-25-1154 230 7 05/22/2025 26-21-106 IP(7) A H-25-1154 230 7 05/22/2025 26-21-106 (7)(a) A H-25-1154 230 7 05/22/2025 26-21-106 (7)(b) A H-25-1154 230 7 05/22/2025 26-21-106 IP(8) A H-25-1154 230 7 05/22/2025 26-21-106 (8.5) A H-25-1154 230 7 05/22/2025 26-21-106 IP(9)(a) A H-25-1154 230 7 05/22/2025 26-21-106 (9)(a)(VIII) A H-25-1154 230 7 05/22/2025 26-21-106 (9)(a)(IX) R H-25-1154 230 7 05/22/2025 26-21-106 (9)(b) A H-25-1154 230 7 05/22/2025 26-21-106 (9)(c)(I) A H-25-1154 230 7 05/22/2025 26-21-107 (1) A H-25-1154 230 8 05/22/2025 26-21-107.5 (1) A H-25-1154 230 9 05/22/2025 26-21-107.5 (2) A H-25-1154 230 9 05/22/2025 26-21-107.5 (7) A H-25-1154 230 9 05/22/2025 26-21-107.7 (1)(a.5)(I) A H-25-1154 230 10 05/22/2025 26-21-107.7 IP(1)(a.5)(II) A H-25-1154 230 10 05/22/2025 26-21-107.7 (1)(a.5)(III) R H-25-1154 230 10 05/22/2025 26-21-107.7 (1)(c) A H-25-1154 230 10 05/22/2025 26-21-107.7 (1)(d) A H-25-1154 230 10 05/22/2025 26-21-107.7 (1)(e) A H-25-1154 230 10 05/22/2025 26-21-107.7 (2) A H-25-1154 230 10 05/22/2025 26-21-107.7 (3) A H-25-1154 230 10 05/22/2025 26-21-107.9 N H-25-1154 230 11 05/22/2025 26-21-108 R H-25-1154 230 12 05/22/2025 TITLE 26.5 Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date 4 26.5-1-301.5 N S-25-275 377 229 08/06/2025 4 26.5-1-302 (1) A S-25-275 377 230 08/06/2025 4 26.5-1-304 A S-25-177 170 2 08/06/2025 4 26.5-2-202 (4) N S-25-275 377 235 08/06/2025 4 26.5-2-209 (1) A S-25-275 377 236 08/06/2025 26.5-3-206 (4)(a) R S-25-266 108 2 07/01/2025 4 26.5-3-208 A H-25-1305 203 1 08/06/2025 4 26.5-3-209 N H-25-1305 203 2 08/06/2025 4 26.5-3-507 (2)(e) A S-25-300 428 42 08/06/2025 4 26.5-3-10 (entire part 10) N S-25-017 415 1 08/06/2025 4 26.5-4-301.5 N S-25-275 377 231 08/06/2025 4 26.5-4-302 IP(1) A S-25-275 377 232 08/06/2025 4 26.5-5-100.3 N S-25-275 377 233 08/06/2025 4 26.5-5-101 IP(1) A S-25-275 377 234 08/06/2025 8 26.5-5-332 N S-25-004 25 1 01/01/2026 26.5-6-103 (5) A S-25-315 237 22 07/01/2026 TITLE 27 Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date 4 27-10.5-901.5 N S-25-275 377 237 08/06/2025 4 27-10.5-902 (1) A S-25-275 377 238 08/06/2025 4 27-50-108 (4)(c) A H-25-1200 270 12 08/06/2025 2, 4 27-50-203 (1) A H-25-1124 61 2 08/06/2025 2, 4 27-50-203 (2) A H-25-1124 61 2 08/06/2025 4 27-50-700.3 N S-25-275 377 239 08/06/2025 4 27-50-701 (1) A S-25-275 377 240 08/06/2025 27-50-9 (entire part 9) R S-25-238 141 2 04/28/2025 27-60-103 (1)(b)(I) R S-25-236 140 3 07/01/2025 27-60-103 (1)(b)(V) A S-25-236 140 3 07/01/2025 27-60-103 (1.7) A S-25-295 330 4 05/31/2025 27-60-104.5 (3)(c) A S-25-236 140 4 07/01/2025 27-60-104.5 (8) A S-25-236 140 4 07/01/2025 4 27-60-105.5 N S-25-041 357 1 08/06/2025 4 27-60-117 N S-25-042 28 2 08/06/2025 27-60-206 (5)(a) A S-25-312 301 16 05/30/2025 4 27-60-303 (1.5)(d) A S-25-300 428 46 08/06/2025 27-60-405 (1) A S-25-312 301 17 05/30/2025 27-60-505 (2) A S-25-312 301 18 05/30/2025 27-64-103 (4)(d)(I) A S-25-236 140 5 07/01/2025 27-64-103 (7) A S-25-236 140 5 07/01/2025 4 27-65-106 (6)(a) A S-25-042 28 4 08/06/2025 4 27-65-106 (7)(d) N S-25-042 28 4 08/06/2025 27-65-106 (8)(a)(VI) A S-25-236 140 6 07/01/2025 27-65-106 (8)(d)(I) A S-25-236 140 6 07/01/2025 4 27-65-110 IP(1) A S-25-041 357 12 08/06/2025 4 27-65-118 (1)(a) A H-25-1326 309 7 08/06/2025 27-65-119 (1)(d) A S-25-236 140 7 07/01/2025 4 27-65-127 (1)(a) A H-25-1058 15 27 08/06/2025 27-65-132 N S-25-009 165 2 05/05/2025 4 27-80-117 (3)(a) A S-25-195 243 2 08/06/2025 4 27-80-117 (4)(a) A S-25-195 243 2 08/06/2025 27-80-122 (2) R S-25-266 108 3 07/01/2025 27-80-125 (5) R S-25-266 108 4 07/01/2025 27-80-126 (4) A S-25-266 108 5 07/01/2025 27-80-126 (8) R S-25-266 108 5 07/01/2025 27-80-129 (7)(c)(IV) A S-25-236 140 8 07/01/2025 27-80-129 (7)(e) A S-25-236 140 8 07/01/2025 4 27-94-101.5 N S-25-275 377 241 08/06/2025 4 27-94-102 (1) A S-25-275 377 242 08/06/2025 TITLE 28 Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date 2 28-3-103 (10) N S-25-276 240 17 05/23/2025 2 28-3-107 A H-25-1215 312 9 05/30/2025 4 28-3-1501.5 N S-25-275 377 243 08/06/2025 4 28-3-1502 (1) A S-25-275 377 244 08/06/2025 4 28-3-1601.5 N S-25-275 377 245 08/06/2025 4 28-3-1602 (1)(a) A S-25-275 377 246 08/06/2025 4 28-3-1703 (1.5) N S-25-275 377 247 08/06/2025 4 28-3-1704 (5)(b) A S-25-275 377 248 08/06/2025 3, 28 28-3.1-102 (14.3) N S-25-279 411 1 09/01/2025 3, 28 28-3.1-102 (20) A S-25-279 411 1 09/01/2025 3, 28 28-3.1-102 (21.5) N S-25-279 411 1 09/01/2025 3, 28 28-3.1-102.5 N S-25-279 411 2 09/01/2025 3, 28 28-3.1-103 A S-25-279 411 3 09/01/2025 3, 28 28-3.1-111 R S-25-279 411 17 09/01/2025 3, 28 28-3.1-112 R S-25-279 411 17 09/01/2025 3, 28 28-3.1-113 R S-25-279 411 17 09/01/2025 3, 28 28-3.1-114 (1) A S-25-279 411 4 09/01/2025 3, 28 28-3.1-114 IP(2) A S-25-279 411 4 09/01/2025 3, 28 28-3.1-114 IP(2)(a) A S-25-279 411 4 09/01/2025 3, 28 28-3.1-114 (2)(a)(I) R S-25-279 411 4 09/01/2025 3, 28 28-3.1-114 (2)(a)(III) A S-25-279 411 4 09/01/2025 3, 28 28-3.1-114 (2)(a)(IV) A S-25-279 411 4 09/01/2025 3, 28 28-3.1-114 (2)(a)(V) A S-25-279 411 4 09/01/2025 3, 28 28-3.1-114 (2)(a)(VI) N S-25-279 411 4 09/01/2025 3, 28 28-3.1-114 IP(2)(b) A S-25-279 411 4 09/01/2025 3, 28 28-3.1-114 (2)(b)(I) R S-25-279 411 4 09/01/2025 3, 28 28-3.1-114 (2)(b)(IV) A S-25-279 411 4 09/01/2025 3, 28 28-3.1-114 (2)(b)(V) A S-25-279 411 4 09/01/2025 3, 28 28-3.1-114 (2)(b)(VI) N S-25-279 411 4 09/01/2025 3, 28 28-3.1-114 (2)(b)(VII) N S-25-279 411 4 09/01/2025 3, 28 28-3.1-114 (2.5) R S-25-279 411 4 09/01/2025 3, 28 28-3.1-114 (4.4) A S-25-279 411 4 09/01/2025 3, 28 28-3.1-114 (4.7) A S-25-279 411 4 09/01/2025 3, 28 28-3.1-201 (2)(b) A S-25-279 411 5 09/01/2025 3, 28 28-3.1-203 IP(1) A S-25-279 411 6 09/01/2025 3, 28 28-3.1-203 (1)(a) A S-25-279 411 6 09/01/2025 3, 28 28-3.1-203 (1)(e) A S-25-279 411 6 09/01/2025 3, 28 28-3.1-203 (1)(f) A S-25-279 411 6 09/01/2025 3, 28 28-3.1-204 A S-25-279 411 7 09/01/2025 3, 28 28-3.1-205 (1) A S-25-279 411 8 09/01/2025 3, 28 28-3.1-213 (3) A S-25-279 411 9 09/01/2025 3, 28 28-3.1-214 R S-25-279 411 17 09/01/2025 3, 28 28-3.1-215 R S-25-279 411 17 09/01/2025 3, 28 28-3.1-216 R S-25-279 411 17 09/01/2025 3, 28 28-3.1-217 R S-25-279 411 17 09/01/2025 3, 28 28-3.1-218 R S-25-279 411 17 09/01/2025 3, 28 28-3.1-219 R S-25-279 411 17 09/01/2025 3, 28 28-3.1-301 A S-25-279 411 10 09/01/2025 3, 28 28-3.1-302 R S-25-279 411 17 09/01/2025 3, 28 28-3.1-304 R S-25-279 411 17 09/01/2025 3, 28 28-3.1-305 R S-25-279 411 17 09/01/2025 3, 28 28-3.1-306 (3) N S-25-279 411 11 09/01/2025 3, 28 28-3.1-307 R S-25-279 411 17 09/01/2025 3, 28 28-3.1-308 RE S-25-279 411 12 09/01/2025 3, 28 28-3.1-309 R S-25-279 411 17 09/01/2025 3, 28 28-3.1-310 R S-25-279 411 17 09/01/2025 3, 28 28-3.1-314 R S-25-279 411 17 09/01/2025 3, 28 28-3.1-315 R S-25-279 411 17 09/01/2025 3, 28 28-3.1-316 R S-25-279 411 17 09/01/2025 3, 28 28-3.1-317 R S-25-279 411 17 09/01/2025 3, 28 28-3.1-318 R S-25-279 411 17 09/01/2025 3, 28 28-3.1-319 R S-25-279 411 17 09/01/2025 3, 28 28-3.1-407 A S-25-279 411 13 09/01/2025 3, 28 28-3.1-421 IP(1) A S-25-279 411 14 09/01/2025 3, 28 28-3.1-5 (entire part 5) RE S-25-279 411 15 09/01/2025 3, 28 28-3.1-605 R S-25-279 411 17 09/01/2025 3, 28 28-3.1-606.5 N S-25-279 411 16 09/01/2025 4 28-5-714 RE H-25-1132 160 1 08/06/2025 111 28-5-714 (2)(d) A S-25-295 330 5 112, 113 28-5-714 (4)(a) A S-25-295 330 6 08/06/2025 TITLE 29 Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date 4 29-1-102 (13) A S-25-081 320 5 08/06/2025 4, 66 29-1-400.3 N S-25-275 377 249 08/06/2025 4, 189 29-1-403 (2) R S-25-275 377 336 08/06/2025 29-1-603 (6) N S-25-310 359 8 06/02/2025 4 29-1-604 (1) A S-25-023 52 1 08/06/2025 4 29-1-604 (2)(b) A S-25-023 52 1 08/06/2025 4 29-1-1703 IP(1.5) A S-25-300 428 47 08/06/2025 4 29-1-1703 (1.5)(b)(I)(B) A S-25-300 428 47 08/06/2025 4 29-1-1703 IP(4) A S-25-300 428 47 08/06/2025 9 29-2-201 (8)(e) A H-25-1154 230 27 01/01/2026 9 29-2-202 (1)(b)(V) A H-25-1154 230 28 01/01/2026 29-2-217 N S-25-046 20 1 07/01/2025 4 29-11-102.5 (1.5) N S-25-031 147 4 08/06/2025 29-11-102.7 (2)(a) A H-25-1154 230 14 05/22/2025 29-11-102.7 (6) N H-25-1154 230 14 05/22/2025 4 29-11-108 (5)(b)(V.5) N S-25-031 147 3 08/06/2025 3, 121 29-11.2- (entire article 11.2) N S-25-050 181 2 09/01/2026 3, 8 29-11.6- (entire article 11.6) RC H-25-1295 214 1 01/01/2026 4 29-11.7-105 N S-25-205 356 1 08/06/2025 4 29-20-104.2 (2)(a) A H-25-1093 48 1 08/06/2025 4 29-20-104.2 (2)(b.5) N H-25-1093 48 1 08/06/2025 4 29-20-104.2 (6) N H-25-1093 48 1 08/06/2025 3 29-20-112 N H-25-1023 258 1 05/27/2025 4 29-20-203 (3) N H-25-1093 48 2 08/06/2025 3, 17 29-27-401 A H-25-1056 434 1 01/01/2026 3, 17 29-27-402 (3) A H-25-1056 434 2 01/01/2026 3, 17 29-27-402 (3.1) N H-25-1056 434 2 01/01/2026 3, 17 29-27-402 (3.3) N H-25-1056 434 2 01/01/2026 3, 17 29-27-402 (3.7) N H-25-1056 434 2 01/01/2026 3, 17 29-27-402 (6.2) N H-25-1056 434 2 01/01/2026 3, 17 29-27-402 (7) A H-25-1056 434 2 01/01/2026 3, 17 29-27-403 RE H-25-1056 434 3 01/01/2026 3, 17 29-27-405 N H-25-1056 434 4 01/01/2026 137 29-32-103 (1) A S-25-313 302 1 05/30/2025 137 29-32-103 (1) A S-25-308 299 5 05/30/2025 130 29-32-104 (3) A S-25-313 302 2 05/30/2025 130 29-32-104 (3)(b) A H-25-1019 5 1 03/07/2025 1, 2, 3, 4 29-32-105 (2)(a) A H-25-1272 183 7 08/06/2025 29-32-106 (1) A S-25-313 302 3 05/30/2025 29-32-106 (2) R S-25-313 302 3 05/30/2025 29-32-106 (3) N S-25-313 302 3 05/30/2025 4 29-35-202 (2)(m)(II) A S-25-300 428 48 08/06/2025 4 29-35-202 (2)(m)(III) A S-25-300 428 48 08/06/2025 2 29-35-210 (8)(a)(I) A S-25-317 385 43 06/03/2025 2 29-35-210 (8)(a)(IV) N S-25-317 385 43 06/03/2025 2 29-35-405 (7)(a) A S-25-317 385 44 06/03/2025 2 29-35-405 (7)(d) N S-25-317 385 44 06/03/2025 TITLE 30 Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date 4, 67 30-10-400.3 N S-25-275 377 250 08/06/2025 4 30-10-405.5 A S-25-275 377 251 08/06/2025 4 30-10-406 (1) A S-25-275 377 252 08/06/2025 4, 190 30-10-421 (6)(b) R S-25-275 377 336 08/06/2025 2 30-10-530 (7)(b) A S-25-317 385 45 06/03/2025 4 30-10-600.3 N S-25-275 377 253 08/06/2025 4 30-10-601.6 (1) A S-25-275 377 254 08/06/2025 4 30-10-606 (6)(e) N S-25-273 345 1 08/06/2025 4, 68 30-10-700.3 N S-25-275 377 255 08/06/2025 4, 191 30-10-711 (5) R S-25-275 377 336 08/06/2025 4 30-11-101 (1)(m) N S-25-020 264 4 08/06/2025 4 30-11-101 (3) N S-25-020 264 4 08/06/2025 30-11-107.5 (1) A H-25-1247 187 1 05/13/2025 30-11-107.5 (1.5)(a)(II) A H-25-1247 187 1 05/13/2025 30-11-107.5 (1.5)(a)(IV) N H-25-1247 187 1 05/13/2025 30-11-107.5 (1.5)(a)(V) N H-25-1247 187 1 05/13/2025 30-11-107.5 (1.5)(b) A H-25-1247 187 1 05/13/2025 30-11-107.5 (2)(c) A H-25-1247 187 1 05/13/2025 30-11-107.5 (3)(a) A H-25-1247 187 1 05/13/2025 30-11-107.5 (3)(a.5) A H-25-1247 187 1 05/13/2025 30-11-107.5 (3)(a.7) N H-25-1247 187 1 05/13/2025 30-11-107.5 (3)(b)(II) A H-25-1247 187 1 05/13/2025 13 30-11-107.5 (3)(f)(I) A H-25-1247 187 1 05/13/2025 30-11-107.5 (3)(g) A H-25-1247 187 1 05/13/2025 30-11-107.5 (3)(h) N H-25-1247 187 1 05/13/2025 30-11-107.5 (4)(a) A H-25-1247 187 1 05/13/2025 4 30-11-129 (1)(b) A S-25-285 296 7 08/06/2025 2, 3, 4 30-11-133 N S-25-149 266 3 08/06/2025 4, 69 30-15-100.3 N S-25-275 377 256 08/06/2025 4, 192 30-15-101 (3) R S-25-275 377 336 08/06/2025 30-15-401.4 (2)(a.5) A S-25-146 342 6 06/02/2025 30-15-401.4 (3.5) A S-25-146 342 6 06/02/2025 30-15-401.4 (4)(c.5) R S-25-146 342 6 06/02/2025 2, 4 30-20-1202 (2) A H-25-1040 45 2 08/06/2025 4 30-26-300.3 N S-25-275 377 257 08/06/2025 4 30-26-301 (2)(c) A S-25-275 377 258 08/06/2025 2, 3, 4 30-28-106 (9) N S-25-149 266 4 08/06/2025 4 30-28-115 (2)(b)(II) A H-25-1184 210 11 08/06/2025 2 30-28-115 IP(3)(b)(I) A S-25-002 172 8 05/08/2025 2 30-28-115 (3)(b)(I)(A) A S-25-002 172 8 05/08/2025 2 30-28-115 (3)(b)(I)(B) A S-25-002 172 8 05/08/2025 2 30-28-115 (3)(b)(I.5) N S-25-002 172 8 05/08/2025 2 30-28-115 (3)(b)(II) A S-25-002 172 8 05/08/2025 2 30-28-115 (3)(b)(III) A S-25-002 172 8 05/08/2025 2, 3, 4 30-28-141 N S-25-149 266 5 08/06/2025 2, 17 30-28-204 A H-25-1030 8 2 01/01/2026 4 30-28-211 (2)(a.5) A H-25-1306 204 4 08/06/2025 3 30-28-211 (3.5)(g) N H-25-1269 216 1 05/20/2025 TITLE 31 Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date 3, 4 31-10-16 (entire part 16) N S-25-001 178 14 08/06/2025 4 31-15-401 (1)(r) N S-25-020 264 5 08/06/2025 4 31-15-401 (2) N S-25-020 264 5 08/06/2025 4 31-15-602 (2)(a.5) A H-25-1306 204 5 08/06/2025 3 31-15-602 (3.5)(f) N H-25-1269 216 2 05/20/2025 2, 17 31-15-604 N H-25-1030 8 3 01/01/2026 2 31-15-605 N H-25-1273 188 2 05/13/2025 4, 70 31-15-700.3 N S-25-275 377 259 08/06/2025 4, 193 31-15-716 (2) R S-25-275 377 336 08/06/2025 2, 3, 4 31-15-717 N S-25-149 266 6 08/06/2025 4 31-15-904 (1)(b) A S-25-285 296 8 08/06/2025 4, 71 31-15-1100.3 N S-25-275 377 260 08/06/2025 4, 194 31-15-1101 (4) R S-25-275 377 336 08/06/2025 4 31-23-201 A S-25-275 377 261 08/06/2025 4 31-23-203 IP(1) A S-25-275 377 262 08/06/2025 2, 3, 4 31-23-206 (9) N S-25-149 266 8 08/06/2025 2, 3, 4 31-23-228 N S-25-149 266 7 08/06/2025 2 31-23-301 IP(5)(b)(I) A S-25-002 172 9 05/08/2025 2 31-23-301 (5)(b)(I)(A) A S-25-002 172 9 05/08/2025 2 31-23-301 (5)(b)(I)(B) A S-25-002 172 9 05/08/2025 2 31-23-301 (5)(b)(I.5) N S-25-002 172 9 05/08/2025 2 31-23-301 (5)(b)(II) A S-25-002 172 9 05/08/2025 2 31-23-301 (5)(b)(III) A S-25-002 172 9 05/08/2025 4 31-23-303 (2)(b)(II) A H-25-1184 210 12 08/06/2025 4 31-25-200.3 N S-25-275 377 263 08/06/2025 4 31-25-201 (2) A S-25-275 377 264 08/06/2025 31-25-216 (1) A H-25-1029 31 1 03/26/2025 4 31-25-300.3 N S-25-275 377 265 08/06/2025 4 31-25-301 (2) A S-25-275 377 266 08/06/2025 4 31-25-901.5 N S-25-275 377 267 08/06/2025 4 31-25-902 A S-25-275 377 268 08/06/2025 4 31-25-903 A S-25-275 377 269 08/06/2025 4 31-25-904 (1) A S-25-275 377 270 08/06/2025 4 31-30.5-102 IP A S-25-275 377 271 08/06/2025 4, 72 31-30.5-102 (5) N S-25-275 377 271 08/06/2025 4, 195 31-30.5-103 (3) R S-25-275 377 336 08/06/2025 4 31-31-102 (5.5) N S-25-275 377 272 08/06/2025 4, 73 31-31.5-100.3 N S-25-275 377 273 08/06/2025 4, 196 31-31.5-101 (5) R S-25-275 377 336 08/06/2025 4 31-31.5-601 (1)(a) A S-25-275 377 274 08/06/2025 4 31-35-500.3 N S-25-275 377 275 08/06/2025 4 31-35-501 (1) A S-25-275 377 276 08/06/2025 TITLE 32 Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date 2, 4 32-1-103 (13.5) N H-25-1009 42 2 08/06/2025 2, 4 32-1-103 (14.3) N H-25-1009 42 2 08/06/2025 2, 4 32-1-103 (23.7) N H-25-1009 42 2 08/06/2025 4 32-1-104.5 (3)(a)(V) A H-25-1219 290 1 08/06/2025 4 32-1-104.5 (3)(a)(VIII) A H-25-1219 290 1 08/06/2025 4 32-1-104.5 (3)(a)(X) N H-25-1219 290 1 08/06/2025 4 32-1-104.5 (3)(a)(XI) N H-25-1219 290 1 08/06/2025 4 32-1-104.5 (3)(a)(XII) N H-25-1219 290 1 08/06/2025 4 32-1-104.5 (3)(a)(XIII) N H-25-1219 290 1 08/06/2025 4 32-1-104.5 (3)(a.5) N H-25-1219 290 1 08/06/2025 4 32-1-104.5 (4) N H-25-1219 290 1 08/06/2025 4 32-1-202 (2)(n) A H-25-1219 290 2 08/06/2025 4 32-1-202 (2)(o) N H-25-1219 290 2 08/06/2025 4, 74 32-1-900.3 N S-25-275 377 277 08/06/2025 4, 197 32-1-903 (5) R S-25-275 377 336 08/06/2025 4 32-1-903 (6)(a.5) N H-25-1219 290 3 08/06/2025 4 32-1-903 (6)(c) A H-25-1219 290 3 08/06/2025 4 32-1-909 (3) A S-25-275 377 278 08/06/2025 4 32-1-909 (4)(a) A S-25-275 377 278 08/06/2025 4 32-1-910 (3)(b) A S-25-275 377 279 08/06/2025 4 32-1-910 (3)(d)(II) A S-25-275 377 279 08/06/2025 4 32-1-910 (3)(d)(IV) A S-25-275 377 279 08/06/2025 4 32-1-910 (3)(e) A S-25-275 377 279 08/06/2025 4 32-1-910 (3)(f) A S-25-275 377 279 08/06/2025 2, 4 32-1-1002 (1)(i) N H-25-1009 42 3 08/06/2025 4 32-1-1003 (1)(c.5) A S-25-078 56 3 08/06/2025 2, 4 32-1-1004 (1)(e) N H-25-1009 42 4 08/06/2025 4 32-1-1006 (1)(g) A H-25-1211 177 1 08/06/2025 4 32-1-1006 (9) N H-25-1211 177 1 08/06/2025 4 32-1-1703 N H-25-1080 317 2 08/06/2025 4 32-8-101.5 IP A S-25-030 185 2 08/06/2025 4 32-8-101.5 (3) A S-25-030 185 2 08/06/2025 32-9-102 (2) N S-25-161 186 1 05/13/2025 32-9-109.5 (4) A S-25-161 186 6 05/13/2025 32-9-111 (5)(g) N S-25-161 186 7 05/13/2025 32-9-119 IP(1) A S-25-161 186 2 05/13/2025 32-9-119 (1)(y) A S-25-161 186 2 05/13/2025 32-9-119 (1)(z) N S-25-161 186 2 05/13/2025 32-9-119.7 (1) R S-25-161 186 3 05/13/2025 4 32-9-119.7 (2) A S-25-051 53 1 08/06/2025 32-9-119.7 (8) A S-25-161 186 3 05/13/2025 212 32-9-119.7 (9) N S-25-161 186 3 05/13/2025 212 32-9-119.7 (10) N S-25-161 186 3 05/13/2025 212 32-9-119.7 (11) N S-25-161 186 3 05/13/2025 212 32-9-119.7 (12) N S-25-161 186 3 05/13/2025 4 32-9-160 (1) A H-25-1290 353 4 08/06/2025 4, 145 32-9-160 (3) N H-25-1290 353 4 08/06/2025 32-9-160 (3) R S-25-310 359 9 06/02/2025 32-9-165 N S-25-161 186 4 05/13/2025 32-9-166 N S-25-161 186 4 05/13/2025 32-9-167 N S-25-161 186 4 05/13/2025 32-9-168 N S-25-161 186 4 05/13/2025 2, 4 32-20-103 IP A S-25-182 277 2 08/06/2025 2, 4 32-20-103 (4.5) N S-25-182 277 2 08/06/2025 2, 4 32-20-103 (7) A S-25-182 277 2 08/06/2025 TITLE 33 Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date 2, 8 33-1-102 (2) A S-25-053 223 2 01/01/2026 2, 8 33-1-102 (2.6) N S-25-053 223 2 01/01/2026 2, 8 33-1-102 (51) A S-25-053 223 2 01/01/2026 2, 4 33-3-110.5 N S-25-038 19 3 08/06/2025 2, 8 33-4-102 (1.4)(cc) N S-25-053 223 3 01/01/2026 4 33-4-102.7 (8) R S-25-049 198 1 08/06/2025 4 33-5-101.5 N S-25-275 377 280 08/06/2025 4 33-5-102 A S-25-275 377 281 08/06/2025 2, 8 33-6-109 IP(3) A S-25-053 223 4 01/01/2026 2, 3, 16 33-6-109 (3)(a) A S-25-168 355 2 07/01/2026 2, 3, 16, 59 33-6-109 (3)(b) A S-25-168 355 2 07/01/2026 2, 8, 59 33-6-109 (3)(b) A S-25-053 223 4 01/01/2026 2, 8 33-6-109 (3.4)(a)(VII) A S-25-053 223 4 01/01/2026 2, 8 33-6-109 (3.4)(a)(VIII) N S-25-053 223 4 01/01/2026 2, 3, 16, 59 33-6-110 IP(1) A S-25-168 355 3 07/01/2026 2, 8, 59 33-6-110 IP(1) A S-25-053 223 5 01/01/2026 2, 3, 16, 59 33-6-110 (1)(a) A S-25-168 355 3 07/01/2026 2, 8, 59 33-6-110 (1)(a) A S-25-053 223 5 01/01/2026 2, 3, 16 33-6-110 (1)(b) A S-25-168 355 3 07/01/2026 4 33-6-113 (1)(b) A S-25-174 310 9 08/06/2025 2, 3, 16 33-6-113 IP(2) A S-25-168 355 4 07/01/2026 2, 3, 16 33-6-113 (2)(a) A S-25-168 355 4 07/01/2026 2, 3, 16 33-6-113.1 N S-25-168 355 5 07/01/2026 2, 3, 16 33-6-117 (1)(b)(I) A S-25-168 355 6 07/01/2026 33-9-115 N S-25-003 68 3 04/10/2025 2 33-9-116 N H-25-1215 312 10 05/30/2025 2, 4 33-12-103.8 N H-25-1163 289 2 08/06/2025 4 33-13-116 A S-25-300 428 49 08/06/2025 TITLE 34 Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date 1, 2, 4 34-32-103 IP A S-25-054 200 3 08/06/2025 1, 2, 4 34-32-103 (2.5) N S-25-054 200 3 08/06/2025 1, 2, 4 34-32-103 (5.9) N S-25-054 200 3 08/06/2025 1, 2, 4 34-32-103 (8) A S-25-054 200 3 08/06/2025 1, 2, 4 34-32-110 (9) N S-25-054 200 4 08/06/2025 1, 2, 4 34-32-112 IP(1) A S-25-054 200 5 08/06/2025 1, 2, 4 34-32-112 (1)(a) R S-25-054 200 5 08/06/2025 1, 2, 4 34-32-115 (2) A S-25-054 200 6 08/06/2025 1, 2, 4 34-32-116 (7)(e) A S-25-054 200 7 08/06/2025 1, 2, 4 34-32-117 (3)(b) A S-25-054 200 8 08/06/2025 1, 2, 4 34-32-117 (3)(d)(II) A S-25-054 200 8 08/06/2025 1, 2, 4 34-32-117 (3)(f)(IV) A S-25-054 200 8 08/06/2025 1, 2, 4 34-32-117 (3)(f)(V)(A) A S-25-054 200 8 08/06/2025 1, 2, 4 34-32-117 (3)(f)(V)(C) R S-25-054 200 8 08/06/2025 1, 2, 4 34-32-117 (3)(f)(V)(D) R S-25-054 200 8 08/06/2025 1, 2, 4 34-32-117 (3)(f)(V)(E) R S-25-054 200 8 08/06/2025 1, 2, 4 34-32-117 (4)(c)(II) A S-25-054 200 8 08/06/2025 1, 2, 4 34-32-117 (6)(a) A S-25-054 200 8 08/06/2025 1, 2, 4 34-32-117 (6)(b)(I) A S-25-054 200 8 08/06/2025 1, 2, 4 34-32-117 (6)(c) A S-25-054 200 8 08/06/2025 1, 2, 4 34-32-117 (6)(e) A S-25-054 200 8 08/06/2025 1, 2, 4 34-32-117 (6)(f) A S-25-054 200 8 08/06/2025 1, 2, 4 34-32-117 (6)(g) A S-25-054 200 8 08/06/2025 1, 2, 4 34-32-117 (8) R S-25-054 200 8 08/06/2025 1, 2, 4 34-32-118 (4)(b) R S-25-054 200 9 08/06/2025 1, 2, 4 34-32-118 (4)(c) R S-25-054 200 9 08/06/2025 1, 2, 4 34-32-118 (5) A S-25-054 200 9 08/06/2025 1, 2, 4 34-32-122 (1)(a) A S-25-054 200 10 08/06/2025 1, 2, 4 34-32-122 (2) A S-25-054 200 10 08/06/2025 1, 2, 4, 135 34-32-124.5 (1)(b) A S-25-054 200 11 08/06/2025 4, 135 34-32-124.5 (1)(b) A S-25-300 428 50 08/06/2025 1, 2, 4 34-32-127 (2)(a)(I)(A) A S-25-054 200 12 08/06/2025 1, 2, 4 34-32.5-112 IP(1)(b) A S-25-054 200 13 08/06/2025 1, 2, 4 34-32.5-112 (1)(b)(I) R S-25-054 200 13 08/06/2025 1, 2, 4 34-32.5-115 (2) A S-25-054 200 14 08/06/2025 1, 2, 4 34-32.5-116 IP(4) A S-25-054 200 15 08/06/2025 1, 2, 4 34-32.5-116 (4)(f) A S-25-054 200 15 08/06/2025 1, 2, 4 34-32.5-117 (3)(b) A S-25-054 200 16 08/06/2025 1, 2, 4 34-32.5-117 (3)(d)(II) A S-25-054 200 16 08/06/2025 1, 2, 4 34-32.5-117 (3)(f)(IV) A S-25-054 200 16 08/06/2025 1, 2, 4 34-32.5-117 (3)(f)(V)(A) A S-25-054 200 16 08/06/2025 1, 2, 4 34-32.5-117 (3)(f)(V)(C) R S-25-054 200 16 08/06/2025 1, 2, 4 34-32.5-117 (3)(f)(V)(D) R S-25-054 200 16 08/06/2025 1, 2, 4 34-32.5-117 (3)(f)(V)(E) R S-25-054 200 16 08/06/2025 1, 2, 4 34-32.5-117 (3)(f)(VI) R S-25-054 200 16 08/06/2025 1, 2, 4 34-32.5-117 (3)(f)(VII) R S-25-054 200 16 08/06/2025 1, 2, 4 34-32.5-117 (4)(c)(II) A S-25-054 200 16 08/06/2025 1, 2, 4 34-32.5-117 (6)(a) A S-25-054 200 16 08/06/2025 1, 2, 4 34-32.5-117 (6)(b) A S-25-054 200 16 08/06/2025 1, 2, 4 34-32.5-117 (6)(c) A S-25-054 200 16 08/06/2025 1, 2, 4 34-32.5-117 (6)(e) A S-25-054 200 16 08/06/2025 1, 2, 4 34-32.5-117 (6)(f) A S-25-054 200 16 08/06/2025 1, 2, 4 34-32.5-117 (6)(g) A S-25-054 200 16 08/06/2025 1, 2, 4 34-32.5-117 (8) R S-25-054 200 16 08/06/2025 1, 2, 4 34-32.5-118 (4)(b) R S-25-054 200 17 08/06/2025 1, 2, 4 34-32.5-118 (4)(c) R S-25-054 200 17 08/06/2025 1, 2, 4 34-32.5-118 (5) A S-25-054 200 17 08/06/2025 1, 2, 4 34-32.5-122 A S-25-054 200 18 08/06/2025 2, 4 34-60-101 A H-25-1165 257 2 08/06/2025 2, 4 34-60-103 (40.5) N H-25-1165 257 3 08/06/2025 2, 4 34-60-106 (9)(c)(II) A H-25-1165 257 5 08/06/2025 2, 4 34-60-106 (9)(c)(IV)(D) A H-25-1165 257 5 08/06/2025 2, 4 34-60-106 (9)(c)(IV)(D.5) R H-25-1165 257 5 08/06/2025 2, 4 34-60-106 (9)(e)(VI) R H-25-1165 257 5 08/06/2025 2, 4 34-60-106 (9.4) N H-25-1165 257 5 08/06/2025 34-60-122 (5)(f) N S-25-307 382 3 06/03/2025 4 34-60-132 (1)(t) A S-25-275 377 207 08/06/2025 2, 4 34-60-140 IP(2)(a)(II) A H-25-1165 257 6 08/06/2025 2, 4 34-60-144 N H-25-1165 257 4 08/06/2025 TITLE 35 Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date 4 35-1-102 IP A H-25-1084 24 1 08/06/2025 4 35-1-102 (1) A H-25-1084 24 1 08/06/2025 4 35-1-106 (1)(e) A H-25-1084 24 2 08/06/2025 2 35-1-106.3 (4) A S-25-317 385 46 06/03/2025 2 35-1-106.3 (4.5) N S-25-317 385 46 06/03/2025 35-1-106.9 A S-25-264 129 41 04/25/2025 4 35-1-109 A H-25-1084 24 3 08/06/2025 4 35-1-119 (2) R H-25-1283 225 1 08/06/2025 4 35-1.2-103 (3) R S-25-300 428 51 08/06/2025 2 35-1.2-105 (2) A S-25-317 385 47 06/03/2025 4 35-2-101 A H-25-1084 24 4 08/06/2025 4 35-2-102 A H-25-1084 24 5 08/06/2025 4 35-2-103 A H-25-1084 24 6 08/06/2025 4 35-2-104 A H-25-1084 24 7 08/06/2025 4 35-3-103 A S-25-275 377 282 08/06/2025 4 35-3-104 (1) A S-25-275 377 283 08/06/2025 4 35-3-109 A H-25-1084 24 8 08/06/2025 4 35-3.5-102 (7) A H-25-1084 24 9 08/06/2025 4 35-4-107 (3) A H-25-1084 24 10 08/06/2025 4 35-4-109 A H-25-1084 24 11 08/06/2025 4 35-4-113.5 A H-25-1084 24 12 08/06/2025 4 35-4-116 A H-25-1084 24 13 08/06/2025 4 35-5-101 IP A H-25-1084 24 14 08/06/2025 4 35-5-101 (12) A H-25-1084 24 14 08/06/2025 4 35-5-101 (12.1) A H-25-1084 24 14 08/06/2025 4 35-5-104 (1) A H-25-1084 24 15 08/06/2025 4 35-5-104 (5) A H-25-1084 24 15 08/06/2025 4 35-5-104 (8) A H-25-1084 24 15 08/06/2025 4 35-5-106 A H-25-1084 24 16 08/06/2025 4 35-5-108 (4) A H-25-1084 24 17 08/06/2025 4 35-5-108 (6)(b) A H-25-1084 24 17 08/06/2025 4 35-5-110 A H-25-1084 24 18 08/06/2025 4 35-5-111 (1) A H-25-1084 24 19 08/06/2025 4 35-5-113 A H-25-1084 24 20 08/06/2025 4 35-5-117 (1) A H-25-1084 24 21 08/06/2025 4 35-5-120 (4) A H-25-1084 24 22 08/06/2025 4 35-5.5-103 IP A H-25-1084 24 23 08/06/2025 4 35-5.5-103 (4) A H-25-1084 24 23 08/06/2025 4 35-5.5-107 (3) A H-25-1084 24 24 08/06/2025 4 35-5.5-108.7 (1)(e) A H-25-1084 24 25 08/06/2025 4 35-7-101.5 N S-25-275 377 284 08/06/2025 4 35-7-102 A S-25-275 377 285 08/06/2025 35-7-103 (3) N S-25-264 129 42 04/25/2025 4 35-7-110 A H-25-1084 24 26 08/06/2025 4 35-7-112 (2) A H-25-1084 24 27 08/06/2025 4 35-7-114 A H-25-1084 24 28 08/06/2025 4 35-7-115 A H-25-1084 24 29 08/06/2025 4 35-7-116 A H-25-1084 24 30 08/06/2025 35-7-118 N S-25-207 109 1 04/25/2025 4 35-9-103 (5) A H-25-1084 24 31 08/06/2025 4 35-9-103 (10) A H-25-1084 24 31 08/06/2025 4 35-9-108 (2) A H-25-1084 24 32 08/06/2025 4 35-9-108 IP(5) A H-25-1084 24 32 08/06/2025 4 35-9-108 IP(6) A H-25-1084 24 32 08/06/2025 4 35-9-108 (7) A H-25-1084 24 32 08/06/2025 4 35-9-111 IP(1) A H-25-1084 24 33 08/06/2025 4 35-9-112 IP(3) A H-25-1084 24 34 08/06/2025 4 35-9-112 (4) A H-25-1084 24 34 08/06/2025 4 35-9-115 (4) A H-25-1084 24 35 08/06/2025 4 35-9-118 IP(2) A H-25-1084 24 36 08/06/2025 4 35-9-118 (2)(c)(I) A H-25-1084 24 36 08/06/2025 4 35-9-119 (1) A H-25-1084 24 37 08/06/2025 4 35-9-119 (2)(b) A H-25-1084 24 37 08/06/2025 4 35-9-119 (3) A H-25-1084 24 37 08/06/2025 4 35-9-120 IP(2) A H-25-1084 24 38 08/06/2025 4 35-9-120 (2)(c) A H-25-1084 24 38 08/06/2025 4 35-9-121 (1) A H-25-1084 24 39 08/06/2025 4 35-9-121 (2)(a) A H-25-1084 24 39 08/06/2025 4 35-9-121 (2)(b)(I) A H-25-1084 24 39 08/06/2025 4 35-9-121 (3) A H-25-1084 24 39 08/06/2025 4 35-9-123 (4) A H-25-1084 24 40 08/06/2025 4 35-9-123 (5) A H-25-1084 24 40 08/06/2025 4 35-10-103 (5) A H-25-1084 24 41 08/06/2025 4 35-10-103 (9) A H-25-1084 24 41 08/06/2025 4 35-10-106 (1)(c) A H-25-1084 24 42 08/06/2025 4 35-10-106 (3)(a) A H-25-1084 24 42 08/06/2025 4 35-10-110 (4) A H-25-1084 24 43 08/06/2025 4 35-10-112 (1)(b) A H-25-1084 24 44 08/06/2025 4 35-10-115 (1)(a) A H-25-1084 24 45 08/06/2025 4 35-10-115 (1)(c) A H-25-1084 24 45 08/06/2025 4 35-10-115 (3) A H-25-1084 24 45 08/06/2025 4 35-10-116 (2) A H-25-1084 24 46 08/06/2025 4 35-10-117 IP(3) A H-25-1084 24 47 08/06/2025 4 35-10-117 (3)(a) A H-25-1084 24 47 08/06/2025 4 35-10-117 (3)(c)(II) A H-25-1084 24 47 08/06/2025 4 35-10-117 (5) A H-25-1084 24 47 08/06/2025 4 35-10-119 (2) A H-25-1084 24 48 08/06/2025 4 35-10-119 (3) A H-25-1084 24 48 08/06/2025 4 35-10-119 (5) A H-25-1084 24 48 08/06/2025 4 35-10-120 (1) A H-25-1084 24 49 08/06/2025 4 35-10-120 (3) A H-25-1084 24 49 08/06/2025 4 35-10-125 IP(2) A H-25-1084 24 50 08/06/2025 4 35-10-125 (2)(a) A H-25-1084 24 50 08/06/2025 4 35-11-102 IP A H-25-1084 24 51 08/06/2025 4 35-11-102 (4) A H-25-1084 24 51 08/06/2025 4 35-11-102 (12) A H-25-1084 24 51 08/06/2025 4 35-11-105 (2) A H-25-1084 24 52 08/06/2025 4 35-11-106 (2) A H-25-1084 24 53 08/06/2025 4 35-11-111 (2) A H-25-1084 24 54 08/06/2025 4 35-11-111 (3) A H-25-1084 24 54 08/06/2025 4 35-14-106 A H-25-1084 24 55 08/06/2025 4 35-14-107 (1)(k) A H-25-1084 24 56 08/06/2025 4 35-14-107 (1)(m) A H-25-1084 24 56 08/06/2025 4 35-14-108 IP(1) A H-25-1084 24 57 08/06/2025 4 35-14-108 (1)(a) A H-25-1084 24 57 08/06/2025 4 35-14-108 (1)(d) A H-25-1084 24 57 08/06/2025 4 35-14-108 (2) A H-25-1084 24 57 08/06/2025 4 35-14-110 A H-25-1084 24 58 08/06/2025 4 35-14-121 (3) A H-25-1084 24 59 08/06/2025 4 35-14-121 (4) A H-25-1084 24 59 08/06/2025 4 35-14-121 IP(6) A H-25-1084 24 59 08/06/2025 4 35-14-121 (6)(a) A H-25-1084 24 59 08/06/2025 4 35-14-121 (6)(b) A H-25-1084 24 59 08/06/2025 4 35-14-122 (6)(a) A H-25-1084 24 60 08/06/2025 4 35-14-131 (5)(a) A H-25-1084 24 61 08/06/2025 4 35-14-132 (1) A H-25-1084 24 62 08/06/2025 4 35-14-133 (3) A H-25-1084 24 63 08/06/2025 4 35-14-134 A S-25-300 428 52 08/06/2025 4 35-23-103 A H-25-1084 24 64 08/06/2025 4 35-23-105 A H-25-1084 24 65 08/06/2025 4 35-23-106 A H-25-1084 24 66 08/06/2025 4 35-23-108 A H-25-1084 24 67 08/06/2025 4 35-23-109 A H-25-1084 24 68 08/06/2025 4 35-23-112 A H-25-1084 24 69 08/06/2025 4 35-23-115 A H-25-1084 24 70 08/06/2025 4 35-24.5-104 (2) A H-25-1084 24 71 08/06/2025 4 35-24.5-104 (3) A H-25-1084 24 71 08/06/2025 4 35-25-103 (1) A H-25-1084 24 72 08/06/2025 4 35-25-103 (2)(a) A H-25-1084 24 72 08/06/2025 4 35-25-103 (4) A H-25-1084 24 72 08/06/2025 4 35-25-103 (5)(d) A H-25-1084 24 72 08/06/2025 4 35-25-103 (6) A H-25-1084 24 72 08/06/2025 4 35-25-105 (2) A H-25-1084 24 73 08/06/2025 4 35-25-106 (1) A H-25-1084 24 74 08/06/2025 4 35-25-107 A H-25-1084 24 75 08/06/2025 4 35-26-105 (2) A H-25-1084 24 76 08/06/2025 4 35-26-108 (2) A H-25-1084 24 77 08/06/2025 4 35-26-110 (1.5) A H-25-1084 24 78 08/06/2025 4 35-26-111 A H-25-1084 24 79 08/06/2025 4 35-26-113 (1) A H-25-1084 24 80 08/06/2025 4 35-26-114 (3)(a) A H-25-1084 24 81 08/06/2025 4 35-26-114 (4) A H-25-1084 24 81 08/06/2025 4 35-26-114 (5) A H-25-1084 24 81 08/06/2025 4 35-26-114 (6) A H-25-1084 24 81 08/06/2025 4 35-26-114 (7)(e) A H-25-1084 24 81 08/06/2025 4 35-27-122 (2)(c) A H-25-1084 24 82 08/06/2025 4 35-27-122 IP(2)(f) A H-25-1084 24 82 08/06/2025 4 35-27-122 (2)(f)(III) A H-25-1084 24 82 08/06/2025 4 35-27.3-107 (2)(c) A H-25-1084 24 83 08/06/2025 4 35-28-104 (2) A H-25-1084 24 84 08/06/2025 4 35-28-104 (3) A H-25-1084 24 84 08/06/2025 4 35-28-104 (13) A H-25-1084 24 84 08/06/2025 4 35-28-105 (2) A H-25-1084 24 85 08/06/2025 4 35-28-105 (3) A H-25-1084 24 85 08/06/2025 4 35-28-105 (4) A H-25-1084 24 85 08/06/2025 4 35-28-106 IP(1) A H-25-1084 24 86 08/06/2025 4 35-28-106 (1)(a) A H-25-1084 24 86 08/06/2025 4 35-28-106 IP(2) A H-25-1084 24 86 08/06/2025 4 35-28-107 IP(2) A H-25-1084 24 87 08/06/2025 4 35-28-107 (2)(e) A H-25-1084 24 87 08/06/2025 4 35-28-111 A H-25-1084 24 88 08/06/2025 4 35-28-114 (2) A H-25-1084 24 89 08/06/2025 4 35-28-116 (3) A H-25-1084 24 90 08/06/2025 4 35-28-116 (4) A H-25-1084 24 90 08/06/2025 4 35-28-116 (5) A H-25-1084 24 90 08/06/2025 4 35-28-116 (6) A H-25-1084 24 90 08/06/2025 4 35-28-119 (1) A H-25-1084 24 91 08/06/2025 4 35-28-119 (2) A H-25-1084 24 91 08/06/2025 4 35-28-119 (4) A H-25-1084 24 91 08/06/2025 4 35-28-120 (1) A H-25-1084 24 92 08/06/2025 4 35-28-121 (2) A H-25-1084 24 93 08/06/2025 4 35-29-103 (1) A H-25-1084 24 94 08/06/2025 4 35-29-103 (3) A H-25-1084 24 94 08/06/2025 4 35-30-101 A H-25-1084 24 95 08/06/2025 4 35-30-102 A H-25-1084 24 96 08/06/2025 4 35-33-103 IP A H-25-1084 24 97 08/06/2025 4 35-33-103 (3) A H-25-1084 24 97 08/06/2025 4 35-33-104 (6) A H-25-1084 24 98 08/06/2025 4 35-33-105 A H-25-1084 24 99 08/06/2025 4 35-36-102 (7) A S-25-176 218 6 08/06/2025 4 35-36-102 (24.5) N S-25-176 218 8 08/06/2025 4 35-36-102 IP(34) A S-25-176 218 3 08/06/2025 4 35-36-102 (34)(c) A S-25-176 218 3 08/06/2025 4 35-36-103 (1)(c) N S-25-176 218 4 08/06/2025 4 35-36-105 (5) A S-25-176 218 7 08/06/2025 4 35-36-109 A S-25-176 218 2 08/06/2025 4 35-36-216 (1)(c)(III) N S-25-176 218 9 08/06/2025 4 35-36-304 (1)(c)(III) N S-25-176 218 10 08/06/2025 4 35-36-313 (1)(m) A S-25-176 218 5 08/06/2025 4 35-38-104 IP(2)(b) A H-25-1084 24 100 08/06/2025 4 35-38-104 (2)(b)(IV) A H-25-1084 24 100 08/06/2025 4 35-40-115 (4) A H-25-1084 24 101 08/06/2025 4 35-40-115 (5)(d) A H-25-1084 24 101 08/06/2025 4 35-40-115 (6) A H-25-1084 24 101 08/06/2025 4 35-41-101 (2) A H-25-1084 24 102 08/06/2025 4 35-42-103 (3.5) N S-25-275 377 286 08/06/2025 4 35-42-103 (4) A H-25-1084 24 103 08/06/2025 4 35-42-105 A S-25-275 377 287 08/06/2025 4 35-42-107 (5) A H-25-1084 24 104 08/06/2025 4 35-42-107 (6) A H-25-1084 24 104 08/06/2025 4 35-42-108 (1) A H-25-1084 24 105 08/06/2025 4 35-42-109 (5)(a) A H-25-1084 24 106 08/06/2025 4 35-42-109 (5)(c) A H-25-1084 24 106 08/06/2025 4 35-42-109 (5)(e) A H-25-1084 24 106 08/06/2025 4 35-42-109 (8) A H-25-1084 24 106 08/06/2025 4 35-42-110 A H-25-1084 24 107 08/06/2025 4 35-42-111 (1) A H-25-1084 24 108 08/06/2025 4 35-42-111 (3) A H-25-1084 24 108 08/06/2025 4 35-42-112 (1) A H-25-1084 24 109 08/06/2025 4 35-42-112 (2)(a) A H-25-1084 24 109 08/06/2025 4 35-42-112 (3) A H-25-1084 24 109 08/06/2025 4 35-42-113 (1) A H-25-1299 227 1 08/06/2025 4 35-42-115 (3) A H-25-1084 24 110 08/06/2025 4 35-42.5-101 (1)(a)(III) A H-25-1084 24 111 08/06/2025 4 35-43-105 (2) A H-25-1084 24 112 08/06/2025 4 35-43-116 A H-25-1084 24 113 08/06/2025 4 35-43-117 A H-25-1084 24 114 08/06/2025 4 35-43-120 (1) A H-25-1084 24 115 08/06/2025 4 35-43-130 (1) A H-25-1084 24 116 08/06/2025 4 35-43-203 (1)(f) A H-25-1084 24 117 08/06/2025 4 35-43-208 A H-25-1084 24 118 08/06/2025 4 35-43-210 A H-25-1084 24 119 08/06/2025 4 35-44-102 A H-25-1084 24 120 08/06/2025 4 35-44-103 A H-25-1084 24 121 08/06/2025 4 35-44-104 A H-25-1084 24 122 08/06/2025 4 35-44-105 A H-25-1084 24 123 08/06/2025 4 35-44-107 A H-25-1084 24 124 08/06/2025 4 35-44-111 A H-25-1084 24 125 08/06/2025 4 35-45-103 (1) A H-25-1084 24 126 08/06/2025 4 35-45-109 (1) A H-25-1084 24 127 08/06/2025 4 35-46-102 (2) A H-25-1084 24 128 08/06/2025 4 35-46-103 A H-25-1084 24 129 08/06/2025 4 35-46-104 A H-25-1084 24 130 08/06/2025 4 35-46-106 A H-25-1084 24 131 08/06/2025 4 35-46-113 A H-25-1084 24 132 08/06/2025 4 35-47-102 A H-25-1084 24 133 08/06/2025 4 35-48-103 (2) A H-25-1084 24 134 08/06/2025 4 35-50-103 IP A H-25-1084 24 135 08/06/2025 4 35-50-103 (12) A H-25-1084 24 135 08/06/2025 4 35-50-109 (10) A H-25-1084 24 136 08/06/2025 35-50-114 (3) A S-25-264 129 43 04/25/2025 35-50-115 (4) N S-25-264 129 44 04/25/2025 4 35-52-113 (1) A H-25-1084 24 140 08/06/2025 4 35-52-114 A H-25-1084 24 137 08/06/2025 4 35-53-102 A H-25-1084 24 138 08/06/2025 4 35-53-111 (1) A H-25-1084 24 139 08/06/2025 4 35-53-115 (1) A H-25-1084 24 141 08/06/2025 4 35-53-116 A H-25-1084 24 142 08/06/2025 4 35-53-117 A H-25-1084 24 143 08/06/2025 4 35-53-118 A H-25-1084 24 144 08/06/2025 4 35-53-122 A H-25-1084 24 145 08/06/2025 4 35-53-126 A H-25-1084 24 146 08/06/2025 4 35-53-128 (1) A H-25-1084 24 147 08/06/2025 4 35-53-132 A H-25-1084 24 148 08/06/2025 4 35-53.5-108 (2) A H-25-1084 24 149 08/06/2025 4 35-53.5-110 (3)(a) A H-25-1084 24 150 08/06/2025 4 35-54-103 (2) A H-25-1084 24 151 08/06/2025 4 35-54-104 A H-25-1084 24 152 08/06/2025 4 35-54-105 (1) A H-25-1084 24 153 08/06/2025 4 35-55-107 IP(1) A H-25-1084 24 154 08/06/2025 4 35-55-107 (1)(c) A H-25-1084 24 154 08/06/2025 4 35-55-111 A H-25-1084 24 155 08/06/2025 4 35-55-114 A H-25-1084 24 156 08/06/2025 4 35-56-101 A H-25-1084 24 157 08/06/2025 4 35-56-102 A H-25-1084 24 158 08/06/2025 4 35-56-103 A H-25-1084 24 159 08/06/2025 4 35-57.5-106 IP(1) A H-25-1084 24 160 08/06/2025 4 35-57.5-106 (1)(d) A H-25-1084 24 160 08/06/2025 4 35-57.5-112 A H-25-1084 24 161 08/06/2025 4 35-57.5-116 (3) A H-25-1084 24 162 08/06/2025 4 35-57.5-119 (5) A H-25-1084 24 163 08/06/2025 4 35-57.9-103 IP(5) A H-25-1084 24 164 08/06/2025 4 35-57.9-103 (5)(a) A H-25-1084 24 164 08/06/2025 4 35-57.9-104 A H-25-1084 24 165 08/06/2025 4 35-60-103 (1) A H-25-1084 24 166 08/06/2025 4 35-60-112 (1) A H-25-1084 24 167 08/06/2025 4 35-60-112 (3) A H-25-1084 24 167 08/06/2025 4 35-60-115 A H-25-1084 24 168 08/06/2025 4 35-61-101 (6.5) N S-25-275 377 288 08/06/2025 4 35-61-103 (1)(c) A H-25-1084 24 169 08/06/2025 4 35-61-106 (1) A S-25-275 377 289 08/06/2025 4 35-61-110 (6)(a) A H-25-1084 24 170 08/06/2025 4 35-61-114 (1) A H-25-1084 24 171 08/06/2025 4 35-65-401 (8.5) A H-25-1084 24 172 08/06/2025 4 35-66-101 (4) R H-25-1283 225 2 08/06/2025 4 35-66-101 (5) R H-25-1283 225 2 08/06/2025 4 35-66-101 (6) A H-25-1283 225 2 08/06/2025 4 35-66-101 (7) R H-25-1283 225 2 08/06/2025 4 35-66-101 (9) R H-25-1283 225 2 08/06/2025 4 35-66-102 R H-25-1283 225 3 08/06/2025 4 35-66-103 (1) A H-25-1283 225 4 08/06/2025 4 35-66-104 (1)(b) A H-25-1283 225 5 08/06/2025 4 35-66-104 (2)(b)(II) R H-25-1283 225 5 08/06/2025 4 35-66-104 (4) A H-25-1283 225 5 08/06/2025 4 35-66-106 R H-25-1283 225 3 08/06/2025 4 35-66-107 R H-25-1283 225 3 08/06/2025 4 35-66-108 N H-25-1283 225 6 08/06/2025 4 35-66-109 N H-25-1283 225 6 08/06/2025 4 35-66-110 N H-25-1283 225 6 08/06/2025 4, 75 35-70-102.8 N S-25-275 377 290 08/06/2025 4 35-70-103 IP(1)(a) A S-25-275 377 291 08/06/2025 4 35-70-103 (3)(a) A H-25-1084 24 173 08/06/2025 4, 198 35-70-104 (4)(a)(I) R S-25-275 377 336 08/06/2025 4 35-70-104 (4)(a)(II)(A) A S-25-275 377 292 08/06/2025 4 35-70-107 (1)(a)(I) A S-25-275 377 293 08/06/2025 4 35-70-107 (3) A H-25-1084 24 174 08/06/2025 4 35-70-107 (4) A H-25-1084 24 174 08/06/2025 4 35-70-110 (1) A H-25-1084 24 175 08/06/2025 4 35-70-110 (6) A H-25-1084 24 175 08/06/2025 4 35-70-115 (1)(a) A H-25-1084 24 176 08/06/2025 4 35-70-115 (3) A H-25-1084 24 176 08/06/2025 4 35-70-115 (7)(f) A H-25-1084 24 176 08/06/2025 4 35-72-102 (2) A H-25-1084 24 177 08/06/2025 4 35-72-102 (3) A H-25-1084 24 177 08/06/2025 4 35-72-103 (2) A H-25-1084 24 178 08/06/2025 4 35-72-105 (2) A H-25-1084 24 179 08/06/2025 4 35-72-106 A H-25-1084 24 180 08/06/2025 4 35-75-105 (1)(a) A H-25-1084 24 181 08/06/2025 4 35-75-105 (4) A H-25-1084 24 181 08/06/2025 4 35-75-119 A H-25-1084 24 182 08/06/2025 4 35-75-122 A H-25-1084 24 183 08/06/2025 3, 4 35-80-108 IP(1) A H-25-1180 226 1 08/06/2025 3, 4 35-80-108 (1)(m) A H-25-1180 226 1 08/06/2025 3, 4 35-80-108 (1)(n) A H-25-1180 226 1 08/06/2025 3, 4 35-80-108 (1)(o) N H-25-1180 226 1 08/06/2025 4 35-80-108 (3) A H-25-1084 24 184 08/06/2025 4 35-80-110 (1) A H-25-1084 24 185 08/06/2025 4 35-80-110 (2) A H-25-1084 24 185 08/06/2025 4 35-80-110 (4) A H-25-1084 24 185 08/06/2025 4 35-80-110 (5)(d)(I) A H-25-1084 24 185 08/06/2025 4 35-80-111 (2)(a) A H-25-1084 24 186 08/06/2025 3, 4 35-80-114 A H-25-1180 226 2 08/06/2025 4 35-80-115 (3) A H-25-1084 24 187 08/06/2025 2, 4 35-80-116.5 IP(2)(a) A H-25-1137 79 2 08/06/2025 2, 4 35-80-116.5 (2)(a)(II) A H-25-1137 79 2 08/06/2025 2, 4 35-80-116.5 (2)(a)(IV) A H-25-1137 79 2 08/06/2025 2, 4 35-80-116.5 (2)(a)(VI) A H-25-1137 79 2 08/06/2025 2, 4 35-80-116.5 (2)(a)(VII) A H-25-1137 79 2 08/06/2025 2, 4 35-80-116.5 (2)(a)(VIII) A H-25-1137 79 2 08/06/2025 2, 4 35-80-116.5 (2)(a)(IX) N H-25-1137 79 2 08/06/2025 2, 4 35-80-116.5 (2)(a)(X) N H-25-1137 79 2 08/06/2025 2, 4 35-80-116.5 (2)(a)(XI) N H-25-1137 79 2 08/06/2025 2, 4 35-80-116.5 (3)(d) N H-25-1137 79 2 08/06/2025 2, 4 35-80-116.5 (3)(e) N H-25-1137 79 2 08/06/2025 2, 4 35-80-116.5 (4.5) N H-25-1137 79 2 08/06/2025 2, 4 35-80-116.5 (5)(c.5) N H-25-1137 79 2 08/06/2025 2, 4 35-80-116.5 (5)(e) A H-25-1137 79 2 08/06/2025 2, 4 35-80-116.5 (8) N H-25-1137 79 2 08/06/2025 2, 4 35-80-116.5 (9) N H-25-1137 79 2 08/06/2025 4 35-82- (entire article 82) N S-25-085 95 1 08/06/2025 TITLE 36 Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date 2, 4 36-1-100.3 IP A H-25-1332 184 2 08/06/2025 2, 4 36-1-100.3 (1.5) N H-25-1332 184 2 08/06/2025 2, 4 36-1-100.3 (1.7) N H-25-1332 184 2 08/06/2025 2, 4 36-1-100.3 (2.4) N H-25-1332 184 2 08/06/2025 2, 4 36-1-100.3 (2.5) N H-25-1332 184 2 08/06/2025 2, 4 36-1-100.3 (2.6) N H-25-1332 184 2 08/06/2025 2, 4 36-1-100.3 (2.7) N H-25-1332 184 2 08/06/2025 2, 4 36-1-100.3 (5.5) N H-25-1332 184 2 08/06/2025 2, 4 36-1-100.3 (8) N H-25-1332 184 2 08/06/2025 2, 4 36-1-152.3 N H-25-1332 184 3 08/06/2025 2, 4 36-1-152.5 N H-25-1332 184 3 08/06/2025 2, 4 36-1-152.7 N H-25-1332 184 3 08/06/2025 4 36-7-100.3 N S-25-275 377 294 08/06/2025 4 36-7-103 (1) A S-25-275 377 295 08/06/2025 TITLE 37 Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date 4 37-4-100.3 N S-25-275 377 296 08/06/2025 4 37-4-101 A S-25-275 377 297 08/06/2025 3, 4 37-41-107 (5) A S-25-140 58 1 08/06/2025 3, 4 37-41-108 A S-25-140 58 2 08/06/2025 3, 4 37-41-113 (4) A S-25-140 58 3 08/06/2025 3, 4 37-41-161 N S-25-140 58 4 08/06/2025 4, 76 37-42-100.3 N S-25-275 377 298 08/06/2025 4, 199 37-42-114 (1) R S-25-275 377 336 08/06/2025 4, 77 37-48-101.3 A S-25-275 377 299 08/06/2025 4, 200 37-48-108 (4) R S-25-275 377 336 08/06/2025 4 37-48-136 A S-25-275 377 300 08/06/2025 2, 4 37-60-106 IP(1) A H-25-1115 194 2 08/06/2025 2, 4 37-60-106 (1)(v) N H-25-1115 194 2 08/06/2025 2 37-60-122.8 (4) N H-25-1215 312 11 05/30/2025 37-60-124 (1) R S-25-283 199 18 05/15/2025 37-60-124 IP(2) A S-25-283 199 18 05/15/2025 37-60-124 (3) A S-25-283 199 18 05/15/2025 37-60-126 (1)(c) R S-25-283 199 19 05/15/2025 37-60-126 (1)(d) R S-25-283 199 19 05/15/2025 37-60-126 (2)(a) A S-25-283 199 19 05/15/2025 37-60-126 (2)(b) A S-25-283 199 19 05/15/2025 37-60-126 (3) A S-25-283 199 19 05/15/2025 37-60-126 (6) A S-25-283 199 19 05/15/2025 37-60-126 (7) A S-25-283 199 19 05/15/2025 37-60-126 (8) A S-25-283 199 19 05/15/2025 37-60-126 (12)(b.7) N S-25-283 199 19 05/15/2025 37-60-126 (12)(c) A S-25-283 199 19 05/15/2025 37-60-126.5 (2) A S-25-283 199 20 05/15/2025 37-60-126.5 (3) A S-25-283 199 20 05/15/2025 37-60-126.5 (4) A S-25-283 199 20 05/15/2025 37-75-103 (1) A S-25-283 199 22 05/15/2025 37-75-103 (2)(b) A S-25-283 199 22 05/15/2025 2, 4 37-80-111.5 (1)(d) A H-25-1165 257 7 08/06/2025 2, 4 37-80-111.7 IP(2) A H-25-1165 257 8 08/06/2025 2, 4 37-80-111.7 (2)(b) A H-25-1165 257 8 08/06/2025 3, 4 37-90-103 (3.5) N H-25-1014 388 8 08/06/2025 3, 4 37-90-103 (5.5) N H-25-1014 388 8 08/06/2025 2, 4 37-90-103 (10.5) A H-25-1165 257 9 08/06/2025 3, 4 37-90-107 (7)(a) A H-25-1014 388 3 08/06/2025 3, 4 37-90-107 (7)(c)(I)(C) A H-25-1014 388 3 08/06/2025 3, 4 37-90-107 (7)(d)(I)(C) A H-25-1014 388 3 08/06/2025 3, 4 37-90-107 (7)(d)(III) A H-25-1014 388 3 08/06/2025 3, 4 37-90-108 (1) A H-25-1014 388 1 08/06/2025 3, 4 37-90-108 (2) A H-25-1014 388 1 08/06/2025 3, 4 37-90-108 (3)(a) A H-25-1014 388 1 08/06/2025 3, 4 37-90-108 (4) A H-25-1014 388 1 08/06/2025 3, 4 37-90-108 (6) A H-25-1014 388 1 08/06/2025 3, 4 37-90-109 (4) A H-25-1014 388 4 08/06/2025 3, 4 37-90-111 (5) A H-25-1014 388 5 08/06/2025 3, 4 37-90-112 (3) A H-25-1014 388 6 08/06/2025 2, 4 37-90-137 (2)(a)(II) A H-25-1165 257 10 08/06/2025 2, 4 37-90-137 (2)(b)(I) A H-25-1165 257 10 08/06/2025 2, 4 37-90-137 IP(2)(b)(II) A H-25-1165 257 10 08/06/2025 2, 4 37-90-137 (2)(b)(II)(A) A H-25-1165 257 10 08/06/2025 2, 4 37-90-137 (2)(b)(II)(B) A H-25-1165 257 10 08/06/2025 2, 4 37-90-137 (2)(c) A H-25-1165 257 10 08/06/2025 2, 4 37-90-137 (2)(e) N H-25-1165 257 10 08/06/2025 3, 4 37-90-137 (3)(a)(I) A H-25-1014 388 2 08/06/2025 3, 4 37-90-137 (3)(c) A H-25-1014 388 2 08/06/2025 3, 4 37-90-137 (3)(d) A H-25-1014 388 2 08/06/2025 3, 4 37-90-137 (3)(e) N H-25-1014 388 2 08/06/2025 3, 4 37-90-137 (3)(f) N H-25-1014 388 2 08/06/2025 2, 4 37-90-137 (7.5) N H-25-1165 257 10 08/06/2025 2, 4 37-90.5-102 (1)(b) A H-25-1165 257 11 08/06/2025 2, 4 37-90.5-103 (1)(b) A H-25-1165 257 12 08/06/2025 2, 4 37-90.5-103 (3)(c)(II) A H-25-1165 257 12 08/06/2025 2, 4 37-90.5-103 (9.5) N H-25-1165 257 12 08/06/2025 2, 4 37-90.5-103 (13) R H-25-1165 257 12 08/06/2025 2, 4 37-90.5-103 (14.5) N H-25-1165 257 12 08/06/2025 2, 4 37-90.5-104 (2) A H-25-1165 257 13 08/06/2025 2, 4 37-90.5-104 (4) A H-25-1165 257 13 08/06/2025 2, 4 37-90.5-104 (5) R H-25-1165 257 13 08/06/2025 2, 4 37-90.5-106 (1)(a)(I) A H-25-1165 257 14 08/06/2025 2, 4 37-90.5-106 (1)(a)(II) A H-25-1165 257 14 08/06/2025 2, 4 37-90.5-106 (1)(a)(IV) N H-25-1165 257 14 08/06/2025 2, 4 37-90.5-106 (1)(a)(V) N H-25-1165 257 14 08/06/2025 2, 4 37-90.5-106 (1)(b)(III) A H-25-1165 257 14 08/06/2025 2, 4 37-90.5-106 (1)(c) N H-25-1165 257 14 08/06/2025 2, 4 37-90.5-106 (2)(c) N H-25-1165 257 14 08/06/2025 2, 4 37-90.5-106 (3) A H-25-1165 257 14 08/06/2025 2, 4 37-90.5-106 (6) A H-25-1165 257 14 08/06/2025 2, 4 37-90.5-106 (7) N H-25-1165 257 14 08/06/2025 2, 4 37-90.5-107 (1)(a) A H-25-1165 257 15 08/06/2025 2, 4 37-90.5-107 (3)(b) R H-25-1165 257 15 08/06/2025 2, 4 37-90.5-107 (3)(d) R H-25-1165 257 15 08/06/2025 2, 4 37-90.5-107 (4) A H-25-1165 257 15 08/06/2025 2, 4 37-90.5-111 (1)(b) A H-25-1165 257 16 08/06/2025 2, 4 37-91-101 A H-25-1165 257 17 08/06/2025 2, 4 37-91-102 (3) A H-25-1165 257 18 08/06/2025 2, 4 37-91-102 (4.1) N H-25-1165 257 18 08/06/2025 2, 4 37-91-102 (6.5) N H-25-1165 257 18 08/06/2025 2, 4 37-91-102 (6.7) N H-25-1165 257 18 08/06/2025 2, 4 37-91-102 (7.5) N H-25-1165 257 18 08/06/2025 2, 4 37-91-102 (10) A H-25-1165 257 18 08/06/2025 2, 4 37-91-102 (10.5) A H-25-1165 257 18 08/06/2025 2, 4 37-91-102 (14) A H-25-1165 257 18 08/06/2025 2, 4 37-91-102 (15) A H-25-1165 257 18 08/06/2025 2, 4 37-91-102 (15.5) A H-25-1165 257 18 08/06/2025 2, 4 37-91-102 (16)(b)(I)(B) A H-25-1165 257 18 08/06/2025 2, 4 37-91-102 (16)(b)(I)(C) A H-25-1165 257 18 08/06/2025 2, 4 37-91-102 (16)(b)(I)(D) N H-25-1165 257 18 08/06/2025 2, 4 37-91-102 (16)(b)(II) A H-25-1165 257 18 08/06/2025 2, 4 37-91-102 (17) A H-25-1165 257 18 08/06/2025 2, 4 37-91-103 (1) A H-25-1165 257 19 08/06/2025 2, 4 37-91-103 (3) A H-25-1165 257 19 08/06/2025 2, 4 37-91-104 (1)(b) A H-25-1165 257 20 08/06/2025 2, 4 37-91-104 (1)(i) A H-25-1165 257 20 08/06/2025 2, 4 37-91-104 (1)(l) A H-25-1165 257 20 08/06/2025 2, 4 37-91-105 (1) A H-25-1165 257 21 08/06/2025 2, 4 37-91-105 (2)(d) A H-25-1165 257 21 08/06/2025 2, 4 37-91-105 (2.5) A H-25-1165 257 21 08/06/2025 2, 4 37-91-105 (5) A H-25-1165 257 21 08/06/2025 2, 4 37-91-105 (7) A H-25-1165 257 21 08/06/2025 2, 4 37-91-105 (8) N H-25-1165 257 21 08/06/2025 2, 4 37-91-106 (2) A H-25-1165 257 22 08/06/2025 2, 4 37-91-107 (2) A H-25-1165 257 23 08/06/2025 2, 4 37-91-107 (3) A H-25-1165 257 23 08/06/2025 2, 4 37-91-107 (4) A H-25-1165 257 23 08/06/2025 2, 4 37-91-107 (4.5) A H-25-1165 257 23 08/06/2025 2, 4 37-91-107 (5) A H-25-1165 257 23 08/06/2025 2, 4 37-91-107 (6) A H-25-1165 257 23 08/06/2025 2, 4 37-91-108 IP(1) A H-25-1165 257 24 08/06/2025 2, 4 37-91-108 (1)(d) A H-25-1165 257 24 08/06/2025 2, 4 37-91-108 (1)(f) A H-25-1165 257 24 08/06/2025 2, 4 37-91-108 (1)(g) A H-25-1165 257 24 08/06/2025 2, 4 37-91-108 (1)(h) A H-25-1165 257 24 08/06/2025 2, 4 37-91-108 (3) A H-25-1165 257 24 08/06/2025 2, 4 37-91-108 (4) A H-25-1165 257 24 08/06/2025 2, 4 37-91-108 (5) A H-25-1165 257 24 08/06/2025 2, 4 37-91-109 (1) A H-25-1165 257 25 08/06/2025 2, 4 37-91-110 IP(1) A H-25-1165 257 26 08/06/2025 2, 4 37-91-110 (1)(c) N H-25-1165 257 26 08/06/2025 2, 4 37-91-110 (2) A H-25-1165 257 26 08/06/2025 2, 4 37-91-110 (3) A H-25-1165 257 26 08/06/2025 2, 4 37-91-111 (1) A H-25-1165 257 27 08/06/2025 2, 4 37-91-111 (3) A H-25-1165 257 27 08/06/2025 2, 4 37-91-113 (1) A H-25-1165 257 28 08/06/2025 2, 4 37-91-113 IP(2) A H-25-1165 257 28 08/06/2025 2, 4 37-91-113 (2)(a) A H-25-1165 257 28 08/06/2025 2, 4 37-91-113 IP(3) A H-25-1165 257 28 08/06/2025 2, 4 37-91-113 (3)(a) A H-25-1165 257 28 08/06/2025 2, 4 37-91-113 (3)(e) A H-25-1165 257 28 08/06/2025 2, 4 37-91-113 (3)(f) A H-25-1165 257 28 08/06/2025 3, 4 37-92-401 (1)(a) A H-25-1014 388 7 08/06/2025 3, 4 37-92-401 (2)(b) A H-25-1014 388 7 08/06/2025 3, 4 37-92-401 (3) A H-25-1014 388 7 08/06/2025 3, 4 37-92-401 (4) A H-25-1014 388 7 08/06/2025 3, 4 37-92-401 (5) A H-25-1014 388 7 08/06/2025 3, 4 37-92-401 (6) A H-25-1014 388 7 08/06/2025 3, 4 37-92-401 (7) A H-25-1014 388 7 08/06/2025 4, 78 37-96-102.5 A S-25-275 377 301 08/06/2025 4, 201 37-96-103 (1) R S-25-275 377 336 08/06/2025 4 37-98-101.5 N S-25-275 377 302 08/06/2025 4 37-98-102 (1)(a)(I) A S-25-275 377 303 08/06/2025 2, 4 37-98-106 N S-25-040 193 2 08/06/2025 2, 4 37-99-102 (1)(a)(II) A H-25-1113 221 2 08/06/2025 2, 4 37-99-102 (1)(a)(III) A H-25-1113 221 2 08/06/2025 2, 4 37-99-102 (1)(a)(IV) N H-25-1113 221 2 08/06/2025 2, 4 37-99-102 (1)(b) R H-25-1113 221 2 08/06/2025 2, 4 37-99-102 (1.5) N H-25-1113 221 2 08/06/2025 2, 4 37-99-102 (6.5) N H-25-1113 221 2 08/06/2025 2, 4 37-99-102 (7) A H-25-1113 221 2 08/06/2025 2, 4 37-99-102 (10.5) N H-25-1113 221 2 08/06/2025 2, 4 37-99-102 (12.5) N H-25-1113 221 2 08/06/2025 2, 4 37-99-102 (14.5) N H-25-1113 221 2 08/06/2025 2, 4 37-99-102 (17) A H-25-1113 221 2 08/06/2025 2, 4 37-99-102 (18.5) N H-25-1113 221 2 08/06/2025 2, 4 37-99-103 (1) A H-25-1113 221 3 08/06/2025 2, 4 37-99-103 (3) A H-25-1113 221 3 08/06/2025 2, 4 37-99-103 (4)(a) A H-25-1113 221 3 08/06/2025 2, 4 37-99-103 (4)(b) A H-25-1113 221 3 08/06/2025 2, 4 37-99-103 (4)(d) A H-25-1113 221 3 08/06/2025 2, 4 37-99-103 (4)(e) A H-25-1113 221 3 08/06/2025 2, 4 37-99-103 (4)(f) N H-25-1113 221 3 08/06/2025 2, 4 37-99-103 (5) N H-25-1113 221 3 08/06/2025 2, 4 37-99-104 N H-25-1113 221 4 08/06/2025 TITLE 38 Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date 4 38-5-109 (1)(j.5) N S-25-204 201 1 08/06/2025 4 38-5-109 (3)(c) A S-25-204 201 1 08/06/2025 3, 17 38-5.5-104.5 (1) A H-25-1056 434 5 01/01/2026 4 38-6-200.3 N S-25-275 377 304 08/06/2025 4 38-6-201 A S-25-275 377 305 08/06/2025 4 38-7-100.3 N S-25-275 377 306 08/06/2025 4 38-7-101 IP(2) A S-25-275 377 307 08/06/2025 4 38-7.5-100.3 N S-25-275 377 308 08/06/2025 4 38-7.5-101 IP(2) A S-25-275 377 309 08/06/2025 3, 4 38-8-101 A S-25-133 57 1 08/06/2025 3, 4 38-8-102 IP A S-25-133 57 2 08/06/2025 3, 4 38-8-102 IP(1)(a) A S-25-133 57 2 08/06/2025 3, 4 38-8-102 (1)(a)(II) A S-25-133 57 2 08/06/2025 3, 4 38-8-102 IP(1)(b) A S-25-133 57 2 08/06/2025 3, 4 38-8-102 (1)(b)(I) A S-25-133 57 2 08/06/2025 3, 4 38-8-102 (1)(d) A S-25-133 57 2 08/06/2025 3, 4 38-8-102 (3) A S-25-133 57 2 08/06/2025 3, 4 38-8-102 (7.5) N S-25-133 57 2 08/06/2025 3, 4 38-8-102 (7.7) N S-25-133 57 2 08/06/2025 3, 4 38-8-102 IP(8) A S-25-133 57 2 08/06/2025 3, 4 38-8-102 (10) A S-25-133 57 2 08/06/2025 3, 4 38-8-102 (11.5) N S-25-133 57 2 08/06/2025 3, 4 38-8-102 (12.5) N S-25-133 57 2 08/06/2025 3, 4 38-8-103 (2) A S-25-133 57 3 08/06/2025 3, 4 38-8-103 (3) A S-25-133 57 3 08/06/2025 3, 4 38-8-105 IP(1) A S-25-133 57 4 08/06/2025 3, 4 38-8-105 (1)(b)(II) A S-25-133 57 4 08/06/2025 3, 4 38-8-105 IP(2) A S-25-133 57 4 08/06/2025 3, 4 38-8-105 (2)(k) A S-25-133 57 4 08/06/2025 3, 4 38-8-105 (3) N S-25-133 57 4 08/06/2025 3, 4 38-8-105 (4) N S-25-133 57 4 08/06/2025 3, 4 38-8-106 A S-25-133 57 5 08/06/2025 3, 4 38-8-107 IP(1) A S-25-133 57 6 08/06/2025 3, 4 38-8-107 (1)(a)(I) A S-25-133 57 6 08/06/2025 3, 4 38-8-107 (5)(b) A S-25-133 57 6 08/06/2025 3, 4 38-8-108 IP(1) A S-25-133 57 7 08/06/2025 3, 4 38-8-108 (1)(c) A S-25-133 57 7 08/06/2025 3, 4 38-8-109 (1) A S-25-133 57 8 08/06/2025 3, 4 38-8-109 (2) A S-25-133 57 8 08/06/2025 3, 4 38-8-109 IP(4) A S-25-133 57 8 08/06/2025 3, 4 38-8-109 (4)(a) A S-25-133 57 8 08/06/2025 3, 4 38-8-109 (4)(b) A S-25-133 57 8 08/06/2025 3, 4 38-8-109 (5)(b) A S-25-133 57 8 08/06/2025 3, 4 38-8-109 (7) N S-25-133 57 8 08/06/2025 3, 4 38-8-109 (8) N S-25-133 57 8 08/06/2025 3, 4 38-8-110 A S-25-133 57 9 08/06/2025 3, 4 38-8-113 N S-25-133 57 10 08/06/2025 8 38-12-102 (4) A H-25-1249 401 1 01/01/2026 2, 124 38-12-103 (1) A H-25-1168 229 13 05/22/2025 125 38-12-103 (1) A H-25-1249 401 2 148 38-12-103 (1) A H-25-1249 401 3 01/01/2026 8 38-12-103 (1.5) N H-25-1249 401 2 01/01/2026 8 38-12-103 (2) A H-25-1249 401 2 01/01/2026 8 38-12-103 (2.5) N H-25-1249 401 2 01/01/2026 8 38-12-103 (3) A H-25-1249 401 2 01/01/2026 8 38-12-103 (3.5) N H-25-1249 401 2 01/01/2026 8 38-12-103 IP(4) A H-25-1249 401 2 01/01/2026 8 38-12-103 (7) A H-25-1249 401 2 01/01/2026 8 38-12-103 (8) N H-25-1249 401 2 01/01/2026 8 38-12-103 (9) N H-25-1249 401 2 01/01/2026 8 38-12-103 (10) N H-25-1249 401 2 01/01/2026 8 38-12-103 (11) N H-25-1249 401 2 01/01/2026 8 38-12-103 (12) N H-25-1249 401 2 01/01/2026 2 38-12-401 (3) A H-25-1168 229 14 05/22/2025 2 38-12-401 (4) A H-25-1168 229 14 05/22/2025 2 38-12-401 (4.5) N H-25-1168 229 14 05/22/2025 2 38-12-401 (5.5) N H-25-1168 229 14 05/22/2025 2 38-12-401 (6) A H-25-1168 229 14 05/22/2025 2 38-12-401 (7) N H-25-1168 229 14 05/22/2025 2 38-12-401 (8) N H-25-1168 229 14 05/22/2025 2 38-12-402 A H-25-1168 229 15 05/22/2025 2, 3 38-12-507 (2)(g)(IV) A H-25-1240 291 3 05/29/2025 4 38-12-513 N S-25-020 264 6 08/06/2025 2, 3, 17 38-12-801 (3)(a)(VI) A H-25-1090 94 4 01/01/2026 1, 3, 28 38-12-801 (3.5) N H-25-1108 437 2 09/01/2025 3, 8 38-12-902 (2.5)(e)(I) A H-25-1236 399 1 01/01/2026 3, 8 38-12-904 (1.5)(b)(II) R H-25-1236 399 2 01/01/2026 38-12-1110 (1) A S-25-265 130 4 07/01/2025 4 38-12-1110 (3)(b) A S-25-300 428 53 08/06/2025 2 38-12-1302 (1)(d) A H-25-1168 229 16 05/22/2025 4, 79 38-12-1400.3 N S-25-275 377 310 08/06/2025 4, 202 38-12-1401 (1) R S-25-275 377 336 08/06/2025 2, 3 38-12-15 (entire part 15) N H-25-1240 291 2 05/29/2025 38-13-102 (5.5) N H-25-1224 440 2 06/04/2025 38-13-102 (13.3) N H-25-1224 440 2 06/04/2025 38-13-102 (13.5) N H-25-1224 440 2 06/04/2025 38-13-102 IP(32) A H-25-1224 440 2 06/04/2025 38-13-102 (32)(c) A H-25-1224 440 2 06/04/2025 38-13-102 (32)(d) A H-25-1224 440 2 06/04/2025 38-13-102 (32)(e) N H-25-1224 440 2 06/04/2025 38-13-201 (1)(l) A H-25-1224 440 3 06/04/2025 38-13-201 (1)(l.5) N H-25-1224 440 3 06/04/2025 38-13-201 (1)(m) A H-25-1224 440 3 06/04/2025 38-13-202 (1) A H-25-1224 440 4 06/04/2025 38-13-202 (3) R H-25-1224 440 4 06/04/2025 38-13-202 (4) R H-25-1224 440 4 06/04/2025 38-13-404 IP(1) A H-25-1224 440 5 06/04/2025 38-13-406 N H-25-1224 440 6 06/04/2025 38-13-501 (3) N H-25-1224 440 7 06/04/2025 38-13-603 (4.5) N H-25-1224 440 8 06/04/2025 38-13-605 IP(1) A H-25-1224 440 9 06/04/2025 38-13-605 (2) A H-25-1224 440 9 06/04/2025 38-13-605 (3) A H-25-1224 440 9 06/04/2025 38-13-605 IP(4)(a) A H-25-1224 440 9 06/04/2025 38-13-609 (3) A H-25-1224 440 10 06/04/2025 38-13-702 (2) A H-25-1224 440 11 06/04/2025 38-13-702 (3) N H-25-1224 440 11 06/04/2025 2 38-13-801 (1)(c) A S-25-290 274 4 05/28/2025 2 38-13-801 (2)(e) N S-25-290 274 4 05/28/2025 2 38-13-801 (2)(f) N S-25-290 274 4 05/28/2025 2 38-13-801 (6) N S-25-290 274 4 05/28/2025 38-13-902.4 A H-25-1224 440 12 06/04/2025 38-13-904 (1) A H-25-1224 440 13 06/04/2025 38-13-1304 (1)(b)(IV) A H-25-1224 440 14 06/04/2025 38-13-1402 (1)(b) A H-25-1224 440 15 06/04/2025 38-13-1402 (1)(b.5) N H-25-1224 440 15 06/04/2025 38-13-1504 R H-25-1224 440 16 06/04/2025 4, 80 38-22-100.3 N S-25-275 377 311 08/06/2025 4, 203 38-22-101 (6) R S-25-275 377 336 08/06/2025 2 38-25.5-105 A H-25-1215 312 12 05/30/2025 4, 81 38-31-100.3 N S-25-275 377 312 08/06/2025 4, 204 38-31-102 (2) R S-25-275 377 336 08/06/2025 3, 11 38-33.3-123 (1)(f)(III.5) N H-25-1043 433 2 10/01/2025 3, 11 38-33.3-123 (3) N H-25-1043 433 2 10/01/2025 3, 11 38-33.3-209.5 (1)(a.5) N H-25-1043 433 3 10/01/2025 3, 11 38-33.3-209.5 (1.7)(a)(I)(D) N H-25-1043 433 3 10/01/2025 3, 11 38-33.3-209.5 IP(5)(a) A H-25-1043 433 3 10/01/2025 3, 11 38-33.3-209.5 (5)(a)(V)(C) A H-25-1043 433 3 10/01/2025 3, 11 38-33.3-209.5 (5)(a)(V)(D) A H-25-1043 433 3 10/01/2025 3, 11 38-33.3-209.5 (5)(a)(V)(E) N H-25-1043 433 3 10/01/2025 1, 2, 3, 4 38-33.3-303.5 (1)(d)(I)(A) A H-25-1272 183 6 08/06/2025 1, 2, 3, 4 38-33.3-303.5 IP(1)(d)(III) A H-25-1272 183 6 08/06/2025 1, 2, 3, 4 38-33.3-303.5 (5) N H-25-1272 183 6 08/06/2025 3, 11 38-33.3-316 (10.3) N H-25-1043 433 4 10/01/2025 3, 11 38-33.3-316 (10.8) N H-25-1043 433 4 10/01/2025 3, 11 38-33.3-316 (11.2) N H-25-1043 433 4 10/01/2025 3, 11 38-33.3-316 (14) N H-25-1043 433 4 10/01/2025 3, 11 38-33.3-401 (3.2) N H-25-1043 433 5 10/01/2025 3, 4 38-35-125 (1)(a) A S-25-016 26 1 08/06/2025 4 38-35.7-110 (1) R H-25-1219 290 4 08/06/2025 4 38-35.7-110 IP(2) A H-25-1219 290 4 08/06/2025 4 38-35.7-110 (2)(c)(V) N H-25-1219 290 4 08/06/2025 4 38-35.7-110 (2)(d) A H-25-1219 290 4 08/06/2025 3, 11 38-38-109.5 N H-25-1043 433 6 10/01/2025 4 38-40-104 A S-25-300 428 54 08/06/2025 4 38-52-106.5 N S-25-019 10 1 08/06/2025 TITLE 39 Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date 4, 5 39-1-104.2 IP(3)(s)(I) A S-25-026 362 11 08/06/2025 2, 5 39-1-104.2 IP(3)(s)(I) A H-25-1296 202 4 05/16/2025 39-1-123 (1) A S-25-259 126 1 04/25/2025 39-1-123 (2)(a)(II) A S-25-259 126 1 04/25/2025 39-1-123 (7) N S-25-259 126 1 04/25/2025 39-2-125 (2.5)(b)(II) A S-25-265 130 3 07/01/2025 39-2-125 (4) N S-25-264 129 45 04/25/2025 4 39-3-124 (1)(b)(I)(A) A H-25-1289 404 1 08/06/2025 4 39-3-124 (1)(b)(I)(F) N H-25-1289 404 1 08/06/2025 4 39-3-124 (1)(b)(I)(G) N H-25-1289 404 1 08/06/2025 4 39-3-124 (1)(b)(II) A H-25-1289 404 1 08/06/2025 4 39-3-124 (4) N H-25-1289 404 1 08/06/2025 4 39-3-139 N H-25-1080 317 1 08/06/2025 39-3.5-101 (2.5) R S-25-261 425 1 07/01/2025 39-3.5-101 (3.5) R S-25-261 425 1 07/01/2025 39-3.5-102 (1)(a) A S-25-261 425 2 07/01/2025 39-3.5-102 (1)(c) R S-25-261 425 2 07/01/2025 39-3.5-102 IP(2) A S-25-261 425 2 07/01/2025 39-3.5-102 (2)(a) A S-25-261 425 2 07/01/2025 39-3.5-102 (2.5)(a) A S-25-261 425 2 07/01/2025 39-3.5-102 (2.5)(b) R S-25-261 425 2 07/01/2025 39-3.5-103 (1)(d.5)(I)(B) A S-25-261 425 3 07/01/2025 39-3.5-103 (1)(d.5)(II) A S-25-261 425 3 07/01/2025 39-3.5-103.5 R S-25-261 425 4 07/01/2025 39-3.5-104 IP(1) A S-25-261 425 5 07/01/2025 39-3.5-105 (1) A S-25-261 425 6 07/01/2025 39-3.5-105 (1.5) R S-25-261 425 6 07/01/2025 39-3.5-105 (6) N S-25-261 425 6 07/01/2025 39-3.5-106 (3) R S-25-261 425 7 07/01/2025 39-3.5-107 (2) A S-25-261 425 8 07/01/2025 39-3.5-108 A S-25-261 425 9 07/01/2025 39-3.5-109 A S-25-261 425 10 07/01/2025 2, 4 39-4-101 (2.4) A H-25-1040 45 4 08/06/2025 39-5-122 (2) A H-25-1324 445 1 06/04/2025 39-5-122 (2.5) A H-25-1324 445 1 06/04/2025 39-5-122 (4) A H-25-1324 445 1 06/04/2025 39-5-123 (1)(a) A H-25-1324 445 2 06/04/2025 39-8-104 (2)(a) A H-25-1324 445 3 06/04/2025 39-8-105 (1) A H-25-1324 445 4 06/04/2025 39-8-106 (1)(a) A H-25-1324 445 5 06/04/2025 39-8-107 (2)(a) A H-25-1324 445 6 06/04/2025 4 39-13-101.5 N S-25-275 377 313 08/06/2025 4 39-13-102 (1) A S-25-275 377 314 08/06/2025 39-21-102 (9) N H-25-1154 230 26 01/01/2026 4 39-21-113 (28) R S-25-300 428 55 08/06/2025 9 39-21-113 (35) A S-25-046 20 2 07/01/2025 4 39-21-113 (37) N S-25-018 361 1 08/06/2025 39-21-113 (38) N S-25-319 432 2 06/04/2025 2 39-21-113 (39) N H-25-1296 202 5 05/16/2025 39-21-119.5 (2)(t) A H-25-1154 230 29 01/01/2026 39-21-403 (2)(a)(I) A S-25-199 149 9 04/30/2025 39-21-403 (2)(d) A S-25-199 149 9 04/30/2025 39-21-403 (2)(e) A S-25-199 149 9 04/30/2025 2, 108 39-22-104 IP(3)(p.5)(I) A H-25-1274 402 18 2, 106 39-22-104 IP(3)(p.5)(I) A H-25-1274 402 19 2, 106 39-22-104 (3)(p.5)(I.5) N H-25-1274 402 19 2, 108 39-22-104 (3)(p.5)(II) A H-25-1274 402 18 2, 106 39-22-104 (3)(p.5)(II) A H-25-1274 402 19 2, 108 39-22-104 (3)(p.5)(III) N H-25-1274 402 18 2, 108 39-22-104 (3)(p.7) N H-25-1274 402 18 2 39-22-104 (3)(t) A H-25-1296 202 6 01/01/2026 2 39-22-104 (3)(u) N H-25-1296 202 6 01/01/2026 4 39-22-104 (4)(e) A S-25-026 362 5 08/06/2025 2, 4 39-22-104 (4)(i)(I)(B) A S-25-302 245 2 08/06/2025 2, 4 39-22-104 (4)(i)(I)(C) A S-25-302 245 2 08/06/2025 2, 4 39-22-104 (4)(i)(II)(B) A S-25-302 245 2 08/06/2025 2, 4 39-22-104 IP(4)(i)(III.5) A S-25-302 245 2 08/06/2025 2, 4 39-22-104 (4)(i)(III.5)(D) A S-25-302 245 2 08/06/2025 2, 4 39-22-104 (4)(i)(IV)(D) A S-25-302 245 2 08/06/2025 2, 4 39-22-104 (4)(i)(IV)(E) A S-25-302 245 2 08/06/2025 2, 4 39-22-104 (4)(i)(IV.5) A S-25-302 245 2 08/06/2025 2, 4 39-22-104 (4)(i)(VII) N S-25-302 245 2 08/06/2025 4 39-22-104 (4)(dd) N H-25-1021 311 1 08/06/2025 39-22-104 (4)(ee) N S-25-310 359 10 06/02/2025 2 39-22-123.5 (3.5)(a)(III) A H-25-1335 410 3 06/03/2025 4 39-22-123.7 IP(5) A S-25-300 428 56 08/06/2025 2 39-22-130 (2)(b)(II)(C) A H-25-1335 410 2 06/03/2025 4 39-22-304 (3)(f) A S-25-026 362 6 08/06/2025 4 39-22-304 (3)(s) N H-25-1021 311 2 08/06/2025 4 39-22-304 (3)(t) N H-25-1021 311 2 08/06/2025 2 39-22-509 (2)(d) A H-25-1296 202 7 05/16/2025 2 39-22-514.5 IP(8)(c)(III) A H-25-1296 202 8 05/16/2025 2 39-22-517 (1) A H-25-1296 202 9 05/16/2025 2 39-22-517 (2) A H-25-1296 202 9 05/16/2025 2 39-22-517 (4) A H-25-1296 202 9 05/16/2025 4 39-22-532 (7) A H-25-1157 213 2 08/06/2025 2 39-22-537.5 (3)(a) A H-25-1296 202 10 05/16/2025 2 39-22-537.5 (5) N H-25-1296 202 10 05/16/2025 4 39-22-542 (1)(a)(I) A H-25-1021 311 3 08/06/2025 4 39-22-542 (1)(a)(III) A H-25-1021 311 3 08/06/2025 4 39-22-542 (2)(a)(II) A H-25-1021 311 3 08/06/2025 4 39-22-542 (2)(c.5) N H-25-1021 311 3 08/06/2025 4 39-22-542 (2)(e) A H-25-1021 311 3 08/06/2025 4 39-22-542 (2)(j)(I) R H-25-1021 311 3 08/06/2025 4 39-22-542 (2)(j)(II) A H-25-1021 311 3 08/06/2025 4 39-22-542 (2)(j)(III) A H-25-1021 311 3 08/06/2025 4 39-22-542 (2)(j.5) N H-25-1021 311 3 08/06/2025 4 39-22-542 (2)(k.5) N H-25-1021 311 3 08/06/2025 4 39-22-542 IP(3)(a) A H-25-1021 311 3 08/06/2025 4 39-22-542 (3)(a.3) N H-25-1021 311 3 08/06/2025 4 39-22-542 (3)(a.5)(I) A H-25-1021 311 3 08/06/2025 4 39-22-542 (3)(a.5)(III) N H-25-1021 311 3 08/06/2025 4 39-22-542 (3)(a.7) N H-25-1021 311 3 08/06/2025 4 39-22-542 (3)(b)(III) N H-25-1021 311 3 08/06/2025 4 39-22-542 (3)(c) A H-25-1021 311 3 08/06/2025 4 39-22-542 (3)(d) A H-25-1021 311 3 08/06/2025 4 39-22-542 (4) A H-25-1021 311 3 08/06/2025 4 39-22-542 (5)(a)(V) A H-25-1021 311 3 08/06/2025 4 39-22-542 (5)(a)(VI) A H-25-1021 311 3 08/06/2025 4 39-22-542 (5)(a)(VII) N H-25-1021 311 3 08/06/2025 4 39-22-542 (6)(a)(I) A H-25-1021 311 3 08/06/2025 4 39-22-542 (8) A H-25-1021 311 3 08/06/2025 4 39-22-542 (10) A H-25-1021 311 3 08/06/2025 4 39-22-542 IP(11) A H-25-1021 311 3 08/06/2025 4 39-22-542 (14) A H-25-1021 311 3 08/06/2025 4 39-22-542.5 IP(2)(a) A H-25-1021 311 4 08/06/2025 4 39-22-542.5 (2)(d)(I) R H-25-1021 311 4 08/06/2025 4 39-22-542.5 (2)(d)(II) A H-25-1021 311 4 08/06/2025 4 39-22-542.5 (2)(d)(III) A H-25-1021 311 4 08/06/2025 4 39-22-542.5 (2)(f) A H-25-1021 311 4 08/06/2025 2 39-22-544 (4)(c) A H-25-1296 202 11 05/16/2025 4 39-22-546 (3)(a) A S-25-026 362 2 08/06/2025 4 39-22-546 (7) A S-25-026 362 2 08/06/2025 2, 4 39-22-551 IP(2)(e) A S-25-182 277 3 08/06/2025 2, 4 39-22-551 (2)(e)(XVIII) A S-25-182 277 3 08/06/2025 2, 4 39-22-551 (2)(e)(XVIII.5) N S-25-182 277 3 08/06/2025 39-22-566 (2)(i) A H-25-1003 50 5 07/01/2025 2 39-22-566 (2)(j) A H-25-1296 202 12 05/16/2025 2 39-22-566 (2)(k) A H-25-1296 202 12 05/16/2025 2 39-22-566 (2)(l) A H-25-1296 202 12 05/16/2025 4 39-22-569 (1)(c) A S-25-300 428 57 08/06/2025 39-22-570 (2)(b.5) N S-25-319 432 1 06/04/2025 39-22-570 (2)(c) A S-25-319 432 1 06/04/2025 39-22-570 (2)(c.5) N S-25-319 432 1 06/04/2025 39-22-570 (2)(d.5) N S-25-319 432 1 06/04/2025 39-22-570 (3) A S-25-319 432 1 06/04/2025 39-22-570 IP(4)(a) A S-25-319 432 1 06/04/2025 39-22-570 (4)(b) A S-25-319 432 1 06/04/2025 39-22-570 (4)(c) A S-25-319 432 1 06/04/2025 39-22-570 (6)(d) A S-25-319 432 1 06/04/2025 4 39-22-571 N H-25-1005 62 2 08/06/2025 4, 82 39-22-600.3 N S-25-275 377 315 08/06/2025 4, 205 39-22-603.5 (1) R S-25-275 377 336 08/06/2025 2 39-22-604 (3)(a) A H-25-1296 202 13 05/16/2025 2 39-22-604 (3)(b) A H-25-1296 202 13 05/16/2025 2 39-22-604 (4)(b) A H-25-1296 202 13 05/16/2025 2 39-22-604 (5) A H-25-1296 202 13 05/16/2025 2 39-22-604 (6)(a) A H-25-1296 202 13 05/16/2025 2 39-22-604 (8) A H-25-1296 202 13 05/16/2025 2 39-22-604 (10) A H-25-1296 202 13 05/16/2025 2 39-22-604 (13) A H-25-1296 202 13 05/16/2025 2 39-22-604 (16)(a) A H-25-1296 202 13 05/16/2025 2 39-22-604 (16)(b)(I) A H-25-1296 202 13 05/16/2025 4 39-22-604 (18)(f) A S-25-300 428 58 08/06/2025 2 39-22-604 (20) A H-25-1296 202 13 05/16/2025 4 39-22-1001 (1)(b)(XIV) A H-25-1299 227 2 08/06/2025 4 39-22-1001 (1)(b)(XV) A H-25-1299 227 2 08/06/2025 4 39-22-1001 (1)(b)(XVI) N H-25-1299 227 2 08/06/2025 4 39-22-1001 (5)(c)(I) A H-25-1299 227 2 08/06/2025 4 39-22-5502 (4) A S-25-300 428 59 08/06/2025 4 39-22-56 (entire part 56) N H-25-1299 227 3 08/06/2025 4 39-24-102 A S-25-275 377 316 08/06/2025 4 39-24-105 A S-25-275 377 317 08/06/2025 4 39-26-102 (19)(a) A S-25-026 362 9 08/06/2025 4 39-26-102 (19)(f.5) N S-25-026 362 3 08/06/2025 2 39-26-102 (19)(g) A H-25-1296 202 14 05/16/2025 2 39-26-104 (1)(c.5) N H-25-1296 202 15 05/16/2025 4 39-26-129 (1) A H-25-1080 317 4 08/06/2025 4 39-26-402 (1) A S-25-026 362 10 08/06/2025 39-26-708 IP(1) A S-25-272 314 1 05/30/2025 39-26-708 (1)(a) A S-25-272 314 1 05/30/2025 39-26-708 IP(2) A S-25-272 314 1 05/30/2025 39-26-708 (2)(a) A S-25-272 314 1 05/30/2025 39-26-719 IP(1)(a) A S-25-320 386 1 06/03/2025 39-26-719 (1)(c) A S-25-320 386 1 06/03/2025 39-26-719 (1.5) N S-25-320 386 1 06/03/2025 39-26-719 IP(2)(b)(I) A S-25-320 386 1 06/03/2025 39-26-719 (2)(b)(I)(A) R S-25-320 386 1 06/03/2025 39-26-719 (2)(b)(III) A S-25-320 386 1 06/03/2025 2 39-26-726 A H-25-1296 202 16 05/16/2025 4 39-26-801.5 N S-25-275 377 318 08/06/2025 4 39-26-802 (1)(a)(I) A S-25-275 377 319 08/06/2025 39-26-802 (3) A S-25-199 149 10 04/30/2025 39-26-802 (5) A S-25-199 149 10 04/30/2025 4, 83 39-26-900.3 N S-25-275 377 320 08/06/2025 4, 206 39-26-901 (3) R S-25-275 377 336 08/06/2025 4 39-27-102.5 (2.3) N S-25-026 362 7 08/06/2025 4 39-27-103 (8) N S-25-026 362 8 08/06/2025 2 39-28-102.5 (3) N H-25-1215 312 13 05/30/2025 39-28.8-203 IP(1) A S-25-268 374 3 06/03/2025 39-28.8-203 (1)(a)(I) A S-25-268 374 3 06/03/2025 39-28.8-203 IP(1)(b)(I.5) A S-25-268 374 3 06/03/2025 39-28.8-203 (1)(b)(I.6) N S-25-268 374 3 06/03/2025 39-28.8-203 (2.5) N S-25-268 374 3 06/03/2025 4 39-28.8-500.3 N S-25-275 377 321 08/06/2025 4 39-28.8-501 (1) A S-25-275 377 322 08/06/2025 39-28.8-501 (4.7)(b) A S-25-262 373 2 06/03/2025 39-28.8-501 (4.7)(c) N S-25-262 373 2 06/03/2025 39-28.8-501 (4.8)(a) A S-25-268 374 2 06/03/2025 39-28.8-501 (4.8)(c) R S-25-268 374 2 06/03/2025 2, 4 39-29-105 (2)(b)(II) A S-25-040 193 3 08/06/2025 2, 4 39-29-105 (2)(c) R S-25-040 193 3 08/06/2025 2, 4 39-29-105 IP(2)(d) A S-25-040 193 3 08/06/2025 2, 4, 120 39-29-108 (2)(e)(I) A S-25-040 193 4 08/06/2025 120 39-29-108 (2)(e)(I) A S-25-307 382 2 06/03/2025 2, 4 39-29-108 (2)(e)(III)(B) A S-25-040 193 4 08/06/2025 39-29-108 (2)(e)(IV) N S-25-307 382 2 06/03/2025 39-29-109 (2)(a)(II.5)(B) A S-25-283 199 21 05/15/2025 39-29-109 (2)(a)(II.5)(C) A S-25-283 199 21 05/15/2025 39-29-109 (2)(a)(II.5)(D) R S-25-283 199 21 05/15/2025 39-29-109 (2)(b)(III) A S-25-283 199 21 05/15/2025 2 39-29-109 (2)(c)(I) A S-25-317 385 48 06/03/2025 2 39-29-109 (2)(c)(I.5) N S-25-317 385 48 06/03/2025 4 39-29-109.3 (3.5)(b) A S-25-300 428 60 08/06/2025 2 39-29-110 (1)(a)(I) A S-25-317 385 49 06/03/2025 39-29-110 (1)(b)(I) A S-25-037 364 6 06/03/2025 39-29-110 (1)(b)(II)(A) A S-25-037 364 6 06/03/2025 39-29-110 (7)(f) N S-25-264 129 46 04/25/2025 39-29-110 (10) N S-25-256 107 1 04/24/2025 2 39-29-110 (11) N S-25-317 385 49 06/03/2025 2 39-30-104 (1)(a) A H-25-1296 202 17 05/16/2025 2 39-30-104 (2)(b) R H-25-1296 202 17 05/16/2025 2 39-30-104 IP(2)(c)(I) A H-25-1296 202 17 05/16/2025 2 39-30-104 (2)(c)(I)(B) A H-25-1296 202 17 05/16/2025 2 39-30-104 (2)(c)(III) A H-25-1296 202 17 05/16/2025 2 39-30-104 (2)(c)(IV) A H-25-1296 202 17 05/16/2025 2 39-30-104 (2.5) RE H-25-1296 202 17 05/16/2025 4 39-36-105 A S-25-300 428 61 08/06/2025 4 39-36-106 (1)(b)(II) A S-25-300 428 62 08/06/2025 2, 3, 17, 136 39-37-103 (6) A H-25-1238 93 4 01/01/2026 4, 136 39-37-103 (6) A S-25-300 428 63 08/06/2025 4 39-37-103 (7)(a) A S-25-300 428 63 08/06/2025 4 39-37-103 (7)(b) A S-25-300 428 63 08/06/2025 4 39-37-103 (8) A S-25-300 428 63 08/06/2025 39-37-301 (2)(a)(II) A S-25-295 330 2 05/31/2025 39-37-302 N S-25-295 330 3 05/31/2025 TITLE 40 Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date 2 40-2-109 (2)(a)(III) N S-25-162 420 10 06/04/2025 40-2-112 (1)(a) A H-25-1154 230 30 05/22/2025 40-2-115 (1)(g) N H-25-1280 157 1 04/30/2025 2, 4 40-2-125.5 (2)(b) A H-25-1040 45 3 08/06/2025 4 40-2-128 (1)(a)(I)(A) A S-25-165 370 4 08/06/2025 4 40-2-128 (2)(a)(I) A S-25-165 370 4 08/06/2025 4 40-2-128 (2)(a.5) N S-25-165 370 4 08/06/2025 4 40-2-128 (3) N S-25-165 370 4 08/06/2025 4 40-2-129 IP(1)(a)(I) A S-25-275 377 29 08/06/2025 3 40-3-104.3 (6)(b)(I) A H-25-1177 209 1 05/19/2025 3 40-3-104.3 (6)(b)(II)(B) A H-25-1177 209 1 05/19/2025 3 40-3-104.3 (6)(b)(III) A H-25-1177 209 1 05/19/2025 3 40-3-104.3 (6)(c)(I) A H-25-1177 209 1 05/19/2025 3 40-3-104.3 (6)(c)(IV) N H-25-1177 209 1 05/19/2025 3 40-3-104.3 (6)(c)(V) N H-25-1177 209 1 05/19/2025 3 40-3-104.3 (6)(c)(VI) N H-25-1177 209 1 05/19/2025 3 40-3-104.3 IP(6)(d)(I) A H-25-1177 209 1 05/19/2025 3 40-3-104.3 IP(6)(d)(II) A H-25-1177 209 1 05/19/2025 3 40-3-104.3 (6)(d)(II)(A) A H-25-1177 209 1 05/19/2025 3 40-3-104.3 (7) A H-25-1177 209 1 05/19/2025 3 40-3-104.3 (8) A H-25-1177 209 1 05/19/2025 4 40-3-114 (4)(b) A S-25-300 428 64 08/06/2025 4, 84 40-3.2-101.5 N S-25-275 377 323 08/06/2025 4, 207 40-3.2-102 (2) R S-25-275 377 336 08/06/2025 4 40-3.3-102 (4) A S-25-300 428 65 08/06/2025 4, 85 40-3.5-100.3 N S-25-275 377 324 08/06/2025 4, 208 40-3.5-101 (4) R S-25-275 377 336 08/06/2025 3, 4 40-4-106 (5) N H-25-1110 66 1 08/06/2025 3, 4 40-4-106 (6) N H-25-1110 66 1 08/06/2025 4 40-4-122 N H-25-1175 222 1 08/06/2025 4 40-8.5-102 A S-25-068 55 1 08/06/2025 4 40-8.5-103 (3) A S-25-068 55 2 08/06/2025 4 40-8.5-103 (4) A S-25-068 55 2 08/06/2025 4 40-8.5-106 A S-25-068 55 3 08/06/2025 4 40-8.7-105.5 (1)(b)(I) A S-25-300 428 66 08/06/2025 2 40-8.7-112 (2)(c) A S-25-317 385 50 06/03/2025 2 40-8.7-112 (2)(c.5) N S-25-317 385 50 06/03/2025 2, 3 40-10.1-101 (8.5) N H-25-1117 391 2 06/03/2025 2, 3 40-10.1-101 (11) A H-25-1117 391 2 06/03/2025 2, 3 40-10.1-101 (14) A H-25-1117 391 2 06/03/2025 2, 3 40-10.1-101 (22) A H-25-1117 391 2 06/03/2025 4 40-10.1-403 (6) A S-25-175 321 2 08/06/2025 2 40-10.1-509 A H-25-1215 312 14 05/30/2025 4 40-10.1-607.5 (1)(b) R S-25-300 428 67 08/06/2025 2, 3 40-10.1-8 (entire part 8) A H-25-1117 391 3 06/03/2025 40-17- (entire article 17) RE H-25-1154 230 15 05/22/2025 126, 128 40-17-102 (7) N H-25-1154 230 31 05/22/2025 127 40-17-104 (7) N S-25-264 129 47 04/25/2025 4 40-17.5-101 (9.5) N S-25-031 147 5 08/06/2025 4 40-18-104 A S-25-052 21 1 08/06/2025 2 40-20-302 (5.5) N S-25-162 420 2 06/04/2025 2 40-20-302 (8.5) N S-25-162 420 2 06/04/2025 2 40-20-302 (9) A S-25-162 420 2 06/04/2025 2 40-20-302 (23.5) N S-25-162 420 2 06/04/2025 2 40-20-306 IP(1) A S-25-162 420 3 06/04/2025 2 40-20-306 (4) A S-25-162 420 3 06/04/2025 2 40-20-306 (5) N S-25-162 420 3 06/04/2025 2 40-20-306 (6) N S-25-162 420 3 06/04/2025 2 40-20-308 (3) A S-25-162 420 4 06/04/2025 2 40-20-309 (4) N S-25-162 420 5 06/04/2025 2 40-20-309 (5) N S-25-162 420 5 06/04/2025 2 40-20-309.5 N S-25-162 420 6 06/04/2025 2 40-20-311 IP(3) A S-25-162 420 7 06/04/2025 2 40-20-311 (5) A S-25-162 420 7 06/04/2025 2 40-20-311 (6) A S-25-162 420 7 06/04/2025 2 40-20-311 (9) A S-25-162 420 7 06/04/2025 2 40-20-311 (15) N S-25-162 420 7 06/04/2025 2 40-20-311 (16) N S-25-162 420 7 06/04/2025 2 40-20-311 (17) N S-25-162 420 7 06/04/2025 2 40-20-311 (18) N S-25-162 420 7 06/04/2025 2 40-20-311 (19) N S-25-162 420 7 06/04/2025 2 40-20-311.5 N S-25-162 420 8 06/04/2025 2 40-20-313 (3) A S-25-162 420 9 06/04/2025 40-29-116 (3) A S-25-264 129 48 04/25/2025 40-41-102 (7)(a)(III) A S-25-007 281 4 05/29/2025 40-41-102 (7)(a)(IV) N S-25-007 281 4 05/29/2025 TITLE 42 Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date 3, 4 42-1-102 (1.5) N H-25-1197 279 2 08/06/2025 3, 4 42-1-102 (28.5) A H-25-1197 279 2 08/06/2025 3, 92 42-1-102 (45.3) N H-25-1281 176 2 07/01/2027 3, 4 42-1-102 (47.7) N H-25-1197 279 2 08/06/2025 3, 92 42-1-102 (58)(a) A H-25-1281 176 2 07/01/2027 2 42-1-102 (60.1) N H-25-1320 236 25 05/23/2025 3, 4 42-1-102 (60.2) N H-25-1197 279 2 08/06/2025 2 42-1-102 (88) A H-25-1320 236 25 05/23/2025 2 42-1-102 (88.5)(a) A H-25-1320 236 25 05/23/2025 3, 4 42-1-102 (88.7) N H-25-1197 279 2 08/06/2025 3, 92 42-1-210 (1)(a)(II) A H-25-1189 395 1 07/01/2027 2, 138 42-1-211 (2) A S-25-317 385 51 06/03/2025 3, 92, 138 42-1-211 (2) A H-25-1121 392 4 07/01/2027 3, 4 42-1-222 A H-25-1076 16 17 08/06/2025 2 42-1-226 A H-25-1215 312 15 05/30/2025 3, 4 42-1-237 N H-25-1076 16 6 08/06/2025 3, 4, 6 42-2-104 (4)(a)(II)(A) A H-25-1076 16 10 08/06/2025 3, 4, 6 42-2-106 (1)(a)(I) A H-25-1076 16 11 08/06/2025 3, 4, 6 42-2-106 (1)(b)(I) A H-25-1076 16 11 08/06/2025 3, 4, 6 42-2-106 (1)(d) A H-25-1076 16 11 08/06/2025 1 42-2-107 (2)(a)(III) A H-25-1312 205 11 10/01/2026 3, 4 42-2-107 (2)(b)(I)(B) R H-25-1076 16 12 08/06/2025 2 42-2-107 (4)(b)(VIII) R S-25-122 447 2 06/04/2025 3, 4 42-2-112 (1) A H-25-1076 16 13 08/06/2025 3, 4 42-2-112 (2) A H-25-1076 16 13 08/06/2025 3, 4 42-2-112 (3) A H-25-1076 16 13 08/06/2025 3, 4 42-2-114.5 (3) A H-25-1076 16 14 08/06/2025 4 42-2-114.5 (7) R S-25-300 428 70 08/06/2025 2, 4 42-2-114.5 (8) N S-25-008 207 3 08/06/2025 2 42-2-118 (1)(a)(II)(B) R S-25-122 447 3 06/04/2025 100 42-2-118 (2) A H-25-1083 413 1 01/01/2027 100 42-2-118 (6) N H-25-1083 413 1 01/01/2027 3, 4 42-2-136 (6)(c) N H-25-1076 16 2 08/06/2025 3, 4 42-2-145 N H-25-1076 16 16 08/06/2025 1 42-2-302 (2.5)(b) A H-25-1312 205 12 10/01/2026 2, 4 42-2-306 (3) N S-25-008 207 4 08/06/2025 2 42-2-505 IP(1) A S-25-276 240 3 05/23/2025 2 42-2-505 (1)(d) R S-25-276 240 3 05/23/2025 3, 4, 7 42-2-505 (1)(e)(II) A H-25-1076 16 15 08/06/2025 1 42-2-505 (1.5)(b) A H-25-1312 205 13 10/01/2026 2, 3, 4 42-2-603 (3) A S-25-149 266 10 08/06/2025 4 42-3-101.5 N S-25-275 377 325 08/06/2025 3, 92 42-3-102 (3)(a) A H-25-1189 395 2 07/01/2027 3, 92 42-3-102 (5) N H-25-1121 392 1 07/01/2027 3, 92 42-3-107 (25)(b) A H-25-1121 392 2 07/01/2027 3, 92 42-3-107 (29) N H-25-1121 392 2 07/01/2027 4 42-3-113 (1)(a) A S-25-275 377 326 08/06/2025 3, 4 42-3-213 (1)(a)(XVIII) R H-25-1076 16 8 08/06/2025 3, 4 42-3-213 (1)(a)(XXV) R H-25-1076 16 8 08/06/2025 3, 4 42-3-213 (19) R H-25-1076 16 8 08/06/2025 3, 4 42-3-213 (26) R H-25-1076 16 8 08/06/2025 3, 4 42-3-230 R H-25-1076 16 9 08/06/2025 42-3-301 (1)(c) N S-25-293 380 1 06/03/2025 3, 4 42-3-304 IP(3) A H-25-1076 16 7 08/06/2025 3, 4 42-3-304 (3)(a) A H-25-1076 16 7 08/06/2025 3, 4 42-3-304 (3)(b) R H-25-1076 16 7 08/06/2025 2 42-3-304 (18)(a) A S-25-317 385 52 06/03/2025 2 42-3-304 (18)(a.5) N S-25-317 385 52 06/03/2025 42-3-304 (18)(e) N S-25-321 387 8 06/03/2025 3, 92 42-3-304 (22) A H-25-1189 395 3 07/01/2027 4 42-3-313 (2)(c)(III) A S-25-300 428 68 08/06/2025 3, 92 42-3-315 N H-25-1121 392 3 07/01/2027 4 42-4-106 (5)(a)(I)(B) A S-25-069 196 1 08/06/2025 3, 92 42-4-109.7 N H-25-1281 176 3 07/01/2027 3, 4 42-4-110 IP(1) A H-25-1112 348 1 08/06/2025 3, 4 42-4-110 (1)(d) A H-25-1112 348 1 08/06/2025 3, 4 42-4-110 (3) A H-25-1112 348 1 08/06/2025 3 42-4-110.5 (1.1)(a)(II) A H-25-1230 249 1 05/24/2025 3 42-4-110.5 (1.1)(a.7) N H-25-1230 249 1 05/24/2025 4 42-4-110.5 (1.5) A S-25-300 428 69 08/06/2025 3 42-4-110.5 (2)(d)(III) N H-25-1230 249 1 05/24/2025 3 42-4-110.5 (2)(g)(III) A H-25-1230 249 1 05/24/2025 3 42-4-110.5 (4.6) N H-25-1230 249 1 05/24/2025 3, 4 42-4-111 (1)(gg) N H-25-1112 348 2 08/06/2025 3, 4 42-4-221 (9)(c) N H-25-1197 279 1 08/06/2025 3, 4 42-4-221 (10)(d) N H-25-1197 279 1 08/06/2025 3, 4 42-4-221 (11) A H-25-1197 279 1 08/06/2025 3, 4 42-4-221 (12) N H-25-1197 279 1 08/06/2025 3, 4 42-4-221 (13) N H-25-1197 279 1 08/06/2025 3, 4 42-4-221 (14) N H-25-1197 279 1 08/06/2025 3, 92 42-4-225 (1.5) A H-25-1039 197 1 07/01/2027 3, 92 42-4-225 (3) A H-25-1039 197 1 07/01/2027 4 42-4-236 (1)(a) A S-25-300 428 71 08/06/2025 42-4-304 IP A S-25-321 387 1 06/03/2025 42-4-304 (5) A S-25-321 387 1 06/03/2025 3, 92 42-4-304 (19)(b)(II) A H-25-1281 176 4 07/01/2027 42-4-306 (3)(a)(I)(C) A S-25-321 387 2 06/03/2025 42-4-306 (3)(b)(IV) A S-25-321 387 2 06/03/2025 42-4-306 (3)(b)(V)(A) A S-25-321 387 2 06/03/2025 42-4-306 (3)(b)(VI) N S-25-321 387 2 06/03/2025 42-4-306 (8)(c) N S-25-321 387 2 06/03/2025 42-4-306 (13) A S-25-321 387 2 06/03/2025 42-4-307 (10)(b) A S-25-321 387 3 06/03/2025 42-4-307 (17) N S-25-321 387 3 06/03/2025 3, 92 42-4-309 (3)(b) A H-25-1281 176 5 07/01/2027 3, 92 42-4-310 (2)(a) A H-25-1281 176 6 07/01/2027 42-4-311 (4)(a)(I) A S-25-321 387 4 06/03/2025 42-4-311 (6)(a) A S-25-321 387 4 06/03/2025 42-4-311 (6)(b) A S-25-321 387 4 06/03/2025 3, 4 42-4-313 (5) N H-25-1076 16 3 08/06/2025 42-4-314 (1) A S-25-321 387 5 06/03/2025 42-4-314 (2) A S-25-321 387 5 06/03/2025 42-4-314 (7) N S-25-321 387 5 06/03/2025 4 42-4-316 (2) R H-25-1054 7 1 08/06/2025 4 42-4-316 (3)(b) R H-25-1054 7 1 08/06/2025 2 42-4-707 IP(1)(a) A H-25-1320 236 26 05/23/2025 2 42-4-707 IP(5) A H-25-1320 236 26 05/23/2025 2 42-4-707 (5)(a.5) N H-25-1320 236 26 05/23/2025 2, 3, 4 42-4-805 (1) A S-25-149 266 9 08/06/2025 4 42-4-1014 IP(1) A S-25-300 428 72 08/06/2025 3, 4 42-4-1208 IP(5) A H-25-1076 16 4 08/06/2025 4 42-4-1307 (10)(d)(II) A S-25-195 243 4 08/06/2025 3 42-4-1402 (2) A S-25-281 346 1 06/02/2025 4 42-4-1701 (4)(f)(III) A S-25-195 243 5 08/06/2025 3, 4 42-4-1720 N H-25-1112 348 3 08/06/2025 2 42-4-1901 (2)(b) A H-25-1320 236 27 05/23/2025 2 42-4-1902 A H-25-1320 236 28 05/23/2025 2 42-4-1903 (1)(a) A H-25-1320 236 29 05/23/2025 2 42-4-1903 IP(2)(a) A H-25-1320 236 29 05/23/2025 2 42-4-1903 (2)(a.5) N H-25-1320 236 29 05/23/2025 2 42-4-1903 (3) A H-25-1320 236 29 05/23/2025 3 42-4-1903 (4) A H-25-1230 249 2 05/24/2025 3, 92 42-5-202 (5) N H-25-1281 176 7 07/01/2027 3, 92 42-6-102 (6.5) A H-25-1281 176 8 07/01/2027 3, 92 42-6-102 (6.6) N H-25-1281 176 8 07/01/2027 3, 92 42-6-102 (6.7) N H-25-1281 176 8 07/01/2027 3, 92 42-6-102 IP(10) A H-25-1281 176 8 07/01/2027 3, 92 42-6-102 IP(11.5)(b)(I) A H-25-1281 176 8 07/01/2027 3, 92 42-6-102 (15) A H-25-1281 176 8 07/01/2027 3, 92 42-6-107 (1)(a)(III) A H-25-1189 395 4 07/01/2027 3, 92 42-6-206 IP(2) A H-25-1189 395 5 07/01/2027 3, 92 42-12-102 (1)(c) N H-25-1189 395 6 07/01/2027 3, 92 42-12-102 (2)(b) R H-25-1189 395 6 07/01/2027 3, 92 42-12-102 (2)(c) N H-25-1189 395 6 07/01/2027 3, 92 42-12-102 (3)(a) A H-25-1189 395 6 07/01/2027 42-20-511 A S-25-264 129 49 04/25/2025 TITLE 43 Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date 43-1-106 IP(15) A S-25-161 186 5 05/13/2025 43-1-106 (15)(f) N S-25-161 186 5 05/13/2025 4 43-1-136 (1) A S-25-300 428 73 08/06/2025 4 43-1-138 N S-25-030 185 1 08/06/2025 2 43-1-220 (3) N S-25-162 420 11 06/04/2025 2, 4 43-1-228 N H-25-1292 175 2 08/06/2025 4 43-1-604 N H-25-1007 76 1 08/06/2025 2, 4 43-1-1402 IP A H-25-1228 248 2 08/06/2025 2, 4 43-1-1402 (2) A H-25-1228 248 2 08/06/2025 4 43-2-150 A S-25-069 196 2 08/06/2025 4 43-4-205 (6.3) A S-25-258 424 1 08/06/2025 4 43-4-400.3 N S-25-275 377 327 08/06/2025 4 43-4-401 A S-25-275 377 328 08/06/2025 43-4-604 (3)(h) A S-25-272 314 2 05/30/2025 43-4-604 (3)(i) A S-25-272 314 2 05/30/2025 43-4-604 (3)(j) N S-25-272 314 2 05/30/2025 43-4-605 (1)(l) N S-25-272 314 3 05/30/2025 4 43-4-803 (26.2) N S-25-275 377 329 08/06/2025 4 43-4-804 IP(1)(a)(I) A S-25-258 424 2 08/06/2025 4 43-4-804 (1)(a)(IX) N S-25-258 424 2 08/06/2025 43-4-805 (5)(g.5)(II)(D) R S-25-320 386 2 06/03/2025 43-4-805 (5)(g.5)(II)(E) R S-25-320 386 2 06/03/2025 43-4-805 (5)(g.5)(II)(F) A S-25-320 386 2 06/03/2025 43-4-805 (5)(g.5)(II)(G) A S-25-320 386 2 06/03/2025 4 43-4-806 (3)(a) A S-25-275 377 330 08/06/2025 43-4-1103 (1)(c) N S-25-264 129 50 04/25/2025 43-4-1204 (3)(c)(I) A S-25-161 186 9 05/13/2025 43-4-1204 IP(3)(d) A S-25-161 186 9 05/13/2025 43-4-1204 (3)(d)(II)(A) A S-25-161 186 9 05/13/2025 43-4-1204 (3)(d)(II)(B) A S-25-161 186 9 05/13/2025 43-4-1204 (3)(d)(II)(C) A S-25-161 186 9 05/13/2025 43-4-1204 (3)(e) N S-25-161 186 9 05/13/2025 4 43-5-501 (3.6) A S-25-187 343 4 08/06/2025 4 43-5-503 (2)(a) A S-25-187 343 3 08/06/2025 4 43-5-504 (4) N S-25-187 343 5 08/06/2025 4 43-5-507 A S-25-187 343 2 08/06/2025 4 43-10-102 (7.2) N S-25-275 377 331 08/06/2025 4 43-10-109 (1) A S-25-275 377 332 08/06/2025 TITLE 44 Footnote C.R.S. Change Bill No. Chapter Bill § Effective Date 44-3-103 (21.3) N S-25-033 64 1 04/10/2025 44-3-303 (1)(c)(I) A S-25-033 64 3 04/10/2025 44-3-303 (1)(c)(II) R S-25-033 64 3 04/10/2025 44-3-303 (2) A S-25-033 64 3 04/10/2025 44-3-312 (2)(a) A S-25-033 64 4 04/10/2025 44-3-409 (5) R S-25-033 64 5 04/10/2025 44-3-410 (1)(a) A S-25-033 64 2 04/10/2025 44-3-410 (1)(b) R S-25-033 64 2 04/10/2025 44-3-410 (4)(b)(IV) R S-25-033 64 2 04/10/2025 44-3-410 (4)(b)(V) R S-25-033 64 2 04/10/2025 44-3-410 (4)(b)(VI) N S-25-033 64 2 04/10/2025 44-3-410 (4)(c) R S-25-033 64 2 04/10/2025 44-3-410 (7) A S-25-033 64 2 04/10/2025 44-3-410 (8) N S-25-033 64 2 04/10/2025 4 44-3-430 (2) A S-25-274 376 1 08/06/2025 44-3-501 (3)(a)(XVI) R S-25-033 64 6 04/10/2025 4 44-3-503 (9) A S-25-026 362 1 08/06/2025 44-3-505 (4)(a)(V) R S-25-033 64 7 04/10/2025 3 44-10-103 (52.5) N H-25-1209 398 1 01/05/2026 3 44-10-203 IP(1) A H-25-1209 398 2 01/05/2026 3 44-10-203 (1)(c) A H-25-1209 398 2 01/05/2026 3 44-10-203 (1)(j.5) A H-25-1209 398 2 01/05/2026 3 44-10-203 (1)(l) N H-25-1209 398 2 01/05/2026 3 44-10-203 (1)(m) N H-25-1209 398 2 01/05/2026 3 44-10-203 IP(2) A H-25-1209 398 2 01/05/2026 3 44-10-203 (2)(c) A H-25-1209 398 2 01/05/2026 3 44-10-203 (2)(e) A H-25-1209 398 2 01/05/2026 3 44-10-203 (2)(t) R H-25-1209 398 2 01/05/2026 3 44-10-203 (2)(x) A H-25-1209 398 2 01/05/2026 3 44-10-203 IP(2)(bb) A H-25-1209 398 2 01/05/2026 3 44-10-203 (2)(bb)(II) R H-25-1209 398 2 01/05/2026 3 44-10-203 IP(2)(dd) A H-25-1209 398 2 01/05/2026 3 44-10-203 (2)(dd)(V) A H-25-1209 398 2 01/05/2026 3 44-10-203 (2)(dd)(VI) R H-25-1209 398 2 01/05/2026 3 44-10-203 IP(2)(gg) A H-25-1209 398 2 01/05/2026 3 44-10-203 (2)(gg)(II) R H-25-1209 398 2 01/05/2026 3 44-10-203 (2)(kk) N H-25-1209 398 2 01/05/2026 3 44-10-203 (9)(b) A H-25-1209 398 2 01/05/2026 3 44-10-203 (10) N H-25-1209 398 2 01/05/2026 3 44-10-307 (1)(h) R H-25-1209 398 3 01/05/2026 3 44-10-307 (1)(j) A H-25-1209 398 3 01/05/2026 44-10-307 (4)(a) A S-25-146 342 14 06/02/2025 32 44-10-307 (4)(c) A S-25-146 342 14 06/02/2025 3, 32 44-10-307 (4)(c) A H-25-1209 398 3 01/05/2026 3 44-10-308 (3)(a) R H-25-1209 398 4 01/05/2026 3 44-10-313 (3) A H-25-1209 398 5 01/05/2026 3 44-10-313 (4) A H-25-1209 398 5 01/05/2026 3 44-10-313 (12) A H-25-1209 398 5 01/05/2026 3 44-10-313 (13)(c)(I)(B) A H-25-1209 398 5 01/05/2026 3 44-10-314 (1) A H-25-1209 398 6 01/05/2026 3 44-10-314 (2) A H-25-1209 398 6 01/05/2026 3 44-10-401 (3)(a) A H-25-1209 398 7 01/05/2026 3 44-10-401 (3)(b) A H-25-1209 398 7 01/05/2026 3 44-10-401 (3)(d) A H-25-1209 398 7 01/05/2026 3 44-10-501 (3)(e) A H-25-1209 398 8 01/05/2026 3 44-10-502 (5) A H-25-1209 398 9 01/05/2026 3 44-10-502 (6)(e) A H-25-1209 398 9 01/05/2026 3 44-10-503 (2) A H-25-1209 398 10 01/05/2026 3 44-10-503 (5)(b) A H-25-1209 398 10 01/05/2026 3 44-10-503 (10) A H-25-1209 398 10 01/05/2026 3 44-10-601 (3)(c) A H-25-1209 398 11 01/05/2026 3 44-10-602 (6)(a) A H-25-1209 398 12 01/05/2026 3 44-10-602 (6)(c) R H-25-1209 398 12 01/05/2026 3 44-10-602 (6)(d) A H-25-1209 398 12 01/05/2026 3 44-10-602 (6)(e) R H-25-1209 398 12 01/05/2026 3 44-10-602 (6)(f) R H-25-1209 398 12 01/05/2026 3 44-10-602 (6)(g) R H-25-1209 398 12 01/05/2026 3 44-10-602 (6)(h) A H-25-1209 398 12 01/05/2026 3 44-10-602 (6)(i) R H-25-1209 398 12 01/05/2026 3 44-10-602 (6)(j) R H-25-1209 398 12 01/05/2026 3 44-10-602 (7)(e) A H-25-1209 398 12 01/05/2026 3 44-10-603 IP(2) A H-25-1209 398 13 01/05/2026 3 44-10-603 (10) A H-25-1209 398 13 01/05/2026 3 44-10-603 (11) A H-25-1209 398 13 01/05/2026 3 44-10-604 (1)(a) A H-25-1209 398 14 01/05/2026 3 44-10-701 (2)(b) R H-25-1209 398 15 01/05/2026 3 44-10-701 (2)(d) A H-25-1209 398 15 01/05/2026 3 44-10-701 (2)(e) R H-25-1209 398 15 01/05/2026 3 44-10-801 IP(3)(a) A H-25-1209 398 16 01/05/2026 3 44-10-801 (3)(a)(IV) A H-25-1209 398 16 01/05/2026 3 44-10-801 (3)(a)(V) A H-25-1209 398 16 01/05/2026 3 44-10-801 (3)(a)(VI) N H-25-1209 398 16 01/05/2026 3 44-10-1001 (4) N H-25-1209 398 17 01/05/2026 4 44-10-1200.3 N S-25-275 377 333 08/06/2025 4 44-10-1201 (1) A S-25-275 377 334 08/06/2025 3 44-10-1201 IP(2) A H-25-1209 398 18 01/05/2026 3, 92 44-20-102 (12.5) N H-25-1281 176 9 07/01/2027 3, 92 44-20-102 (16) A H-25-1281 176 9 07/01/2027 44-20-118 (2) A S-25-146 342 15 06/02/2025 44-20-118 (8)(a) A S-25-146 342 16 06/02/2025 3, 4 44-20-121 IP(8)(a) A S-25-075 418 1 08/06/2025 3, 4 44-20-121 (8)(a.5) N S-25-075 418 1 08/06/2025 3, 92 44-20-131.5 N H-25-1281 176 10 07/01/2027 3, 92 44-20-402 (6.5) N H-25-1281 176 11 07/01/2027 3, 92 44-20-402 (11)(b) A H-25-1281 176 11 07/01/2027 3, 92 44-20-402 (11)(c) A H-25-1281 176 11 07/01/2027 3, 92 44-20-402 (11)(d) N H-25-1281 176 11 07/01/2027 44-20-417 (8)(a) A S-25-146 342 17 06/02/2025 3, 4 44-20-420 IP(8)(a) A S-25-075 418 2 08/06/2025 3, 4 44-20-420 (8)(a.5) N S-25-075 418 2 08/06/2025 3, 92 44-20-432.5 N H-25-1281 176 12 07/01/2027 4, 86 44-30-103 (7.5) N S-25-275 377 335 08/06/2025 2 44-30-701 IP(1) A S-25-317 385 53 06/03/2025 2 44-30-701 (1)(c) A S-25-317 385 53 06/03/2025 4 44-30-701 (2)(a)(II) A S-25-225 118 1 08/06/2025 4 44-30-701 (2)(d) N S-25-225 118 1 08/06/2025 4, 209 44-30-821 (2) R S-25-275 377 336 08/06/2025 4 44-30-1501 IP(7)(c)(I) A H-25-1311 195 1 08/06/2025 4 44-30-1501 (7)(c)(I)(C) A H-25-1311 195 1 08/06/2025 4 44-30-1501 (7)(c)(I)(D) A H-25-1311 195 1 08/06/2025 4 44-30-1501 (7)(c)(I.5) N H-25-1311 195 1 08/06/2025 44-30-1603 (1) A S-25-146 342 13 06/02/2025 44-30-1603 (1.5) N S-25-146 342 13 06/02/2025 44-30-1603 (2) A S-25-146 342 13 06/02/2025 44-30-1603 (6.1) N S-25-146 342 13 06/02/2025 44-30-1603 (6.5) N S-25-146 342 13 06/02/2025 44-32-102 (1) A S-25-146 342 19 06/02/2025 44-32-102 (1.5) N S-25-146 342 19 06/02/2025 44-32-102 (13.3) N S-25-146 342 19 06/02/2025 44-32-102 (13.7) N S-25-146 342 19 06/02/2025 44-32-102 (23.5) N S-25-146 342 19 06/02/2025 44-32-503 (4)(a) A S-25-146 342 18 06/02/2025 2 44-40-111 (12)(a)(I.5) N H-25-1215 312 16 05/30/2025 2 44-40-111 (12)(a)(III.5) N H-25-1215 312 16 05/30/2025 2 44-40-111 (12)(b)(III) A H-25-1215 312 16 05/30/2025 2 44-40-111 (12)(b)(IV) A H-25-1215 312 16 05/30/2025 2 44-40-111 (12)(b)(V) N H-25-1215 312 16 05/30/2025 2 44-40-111 (12)(b)(VI) N H-25-1215 312 16 05/30/2025 44-50-202 (1)(g) A S-25-297 381 3 06/03/2025 44-50-202 (7) R S-25-297 381 3 06/03/2025 44-50-203 IP(1) A S-25-297 381 4 06/03/2025 44-50-203 (1)(n) A S-25-297 381 4 06/03/2025 44-50-203 (1)(o) N S-25-297 381 4 06/03/2025 44-50-203 IP(2) A S-25-297 381 4 06/03/2025 44-50-203 (2)(d) A S-25-297 381 4 06/03/2025 44-50-203 (2)(q) A S-25-297 381 4 06/03/2025 44-50-203 (2)(r) A S-25-297 381 4 06/03/2025 44-50-203 (2)(s) N S-25-297 381 4 06/03/2025 44-50-203 (4) A S-25-297 381 4 06/03/2025 44-50-401 (1) A S-25-297 381 5 06/03/2025 44-50-401 (6) N S-25-297 381 5 06/03/2025 44-50-601 (2) A S-25-297 381 6 06/03/2025 44-50-601 (3)(c) A S-25-297 381 6 06/03/2025 Quick Links Red Book Archive